• Title/Summary/Keyword: 프리스트레스 강연선

Search Result 41, Processing Time 0.027 seconds

Long-term Behavior of Precast Circular Composite Piers with Bonded Tendons (강연선으로 긴장한 강재매입형 조립식 합성교각의 장기거동)

  • Yoon, Jae-Young;Shim, Chang-Su;Chung, Young-Soo;Lim, Hyun-Sik
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.205-208
    • /
    • 2008
  • Steel-embedded composite piers can enhance the resistance of core concrete by confinement of the steel elements and also can strengthen the stability of the embedded steel elements by concrete parts, so that the resistance of the composite members and seismic requirements can be provided without increasing section dimensions and self-weight. While modular composite piers with single segment do not need prestressing, precast segment composite piers with multiple segments need to have prestressing to prevent excessive cracking at the joints. Initial stresses and deformation by the introduced prestress are changed by long-term properties of concrete and need to be considered in the design. This paper deals with the prestress losses by the measurement of load cells, strains of reinforcements, concrete and embedded steel tubes.

  • PDF

Anchorage Behavior of Bi Prestressed Concrete Girders (프리스트레스트 콘크리트거더의 정착구 거동 분석)

  • Lee, Pil-Goo;Kim, Choong-Eon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.361-364
    • /
    • 2008
  • This study was performed to estimate the anchorage behavior for Bi Prestressed Concrete Girder(Bicon girder) which could introduce effectively prestressed forces into concrete girders. A bicon girder is manufactured by means of introducing pure bending moment that prestress simultaneously the compressive member(steel bar) and the tensile member(steel tendon). Therefore, the steel bar and the steel tendon must be unified in both ends and compressive and tensile force be offset. Anchorage dimension of 6 test specimens was designed under PTI specification which defined maximum stress and deformation to estimate structural behavior. Test results showed that the stress and the deformation of anchorage were within limits if the steel bar behaviored elastically.

  • PDF

Measurement of Lateral Prestress Force of UHPC Cross Beam using the Smart Tendon (스마트강연선을 이용한 UHPC 가로보의 횡방향 긴장력 계측)

  • Kim, Hyun-Woo;Kim, Jae-Min;Kim, Young-Jin;Kim, Young-Sang
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.178-181
    • /
    • 2011
  • 본 연구에서는 광섬유센서를 내장한 스마트강연선을 이용하여 초고성능콘트리트로 제작된 하이브리드 사장교 세그먼트의 횡방향 도입 긴장력을 계측하고 세그먼트 내부의 프리스트레스를 계측하여 즉시손실에 해당하는 정착장치 활동에 의한 손실과 마찰손실을 도로교설계기준(2005)의 설계 마찰손실과 비교하였다. 제작된 2개의 UHPC 사장교 세그먼트는 횡방향 길이 16.7m, 종방향 길이 1.75m, 높이 1.5m이며 각 시험체의 1/4, 1/2, 3/4지점에 긴장력을 계측하기 위해 3개의 FBG센서를 배치하였다. 긴장력은 유압잭을 이용하여 5개의 강연선에 동시에 순차적으로 도입되었으며, 단부에서 최대 도입 긴장력은 세그먼트 1은 734kN, 세그먼트 2는 639kN이었다. 도로교설계기준에 제시된 마찰계수의 중간값(파상마찰계수=0.00405, 곡률마찰계수=0.20)을 사용하여 FBG센서 위치에서 계산된 긴장력은 계측치와 5% 이내의 차이를 보였으며, 정착장치 활동에 의한 순간손실은 긴장단에서 최대 12.8%로 계측되었다. 이로부터 이 연구에서 제시하는 긴장력계측방법의 적용성을 입증할 수 있었으며, 향후 이 방법은 프리스트레스트 콘크리트 교량의 설계기준 마찰계수 개정을 위한 연구에 좋은 도구로 활용될 수 있을 것으로 기대된다.

