• Title/Summary/Keyword: 프로젝트 정보관리

Search Result 1,105, Processing Time 0.037 seconds

A Study on the Development of the Pilot Test Model to Examine the Applicability of the BIM Technology to PMIS (BIM 기술 기반 PMIS 개발에 관한 실험적 연구)

  • Choi, Jeong-Min;Ock, Jong-Ho;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.315-320
    • /
    • 2008
  • Construction industry have been occurred to the various demand of information. Also information quantity is increasing therefore, The role of information systems is important. Recently PMIS, an efficient decision-making support instrument of construction industry, is applied to various projects. However, its utility is still not enough. So this study suggests the concept model on the basis BIM to settle such a problem. Building the Pilot System was based on this study, and present the direction from Advanced PMIS.

  • PDF

A Study On A Test Automation Design Model Based On V Model (V모델 기반의 테스트 자동화 설계 모델에 대한 연구)

  • Choi, Ji-Hoon;Park, Koo-Rack;Park, Won-Cheol
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2020.07a
    • /
    • pp.593-594
    • /
    • 2020
  • 본 논문은 급격하게 발전하는 IT기술의 발전과 그로 인한 기업들의 경쟁 속에서 수 많은 프로젝트들이 생성되는 현대 사회에서 이런 프로젝트들이 경쟁에서 이길 수 있도록 프로젝트가 빠르고 완성도 있게 만들어질 필요를 느끼고 기존의 프로젝트 개발 방법론과 테스트 설계 방법론 중 V모델을 연구해서 프로젝트 관리 시스템에 등록된 데이터를 기반으로 테스트가 자동 설계될 수 있게 함으로써 프로젝트 전체 기간을 줄이고 프로젝트 비용을 줄일 수 있는 방법을 제안한다. 이 논문에서 제안하는 모델을 확장시켜서 프로젝트 테스트 관리에 불필요한 설계 시간과 테스트 관리에 수월할 것이라 기대한다.

  • PDF

정보시스템 프로젝트 관리

  • Jo, Min-Ho;Seol, Jeung-Ung
    • Digital Contents
    • /
    • no.8 s.75
    • /
    • pp.86-90
    • /
    • 1999
  • 지난 연재를 통하여 정보시스템 프로젝트의 성공적인 관리를 위한 성공요인과 실패요인, 그리고 관리요소와 프로젝트 관리 프로세스에 대해 살펴보았고, 이제 우리는 과거의 실사례를 되짚어 읽어 봄을 통해 반면교사(反面敎辭)하는 기회를 가져보고자 한다. 본 고에서 제시된 사례들은 저자들이 실제 가까이에서 경험한 것들도 있고 이미 널리 알려진 사례들도 있으나, 지금까지 제시한 성공 및 실패요인과 관리요소, 그리고 프로세스 관점에 따라 재해석해 보는 기회를 가져보는 것도 의미가 있다고 하겠다.

  • PDF

A Case Study of Copyright Management on Digital Library (디지털도서관에서의 저작권관리에 관한 사례연구 - LC의 CORDS 프로젝트를 중심으로 -)

  • 오영화;최석두
    • Proceedings of the Korean Society for Information Management Conference
    • /
    • 1996.08a
    • /
    • pp.111-114
    • /
    • 1996
  • 전자출판, 하이퍼미디어, 정보관리기술을 주요 기술요소로 한 디지털도서관이 출현하게 되어 정보의 접근과 전달의 문제는 해결하였으나, 동시에 해결해야 할 새로운 문제가 발생하였다. 그것은 디지털도서관의 대상데이터인 정보의 생산과 배포, 이용의 과정에서 발생하는 저작권의 문제인 것이다. 디지털도서관의 저작권문제는 비디지털자료를 디지털화하는 정보의 생산의 과정에서 발생하는 문제와, 디지털 데이터를 이용하는 과정에서 발생하는 문제로 나눌 수 있다. 본 연구에서는 LC의 전자저작권관리시스템을 위해 수행되고 있는 CORDS(Copyright Office Electronic Registration, Recordation & Deposit System) 프로젝트를 토대로 후자의 문제를 해결하기 위한 전자저작권관리의 개념과 구성요소에 대해 논하고자 한다.

  • PDF

Design and Implementation of SMART (Software Management Assistant and Reference Tool) (SMART (Software Management Assist ant and Reference Tool) 시스템의 설계 및 구현)

  • Jin, Ki-Sung;Won, Jong-Ho;Kim, June;Kim, Myung-Joon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.04b
    • /
    • pp.367-369
    • /
    • 2002
  • 소프트웨어 프로젝트의 경쟁력 프로젝트의 생명 주기 전반에 걸친 체계적인 관리를 통하여 유지될 수 있으며, 이러한 체계적인 관리는 경쟁력 있는 프로젝트의 개발 및 유지를 위한 하나의 전략적 기술(strategic technology)이다 본 논문에서는 프로젝트 생명 주기 전반에 걸쳐 프로젝트를 체계적이고 효율적으로 관리하여 고품질의 결과물을 생성하고, 이를 통한 결과물의 기술 및 시장 경쟁력을 높이기 위하여 당 연구부에서 개발하여 사용하고 있는 프로젝트 관리 및 지원도구인 SMART (Software Management Assistant and Reference Tool) 시스템을 소개한다.

