A Test Study on the Static/Dynamic Response of PC Structures According to the Connection Method and Damage Degree of PC Concrete Structures for Rapid Application of PC Concrete Construction Around Railway Stations (철도정거장 주변 PC 콘크리트 급속 시공 적용을 위한 PC 콘크리트 구조물 연결 방법 및 손상 정도에 따른 PC 구조물 정적/동적 응답에 대한 실험적 연구)

  • Park, Chang-Jin;Jeong, Han-Jung;Park, Yong-Gul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.5
    • /
    • pp.53-60
    • /
    • 2020
  • In this study, smart precast-in-place concrete, such as continuity with Precast any technology that can be the Application of Building Structures and railway stations, civil structures. After the same way in the field installation design based on the criteria railways and derived the right section, through the Static and Dynamic Response Analysis. Dynamic sensor and the triaxial acceleration measured by attaching the sensor acceleration response according to the extent of the damage of Precast Panel Structures and mode of Precast Structures, by comparing the data. Data for the stability and improvement of the uncertainty in along a railroad and Future of Precast Panel Structures of time to replace. This is to use this data as basic data on damage prediction.

Mechanical behaviour of rib-reinforced precast tunnel liner according to variable rib-reinforcement shapes (프리캐스트 터널 Liner의 리브보강 형상변화에 따른 역학적 거동 특성)

  • Lee, Gyu-Phil;Lee, Seong-Won;Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.265-275
    • /
    • 2009
  • Due to the limitation of construction efficiency and structural safety, the application of the high covering and wide width tunnels was limited prior to the introduction of precast rut and cover tunnels. Therefore, a cut and cover tunnel structure with rib reinforcement is proposed to mechanically improve the safety on condition of high covering and wide width tunnel. Therefore, a technical problem that can provide a response similar to the actual filling conditions is analyzed by the finite element analyses, moreover, the mechanical behaviour of developed rib-reinforced precast tunnel liner through a large-sized model test will be investigated. The ultimate load of the developed rib-reinforced precast tunnel liner shows a 3% reduction compared to existing rib-reinforced precast tunnel liner, especially, the section of rib-reinforcement decreased to 55% compared to it of existing. Therefore, the stability of tunnel structure can be significantly improved through the developed rib-reinforced precast segment.

Jacking Force and Camber for Precast Concrete Slab Reinforcing (프리캐스트 콘크리트 슬래브 보강을 위한 잭킹력과 솟음)

  • Lho, Byeong-Cheol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.2
    • /
    • pp.43-48
    • /
    • 2021
  • Precast concrete can be used to reduce construction period and enhance construct ability. However structural problems could be occurred due to the wrong application of boundary condition and misunderstanding of structural behavior in the process of segmentation of original structure system. I experienced a serious deflections and cracks due to the increase of bending moment and creep after the construction of precast concrete slab, and we learned that this is from the misunderstanding of support conditions and structure behaviors of precast slab panel. Two support columns under the precast slab are inserted to reduce the bending moment, and the camber according to jacking force should be estimated for the structural safety during the reinforcing work. A proper support condition and the flexural stiffness of precast concrete slab were applied to check the deflection and crack for existing structure by inverse analysis, and we can estimate the camber according to jacking force of the precast concrete slab, and suggest a method to make safe structure.

A Development of the Coupled Model by Rigid and Solid Bodies for Discontinuous Structures (불연속체 구조물의 해석을 위한 강체-고체 복합모델의 개발)

  • 김승덕;정하선
    • Computational Structural Engineering
    • /
    • v.11 no.4
    • /
    • pp.169-176
    • /
    • 1998
  • 불연속적 거동이 탁월한 벽식 프리캐스트 구조물을 해석하기 위한 방법으로 유한요소법과 강체요소법 등이 있으나, 이들 해석법은 접합부의 거동을 정확히 반영하지 못하고 있다. 본 연구에서는 패널은 강체적 거동을 하고, 판널과 판널 사이의 접합부는 고체적 거동을 가정하는 강체-고체 복합모델(Coupled Model by Rigid and Solid bodies)에 의한 해석법을 제안하며, 간단한 모델의 예를 통해 검증하였다.

  • PDF

Mechanical behaviour of tunnel liner using precast segment reinforced by rib (리브 보강 프리캐스트 터널 Liner의 역학적 거동 특성)

  • Lee, Gyu-Phil;Lee, Sung-Won;Shiin, Hyu-Soung;Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.295-302
    • /
    • 2008
  • Due to the limitation of construction efficiency and structural safety, the application of the high covering and wide width tunnels was limited prior to the introduction of precast cut and cover tunnels. Therefore, a cut and cover tunnel structure with rib reinforcement is proposed to mechanically improve the safety on condition of high covering and wide width tunnel. In this study, large-scale experiments are carried out to examine the mechanical behavior of the cut and cover tunnel structure with rib reinforcement under static load condition. Based on the results obtained from this study, the ultimate load of tunnel structure increases to about 3.3 times by rib reinforcement. Consequently, safety of tunnel structure increases compared to non-installed cases due to confining crown part by rib reinforcement.