  • PDF

Fatigue Behavior of Prestressed Concrete Beams Using FRP Tendons (FRP 긴장재를 이용한 프리스트레스트 콘크리트 보의 피로 거동)

  • Kim, Kyoung-Nam;Park, Sang-Yeol;Kim, Chang-Hoon
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.2
    • /
    • pp.135-144
    • /
    • 2011
  • Recently, researches about fiber reinforced polymer (FRP) which has excellent durability, corrosion resistance, and tensile strength as a substitution material to steel tendon have been actively pursued. This study is performed to examine FRP tendon used prestressed beam's safety under service load. The specimen was a prestressed concrete beam with internal bonded FRP tendon. In order to compare the member fatigue capacity, a control specimen of a prestressed concrete beam with ordinary steel tendon was tested. A fatigue load was applied at a load range of 60%, 70%, and 80% of the 40% ultimate load, which was obtained though a static test. The fatigue load was applied as a 1~3 Hz sine wave with 4 point loading setup. Fatigue load with maximum 1 million cycles was applied. The specimen applied with a load ranging between 40~60% did not show a fatigue failure until 1 million cycles. However, it was found that horizontal cracks in the direction of tendons were found and bond force between the tendon and concrete was degraded as the load cycles increased. This fatigue study showed that the prestressed concrete beam using FRP tendon was safe under a fatigue load within a service load range. Fatigue strength of the specimen with FRP and steel tendon after 1 million cycles was 69.2% and 59.8% of the prestressed concrete beam's static strength, respectively.

Slip Behavior of Anchorage Unifying Both PS Strand and Bar (강봉과 강연선이 일체화된 정착구의 슬립거동 평가)

  • Lee, Pil-Goo;Kim, Choong-Eon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.147-148
    • /
    • 2009
  • The anchorage system unified both PS strand and bar effectively introduced a prestress into a flexural concrete members. This study examined the relation between the anchorages of both ends and the introduced force and derived the equation for design.

  • PDF

Long Term Monitoring of Prestressing Tension Force in Post-Tension UHPC Bridge using Fiber Optical FBG Sensor (FBG 광섬유센서가 내장된 7연 강연선을 이용한 포스트텐션 UHPC 교량의 긴장력 장기모니터링)

  • Kim, Hyun-Woo;Kim, Jae-Min;Choi, Song-Yi;Park, Sung-Yong;Lee, Hwan-Woo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.6
    • /
    • pp.699-706
    • /
    • 2015
  • This paper presents results of one-year monitoring on prestressing force of a 7-wire steel post-tensioning strand which is installed in a UHPC(ultra high performance concrete) bridge with 11.0 m long, 5.0 m wide, and 0.6 m high by using a FBG-encapsulated 7-wire steel strand. The initial prestressing forces and the prestress changes during a vehicle load test were measured using the FBG-encapsulated strand. The results show that the FBG-encapsulated 7-wire strand is very effective for monitoring the prestress forces even the change in the tension force is very small. Additionally, it was indicated that selection of the thermal expansion coefficient which is used for the temperature correction shall be carefully carried out.

Experimental Evaluation for Ultimate Flexural Behaviors of PSC beams with A Corroded Tendon (PS강연선이 부식된 PSC보의 극한휨거동 평가실험)

  • Youn, Seok-Goo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.843-854
    • /
    • 2013
  • This paper presents experimental research work for the evaluation of ultimate flexural behaviors of prestressed concrete beams with a corroded tendon. In order to evaluate the effects of loss of prestress or loss of tendon area on the ultimate flexural strength of prestressed concrete beams, static load tests are conducted using five prestressed concrete beams. After exposing prestressing tendons in two test beams using 25mm drill bit, the exposed tendons were corroded using an accelerating corrosion equipment to simulate loss of tendon area. During the tests, steel strains, concrete strains and displacements at the center of test beams were measured, and acoustic emission measurements were conducted to detect wire fractures. Based on the test results, evaluation method for predicting flexural strength of prestressed concrete beams with corroded tendons is investigated. In addition, evaluation methods for predicting the existence of corroded tendons in post-tensioned prestressed concrete beams at service loads are discussed.