  • PDF

Feasibility Analysis Information Model for Road Construction Projects (도로 프로젝트의 타당성분석 정보모델 구축방안)

  • Yang Jin-Kook;Kim Soo-Yong;An Dong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-384
    • /
    • 2002
  • A road construction project needs a large scale of investment and tine. In this study, we will review some elements of feasibility analysis and derive points of the existing analyses. And we make some suggestions to improve the existing methods. We propose a 'A Feasibility Information System' for road construction projects. The system will be useful to make a feasibility study for road construction project and help us to predict risks in process of the projects.

  • PDF

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

Research of Earned Schedule Method to forecast progressed schedule of IT Project (IT 프로젝트 수행 시 추진 일정 예측을 위한 Earned Schedule Method 활용에 관한 연구)

  • Eom, Seung-Wook;Lee, Seouk-Joo;Kang, Jae-Woo
    • Annual Conference of KIPS
    • /
    • 2011.04a
    • /
    • pp.1352-1355
    • /
    • 2011
  • Earned value management(EVM)는 프로젝트 진행 상태를 파악하기 위해 주로 비용과 일정 편차, 성과지표를 통합하여 분석하는 것으로 비용/원가 관리를 위해 발전되어 사용되어 왔다. 그러나 최근에는 경영환경 변화에 따라 불확실성이 증가하여 프로젝트 전체 일정의 예측에 대한 성과지표로 사용되고 있다. 본 연구에서, 비용관점에서 분석된 earned value management의 성과 지표와 시간관점에서 분석된 earned schedule의 성과 지표를 비교하여 차이점을 도출하고 비용관점에서의 지표가 프로젝트 전체 일정을 예측하는 것에서는 신뢰성이 떨어지는 현상을 발견하였다. 향후 본 연구를 통해 프로젝트 비용관리와 더불어 earned schedule의 성과 지표를 이용한 일정 예측을 통해 성공적인 프로젝트 수행에 도움이 되도록 하고자 한다.

The Present Condition of Risk Management for Software Development Project in Korea. (한국의 소프트웨어 개발 프로젝트 위험 관리 현황)

  • 류나정;고석하
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 2003.11a
    • /
    • pp.489-503
    • /
    • 2003
  • 잘못되거나 불확실한 결과가 예상되는 프로젝트를 계속 지속하는 행위는 어떠한 분야의 프로젝트에서도 발견 할 수 있는 보편적인 현상이다. 그러나 소프트웨어 개발 분야는 그러한 어떠한 분야보다도 이 문제에 더 민감하며 그 파급효과 또한 크다. 그 이유는 소프트웨어 그 자체가 형태를 가지고 있지 않아 프로젝트 진행 도중에는 그 완성도를 예측하기가 무척 어렵기 때문이다. 또한 소프트웨어는 프로젝트범위가 자주 변동되기 때문에 통제와 관리에 어려움이 많다. 이런 이유로 소프트웨어 개발 생명주기의 각 단계에서 발생하는 위험 요소들을 찾아 그 위험 요소들이 발생했을 때 프로젝트에 미치는 영향정도 파악하여 그 해당위험 요소에 대응하는 방안들을 모색하는 것이 피해를 줄이기 위해 가장 최선의 방법이다. 본 논문에서는 위에서 거론된 소프트웨어 위험 관리에 대한 관련 문헌을 조사, 검토하고 설문을 통해 조사한 실무자들의 경험을 바탕으로 위험에 대한 인식과 대응 반응을 파악하고 연구하고자 한다. 소프트웨어 프로젝트 계획 단계에서 위험 요소가 추후 발생할 것을 예측하여 실제로 위험 요소가 발현했을 때, 적극적으로 대처 할 수 있는 방법을 찾아 해당 위험이 주는 영향을 최소화 할 수 있는 방법을 찾고자 한다.

  • PDF

Management of ASP Outsourcing Project Risks using Real Option Approach (실물옵션 접근법을 활용한 ASP 아웃소싱 리스크 관리)

  • Nam, Seung-Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.7
    • /
    • pp.2396-2405
    • /
    • 2010
  • Information System (IS) Outsourcing is one of the powerful alternatives to guarantee the competitive advantages in the rapidly changing business environment. Most studies on IS outsourcing area have focused on the Critical Success Factors(CSFs) influencing the Success of IS outsourcing or the performance measuring the success of IS outsourcing projects. The CSFs or the performances which measures the success of IS outsourcing project have limitations to explain how to succeed in doing IS outsourcing project. This study uses Real Options Approach to make IS outsourcing projects' success by recognizing and minimizing IS outsourcing risks.