• Title/Summary/Keyword: 프로젝트 일정관리

Search Result 194, Processing Time 0.051 seconds

A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming (몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법)

  • Kim Yong-Deuk;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.210-215
    • /
    • 2004
  • In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.

  • PDF

A Study of Process Milestone for the Analysis of Risk Items (위험대상요소 분석을 위한 프로세스 마일스톤에 관한 연구)

  • Lee, Eun-Ser
    • The KIPS Transactions:PartD
    • /
    • v.16D no.1
    • /
    • pp.105-112
    • /
    • 2009
  • Risk management is increasingly seen as one of the main jobs of project managers. It involves anticipating risks that might affect the project schedule or the quality of the software being developed and taking action to avoid these risks. The results of the risk analysis should be documented in the project plan along with an analysis of the consequences of a risk occurring. Effective risk management makes it easier to cope with problems and to ensure that these do not lead to unacceptable budget or schedule slippage. This research provides criteria of analysis of risk items to the estimation of process milestone on software development. Also, In this paper propose to a fixed quantity and transition phase.

Development Term Index for effective ITIL Change Management (효율적인 ITIL 변경관리 프로세스를 위한 개발기간 지표)

  • Ma, Soo-Jung;Kim, Jin-Hyung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2006.11a
    • /
    • pp.499-502
    • /
    • 2006
  • 기업의 IT 환경이 시스템 중심에서 비즈니스 중심으로 바뀌어감에 따라 IT 서비스 관리 프로세스 구축에 대한 가이드를 제공하는 Information Technology Infrastructure Library(ITIL) 모델이 나왔다. ITIL 적용이 가장 큰 목적은 IT 업무 프로세스 개선을 통한 서비스 품질 개선과 서비스 비용 절감이다. 변경관리 IT 환경의 모든 사고 및 변경에 관해 효율적이고 신속한 처리를 위한 표준화된 방법과 절차를 사용하는 ITIL 의 Service Support 의 한 영역이다. 그러나 기존 모델에는 우선순위, 업무범위등 처리절차에 대해 선진사례가 나와있는 반면 일정에 대한 신뢰성이 없다는 문제점이 있다. 따라서 본 논문에서 프로젝트 관리에서의 일정관리 개념을 도입하고 Goal Question Metrics(GQM) 기법을 사용하여 일정관리의 신뢰성을 부여할 수 있는 개발기간 지표를 제안한다. 또한 이러한 지표의 타당성 검증을 위해 S 사의 데이터를 비교 분석한다. 결과적으로 제안하는 지표를 통하여 조직운영의 효율성과 비즈니스에 초점을 맞춘 IT 서비스를 제공할 수 있다.

  • PDF

Methods of Establishing the Optimal Performance Measurement Baseline and Evaluating the Progress for Implementing EVMS (EVMS 적용을 위한 최적 성과측정기준선 설정 및 진도율 산정 방법)

  • Won Dong-Soo;Kim WooYoung;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.395-400
    • /
    • 2001
  • In construction projects, it is very important to evaluate the performance of works in comparison with the cost and schedule plans. So, on the first of July, 2000, the Ministry of Construction and Transportation announced the EVMS will be applied in public sector soon. However there are still many arguments about how to establish the Performance Measurement Baseline(PMB) and how to evaluate the progress with accuracy. And many people confuse the meaning of EVMS with that of cost and schedule management. So, the purpose of this research is to propose the new useful methods to set up the PMB and to assess the exact progress in consideration of cost, schedule, and float time for successful implementation of EVMS.

  • PDF

The Development of a Schedule Management Support System Using Productivity Information of Construction Activities (단위작업 생산성 정보를 활용한 공정관리 지원시스템 개발)

  • Oh, Se-Wook;Park, Sang-Gyu;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.181-192
    • /
    • 2005
  • Labor work information can be converted into the useful construction information in an effort to analyze project status, measure performance, and design a new similar project plan. The labor work information can also be used to make productivity data, which can be used to analyze the relationship between 'as planned' and 'as built' in scheduling management of a project, and to calculate 'percent completion' as well as analyzing delay cause. It is require to effectively collect the labor work information base on the activities. In general, current project management heavily depends on the experience and judgment of project managers, according to the work progress. However, relying on the oかy experience and judgment of the project managers might deteriorate the transparency or reliability of the collected labor work information. The purpose of this research is thus to develop a computer-based system for monitoring the work information generated by labors input in activities using PDA and Barcode technologies, and to propose a application method of the productivity data for effective project management.