Detection of Fracture Signals of Low Prestressed Steel Wires in a 10 m PSC Beam by Continuous Acoustic Monitoring Techniques (연속음향감지기법을 이용한 긴장력이 감소된 10 m PSC보의 PS 강선 파단음파 감지)

  • Youn, Seok-Goo;Lee, Chang-No
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.1
    • /
    • pp.113-122
    • /
    • 2010
  • Corrosion of prestressing tendons and wire fractures in grouted post-tensioned prestressed concrete bridges have been considered as a serious safety problem. In bridge evaluation the condition of prestressing tendons should be inspected, and if corroded tendons are found, the loss of tendon area should be included when we calculate the ultimate strength. In the previous study, it was evaluated that continuous acoustic monitoring techniques could be considered as a reliable non-destructive method for detecting wire fractures of fully grouted post-tensioned prestressing tendons. In the present study, an experimental test was performed for detecting wire fractures of post-tensioned prestressing tendons which are prestressed lower than current design level. A 10 m prestressed concrete beam was fabricated, which included two tendons prestressed 66 percentage and 40 percentage of tensile strength, respectively. The corrosion of two tendons was induced by an accelerated corrosion equipment and the test beam was monitored by using seven acoustic sensors and a continuous acoustic monitoring system. From each prestressing tendon, two acoustic signals of wire fractures were successfully detected and source locations were estimated within 20 mm error. Based on the test results, it is considered that continuous acoustic monitoring techniques can be applied to detect low-prestressed wire fracture in fully grouted post-tensioned prestressed concrete beams.

Reduced model experiment to review applicability of tunnel pillar reinforcement method using prestress and steel pipe reinforcement grouting (프리스트레스 및 강관보강 그라우팅을 이용한 터널 필라부 보강공법의 적용성 검토를 위한 축소모형 실험)

  • Kim, Yeon-Deok;Lee, Soo-Jin;Lee, Pyung-Woo;Yun, Hong-Su;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.495-512
    • /
    • 2022
  • Due to the concentration of population in the city center, the aboveground structures are saturated, and the development of underground structures becomes important. In addition, it is necessary to apply the reinforcement construction method for the pillar part of the adjacent tunnel that can secure stability, economy, and workability to the site. In this study, the tunnel pillar reinforcement method using prestress and grouting was reviewed. There are various reinforcement methods that can compensate for the problems of the side tunnel, but as the tunnel pillar construction method using prestress and grouting is judged to be excellent in field applicability, stability, and economic feasibility, it is necessary to review the theoretical and numerical analysis of the actual behavior mechanism. Therefore, a scaled-down model experiment was conducted. The reduced model experiment was divided into PC stranded wire + steel pipe reinforcement grouting + prestress (Case 1), PC strand + steel pipe reinforcement grouting (Case 2), and no reinforcement (Case 3), and the displacement of the pillar and the earth pressure applied to the wall were measured. Through experiments, it was confirmed that the PC stranded wire + steel pipe reinforcement grouting + prestress method is the most excellent reinforcement method among various construction methods. It was judged that it could be derived.

Tunnel pillar reinforcement effect using PC stranded wire and groutings (PC강연선 및 그라우팅을 이용한 터널 필라부 보강효과)

  • Yeon-Deok Kim;Soo-Jin Lee;Pyung-Woo Lee;Hong-Su Yun;Sang-Hwan Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.43-63
    • /
    • 2023
  • With the concentration of the population in the city center and the saturation of the structures on the ground, the development of the underground structures becomes important and the construction of an adjoining tunnel that can reduce the overall problems is respected. In addition, it is necessary to apply the reinforcement construction method for the pillar part of the adjacent tunnel that can secure stability, economy and workability of the site. In this study, the tunnel pillar reinforcement method using prestress and grouting was reviewed. There are various reinforcement methods that can compensate for the problems of the side tunnel, but as the tunnel pillar construction method using prestress and grouting is judged to be excellent in field applicability, stability and economic feasibility, theoretical and numerical analysis of the actual behavior mechanism are conducted. Numerical analysis is divided into PC stranded wire + steel pipe reinforcement grouting + prestress (Case 1), pillar part tie bolt reinforcement (Case 2), pillar part non-reinforcement (Case 3) under the same ground conditions, and the maximum value of the celling displacement, internal displacement, and member force, the stability was confirmed. Through numerical analysis, it was confirmed that Case 1 which reinforced the PC stranded wire, was the best construction method and if it is verified and supplemented through field experiments later, it will be possible to derive superior results in terms of displacement control and member force than the currently applied reinforcement method was judged.