• Title/Summary/Keyword: 프로젝트 통합관리도구

Search Result 37, Processing Time 0.03 seconds

Study of CMM base Information Technology company level estimation (CMM 기반 정보기술 업체 수준평가에 관한 연구)

  • Kim Tai-Dal
    • Journal of Internet Computing and Services
    • /
    • v.5 no.1
    • /
    • pp.33-39
    • /
    • 2004
  • In this paper, so that government official in target extent of relevant shame capacitates CMM measuring achievement result by each process as quantitative because do standard, repeat and achieves gap analysis and estimation solidify knowledge management of information base enabling "Quality control, production management, cost control, integral management of knowledge", Solidify customer service through "high-quality, differentiation" of information. Establish administration and supervision item to reach 4 steps level in information ability measurement in formation to prove business efficiency through process optimization and improves formation maturity through voluntary effort of formation continuously. Suggested model who analyze and evaluates application in domestic SI specialty company.I specialty company.

  • PDF

Design of an Integrated Product Management System for Game Software Development (게임 소프트웨어 산출물 통합관리시스템 설계)

  • Kim, Byung-Cheol
    • Journal of Digital Convergence
    • /
    • v.13 no.12
    • /
    • pp.319-324
    • /
    • 2015
  • This paper proposes an integrated management system for products of game software development. Those products generated over software life-cycle are generally huge in numbers, various in kinds and interconnected in relationships among them. Especially they are highly complex and tightly coupled each other because they are used to build another world which is composed of multi-modal data such as graphics, sound, logics and so on. Therefore it is critical to manage development products in an integrated manner to guarantee the quality of software. The proposed system is designed to provide project/requirement/configuration/traceability management capabilities and interfacing to CASE standards. To achieve the objective, it is based on data warehouse technologies which provide central repositories of heterogeneous data, multi-aspect reporting&analysis capabilities, traceability, verification, etc.

A Review of Structure and Application of Unified Medical Language System(UMLS) (통합의학언어 시스템(UMLS)의 구성 및 적용에 대한 고찰)

  • Kim, Hye-Sun
    • Journal of Information Management
    • /
    • v.32 no.2
    • /
    • pp.26-39
    • /
    • 2001
  • Various controlled vocabularies such as thesaurus and classification used for effective information retrieval contain different terms in expressing the same concept or meaning. National Library of Medicine has developed the Unified Medical Language System(UMLS) to solve the problems of information retrieval and integration resulted from the difference of concepts between different sources. The UMLS development was initiated in 1982 as a long-term project, and the 2001 edition of the UMLS consists of three parts : Metathesaurus, Semantic Network, and SPECIALIST Lexicon. This paper reviews background and structure of the UMLS including applications in PubMed, NLM Gateway.

  • PDF

Communication Awareness Survey and Design Communication Method Using QFD (설계 커뮤니케이션 인식조사 및 QFD를 이용한 설계 커뮤니케이션 방안)

  • Bae, Yujung;Kwon, Won;Cho, Jaeho;Choi, Byungsun;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.50-58
    • /
    • 2017
  • The efficient communication process is essential to guarantee the completeness of design and secure the quality to meet the contractor's needs. However, using the existing communication methods based on the design and documents, it is difficult to effectively understand the drawings and specifications that are very complicated, and sufficient technical experiences would be required. Ineffective and inefficient communication among users, designers and project participants during the design process would raise the possibility of functional interferences of the object, induce conflicts, cause a design change, and accordingly incur losses of the project in terms of cost and time. The purpose of this study is to suggest improvement direction of communication in accordance with the requirements, by investigating the present state and the project participants' understanding of design communication. And also, it presents the application model of QFD that the project participants could share and define, and feedback the requirements as well as conducting analysis of improvement factors based on the survey.

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

A Study on Project Resource & Information Management with Internet Application(PRIMA system) (디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템))

  • Kim Oe-Gon;Lee Dong-Ryul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.88-97
    • /
    • 2001
  • The Internet, the main issue of a new millennium, is being researched vitally for the progress of the construction industry, and the construction industry is considered to be led into a high-value added state-of-arts technology industry through CALS. Even if many construction companies gradually widen the use of the Internet for various purposes such as an electronic bidding system and an e-commerce system, the companies are still demanded to use the Internet more broadly and practically. Hence, the need for a tool for fast decision making and an effective construction management has risen. The PRIMA system has been developed specifically focused on meeting with those recent changes of the construction industry. This system is composed of three parts. Those are Just In Time(JIT) management, integrated application of man power${\cdot}$safety${\cdot}$work management and decision making process based on real-time information in the Internet. The usefulness of the PRIMA system has already been proved in a super-scale construction project. As the Internet environment get improved the use of the tool will be spread out gradually for many construction projects, regardless their size and location.