  • PDF

Experimental Study on Flexural Capacity of Precast Steel Mesh Reinforced Mortar Panel (프리캐스트 스틸메쉬 보강 모르타르 패널의 휨 성능에 대한 실험적 연구)

  • Yi, Na Hyun;Kim, Jang Ho Jay;Lee, Sang Won;Kim, Tae Gyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.3
    • /
    • pp.10-19
    • /
    • 2013
  • Recently, researches related to precast modular construction have been actively conducted for nuclear power plant, LNG gas tank, and small-medium PCCV as well as bridges and buildings. In this study, the precast panel cast with steel mesh reinforced mortar (SRM) which is similar reinforced ferrocement was developed for efficient precast construction, construction time reduction, and easy transportation. Mortar mixture with high strength and flowability was obtained from various case studies using silica fume and GGBS. Also, $1,200{\times}600{\times}150mm$ SRM and reinforced concrete (RC) panels were manufactured with reinforcing ratio of 2% and 4%. To verify structural performance of the SRM specimen, the basic material tests, free shrinkage test, and 3-point flexural test with a line loading were carried out. From the test results, it was determined that SRM specimens showed outstanding flexural capacity and ductility. However, the 4% reinforced SRM specimens must consider shear reinforcing to be used as a precast modular member.

Anchorage Zone Design of Precast Prestressed Concrete Bridges (프리캐스트 프리스트레스트 콘크리트 교량 구조물의 정착부 설계에 관한 연구)

  • 임동환;오병환;김수석
    • Magazine of the Korea Concrete Institute
    • /
    • v.8 no.3
    • /
    • pp.209-218
    • /
    • 1996
  • The purpose of the present study is to explore the effects of local reinforced type and to suggest reliable failure mechanism and the design criteria on the anchorage zones of the precast prestressed concrete bridges. To accomplish these objectives, a comprehensive experimental and analytical study has been conducted. From this study, the cracking and ultimate load capacities for spirally reinforced anchorage zone are found to be larger than those for orthogonal reinforced anchorage zone. This indicate the effectiveness of spiral reinforcement in controlling the cracking. And realistic failure mechanism and design criteria of prestressed anchorage zones based on the present study are suggested.

Fatigue Performance of Precast Decks using Ribbed Loop Joints in a Two-Girder Continuous Composite Bridge (2거더 연속합성형교 요철형 루프이음 프리캐스트 바닥판의 피로성능)

  • Lee, Han-Joo;Yeo, Woon-Young;Shin, Dong-Ho;Kim, In-Gyu;Park, Se-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.85-93
    • /
    • 2019
  • Structural performance and serviceability of precast deck system are mostly determined by connection details between precast decks. Particularly, since the bridge deck is under repeated loads such as traffic loads, fatigue behavior and performance of joints should be investigated. In this study, a two-girder continuous composite bridge specimen was fabricated using the asymmetric ribbed loop joints, and static and fatigue load tests were conducted to evaluate the structural behavior and the crack pattern of the bridge deck. From the test results, the proposed precast deck system resulted in sufficient fatigue performance and failure strength. Therefore, the proposed precast deck system can be applied to the connection part of precast decks effectively.

Flexural Strength Estimation of Half-Depth Precast Concrete Composite Slab Manufactured by the Long-Line Method (롱라인 공법으로 제작한 반단면 프리캐스트 콘크리트 합성 슬래브의 휨강도 평가)

  • Choi, Jin-Woo;Seo, Su-Hong;Joo, Hyung-Joong;Yoon, Soon-Jong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.4
    • /
    • pp.48-56
    • /
    • 2013
  • Prestressed concrete (PSC) members are readly available in civil engineering applications due to the convenience of construction and easy of quality control in the manufacturing process of the member. Especially, half-depth precast concrete composite slab, which is one of the PSC flexural members is developed recently using the long-line method. The half-depth precast concrete composite slabs are composed of the precast concrete and the in-situ concrete placed at the site. In this paper, we present the results of experimental investigations pertaining to the pretensioning efficiency and the flexural behavior of half-depth precast concrete composite slab which is made of precast PSC manufactured by the long-line method. In the long-line method, the pretensioned precast member is manufactured simultaneously, by tensioning tendons at once. In addition, we suggest the equation that can estimate the flexural strength of half-depth precast concrete composite slab reasonably by considering the effects of rebar embedded in the precast PSC flexural member.

Numerical analyses for mechanical behavior of cut-and-cover tunnel with precast arch type (프리캐스트 아치형 개착식 터널의 역학적 거동에 관한 수치해석)

  • Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.315-325
    • /
    • 2009
  • The thickness of the material can be thinned because arch cut-and-cover tunnel has the support mechanism by the axial force, and the ground reaction force due moderate deformation can be expected thereby making it be dynamically advantageous, therefore the arch cut-and-cover tunnel has become more widely used. An important characteristic of the arch cut-and-cover tunnel is that the thickness of the material can be thinned because precast arch type has the support mechanism by the axial force. However, there is a different stress state surrounding the structures between normally excavated tunnels and cut-and-cover tunnels, it should be considered at designing. Therefore, finite element method was carried out to examine the mechanical behavior of the precast arch cut-and-cover tunnel considering construction procedure.