A Case Study on Risk Analysis of Large Construction Projects (대형건설공사의 리스크 분석에 관한 사례적용연구)

  • Kang In-Seok;Kim Chang-Hak;Son Chang-Baek;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.98-108
    • /
    • 2001
  • This research proposes a new risk analysis model in order to guarantee successful performance of construction projects. The risk analysis model, called Construction Risk Analysis System(CRAS), is introduced to help contractors Identify project risks through RBS and through the procedures in risk analysis model. The proposed CRAS model consists of three phases. First step, CRAS model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

  • PDF

지역 거점 대학과 중소 SI 업체와의 산학 협동 : Web CMS 개선 사례

  • Kim, Jong-Cheol;Kim, Yeong-Il;Lee, Hyeon-U;Jang, Rae-Hyeon;Go, Seok-Ha
    • Proceedings of the Korea Society of Information Technology Applications Conference
    • /
    • 2006.06a
    • /
    • pp.208-231
    • /
    • 2006
  • JSP 모델 1로 개발된 웹 어플리케이션의 문제점은 HTML과 자바 코드가 같은 파일로 결합되어 유지관리에 어려움을 준다. HTML과 자바가 같은 파일로 결합될 때, HTML과 애플리케이션의 논리적인 측면 모두가 복잡해지기 때문에 여러 사람이 이들 파일에 대해 책임을 갖게 되는 것이 불가피해지는 문제점이 발생한다. 반면, JSP 모델 2(MVC 모델)는 객체지향 방법론의 구현으로 구현과 모델, 뷰를 분리함으로써 위의 문제점을 해소한다. 우리가 개선할 Web CMS도 JSP 모델 1로 개발된 웹 어플리케이션으로 JSP가 가지고 있는 문제점을 가지고 있었다. 이런 문제점을 개선하기 위해 기업에서 대학측에 Web CMS 개선 프로젝트를 제안하였다. 프로젝트에 적용한 기술들은 객체지향 모델링 언어인 UML을 기반으로 설계를 하고, 일정관리 도구인 MS-Project에 의해 일정관리를 하였다. 개발 프로그래밍 언어는 웹 어플리케이션 아키텍처인 자바 스트러츠로 개발하였다. 이에 본 논문은 새로운 기술인 객체지향 방법론을 적용하기 원하는 중소 SI 기업과 지역 거점 대학과의 산학협동 사례를 제시한다. 지방 중소 SI 기업과 그 기업에서 개발한 Web CMS를 지역 거점 대학과의 산학 협동을 통해 신기술로 개선한 과정과 방법, 결과에 대해 말하고자 한다. 또한, 기업과의 산학협동을 통해 얻은 교훈을 통해 대학과 기업이 서로 상생할 수 있는 방법에 대해 고찰해 보고한다.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

The Study on Correlation Between Factors Decreasing Construction Productivity and Waste Factors with Relation to Lean Construction (린 건설과 연계한 생산성 저하 요인과 Waste 요인과의 상호 관련성 연구)

  • Park Joo-Hyun;Kim Dae-Young;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.164-172
    • /
    • 2003
  • 생산성은 프로젝트를 관리하는데 있어서 효율성을 측정하는 중요한 지표이다 또한 건설 생산성은 비용 및 일정과 연관성이 있을 뿐만 아니라 프로젝트의 성공 여부와도 관련이 크다. 프로젝트에서 생산성의 중요성에도 불구하고 국내에서의 생산성 관련 연구는 생산성에 대한 기본 개념 및 원칙에 관한 기초적인 연구 없이 정량적인 연구에 집중되어 있으며, 관련 데이터 수도 적은 실정이다. 국내 건설 공사의 생산성을 향상시키기 위해서는 생산성 관리의 정량적친 요인뿐만 아니라, 정성적인 요인까지 관리해야 하며, 저하요인에 따른 체계적이고 세부적인 프로세스 및 기법이 제시되어야 한다 이에 국내 건설 공사의 생산성 관리에 린 건설을 도입하고자 한다. 본 연구에서는 국내 생산성 저하요인과 린 건설에서의 Waste 요인과의 상관관계 분석을 통해 국내 건설 공사 현장에서의 Waste 주요 의미를 살펴보고 두 요인간의 상호 관련성을 파악하여, 린 건설의 프로세스 및 기법을 국내 건설 공사 현장에 적용하기 위한 이론적인 근거를 제공하고자 한다.

Design and Implementation of Web-based Information Reporting System for Group Project Management (그룹프로젝트관리 지원을 위한 웹기반 정보보고시스템의 설계 및 구현)

  • Kim, Myong-Ok;Park, Eun-Byul
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.4
    • /
    • pp.245-263
    • /
    • 2010
  • Today, large enterprises are changing their team organization to group organization. These trends have brought work flexibility of project and manpower usage. However, communication among group members has become more complicated, and it has been found that ERP was not efficient enough to solve this communication problem. The main purpose of this study was to design a quick and systematic communication system for group project management, and Web-based Information Reporting System (hence forth WIRS) has been proposed. The main topics covered in this paper are design of functions and system architecture, process model design, database design, and implementation of the prototype. Focus group interview was conducted and user feedback was positive about main functions for WIRS and its overall impact on the enhancement of productivity.