  • PDF

A SOA-based Application Model for Building Intelligent Construction Supply Chain Management Framework (지능형 건설물류관리 체계 구축을 위한 SOA 적용 모델 개발)

  • Shin, Tae-Hong;Chin, Sang-Yoon;Yoon, Su-Won;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.733-737
    • /
    • 2008
  • Construction supply chain management focused on materials in construction industry plays a critical role which controls the success and failure of a project. For the efficiency of construction supply chain management, the framework which provides project participants with the information originated from whole construction logistics steps without the omission and discontinuation of information flow is required. The new management framework that can support this environment is necessary because of setting up the complicated and distributed environment including logistics information management by intelligent equipment, co-working management with pre-framework legacy system and various devices(UMPC and PDA etc.) as the information confirmation and electrical transmission tool between the project participants different from former construction supply chain management environment while recently developing ubiquitous technologies such as RFID/USN and intelligent equipment to support logistics process. Therefore, the objective of this study is to introduce the concept of SOA (Service Oriented Architecture) as an alternative of effective information integration under the complex and distributed environment and to propose the SOA-based application model for building intelligent construction supply chain management framework.

  • PDF

Design Information Management System Core Development Using Industry Foundation Classes (IFC를 이용한 설계정보관리시스템 핵심부 구축)

  • Lee Keun-hyung;Chin Sang-yoon;Kim Jae-jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.98-107
    • /
    • 2000
  • Increased use of computers in AEC (Architecture, Engineering and Construction) has expanded the amount of information gained from CAD (Computer Aided Design), PMIS (Project Management Information System), Structural Analysis Program, and Scheduling Program as well as making it more complex. And the productivity of AEC industry is largely dependent on well management and efficient reuse of this information. Accordingly, such trend incited much research and development on ITC (Information Technology in Construction) and CIC (Computer Integrated Construction) to be conducted. In exemplifying such effort, many researchers studied and researched on IFC (Industry Foundation Classes) since its development by IAI (International Alliance for Interoperability) for the product based information sharing. However, in spite of some valuable outputs, these researches are yet in the preliminary stage and deal mainly with conceptual ideas and trial implementations. Research on unveiling the process of the IFC application development, the core of the Design Information management system, and its applicable plan still need be done. Thus, the purpose of this paper is to determine the technologies needed for Design Information management system using IFC, and to present the key roles and the process of the IFC application development and its applicable plan. This system play a role to integrate the architectural information and the structural information into the product model and to group many each product items with various levels and aspects. To make the process model, we defined two activities, 'Product Modeling', 'Application Development', at the initial level. Then we decomposed the Application Development activity into five activities, 'IFC Schema Compile', 'Class Compile', 'Make Project Database Schema', 'Development of Product Frameworker', 'Make Project Database'. These activities are carried out by C++ Compiler, CAD, ObjectStore, ST-Developer, and ST-ObjectStore. Finally, we proposed the applicable process with six stages, '3D Modeling', 'Creation of Product Information', 'Creation and Update of Database', 'Reformation of Model's Structure with Multiple Hierarchies', 'Integration of Drawings and Specifications', and 'Creation of Quantity Information'. The IFCs, including the other classes which are going to be updated and developed newly on the construction, civil/structure, and facility management, will be used by the experts through the internet distribution technologies including CORBA and DCOM.

  • PDF

Development of KBIMS Architectural and Structural Element Library and IFC Property Name Conversion Methodology (KBIMS 건축 및 구조 부재 라이브러리 및 IFC 속성명 변환 방법 개발)

  • Kim, Seonwoo;Kim, Sunjung;Kim, Honghyun;Bae, Kiwoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.505-514
    • /
    • 2020
  • This research introduces the method of developing Korea BIM standard (KBIMS) architectural and structural element library and the methodology of converting KBIMS IFC property names with special characters. Diverse BIM tools are utilizing in project, however BIM library researches lack diversity on BIM tool selection. This research described the method to generate twelve categories and seven hundred and ninety-three elements library containing geometrical and numerical data in CATIA V6. KBIMS has its special property data naming systems which was the challenge inputting to ENOVIA IFC database. Three mapping methods for special naming characters had been developed and the ASCII code method was applied. In addition, the convertor prototype had been developed for searching and replacing the ASCII codes into the original KBIMS IFC property names. The methodology was verified by exporting 2,443 entities without data loss in the sample model conversion test. This research would provide a wider choice of BIM tool selection for applying KBIMS. Furthermore, the research would help on the reduction of data interoperability issues in projects. The developed library would be open to the public, however the continuous update and maintenance would be necessary.

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.