• Title/Summary/Keyword: 프로젝트 성공요인

Search Result 216, Processing Time 0.027 seconds

Barriers to Success of Project Management (프로젝트 관리의 성공에 영향을 미치는 장애요인)

  • Lee, A-yeon;Moon, Kyung-mi;Kim, Seung-chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.179-190
    • /
    • 2020
  • As the business environment is rapidly changing with globalization and complexity of information flows, the uncertainty is also very increased for project environment. Although many studies have been conducted to find out the critical factors for project success, there still exist different views to define project success. Furthermore, implementing success formula for one project does not necessarily guarantee a success for another project since there are other elements that impede the success of project. In this regards, it is imperative to examine what are the barriers to project success. This study aims to examine the barriers that impede the success of project. Past literature was thoroughly reviewed to collect and develop a preliminary list of elements that affected project performance negatively. Experts were interviewed to refine the list and the final list of the measurement items were developed. A survey questionnaire was developed with the final list of measurement items, and a survey was conducted on the practitioners with project experience. After the survey, an exploratory factor analysis was conducted on the final list to extract the component dimensions which in turn formed the group of project barriers. The exploratory factor analysis provided ten factors, which are difficulty of process management, failure of project feasibility analysis, cost overruns and lack of cost benefits, unclarity project plan, strategic consistency error, stakeholder conflict, inaccuracy of requirement definition, disturbance of communication, technical environment change, negative attitude of top management.

Development of Change Management System for Urban Development Project (신도시 건설사업의 변화관리시스템 구축에 관한 연구)

  • Cho, Jinyoung;Jang, Ounsung;Yu, Junhyuk;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.79-86
    • /
    • 2014
  • Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.

An Automated and Intelligent Process for Construction Supply Chain Management Utilizing Ubiquitous Technologies (USN 기술을 활용한 지능형 건설물류관리 프로세스)

  • Lee, Woo-Jae;Lee, Nam-Su;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.756-761
    • /
    • 2007
  • The construction Supply Chain Management(SCM) plays a critical role to proceed construction projects successfully. It is necessary to develop a system to support better communication among various actors and to supply construction materials in the right place on time with unstable situations on site according to the planned construction schedule for effective Supply Chain Management. Therefore, the objective of this study is to propose an automated and intelligent process that can be used to utilize ubiquitous technologies in construction supply chain management. This process consists of various equipments that can collect, store, calculate and communicate data among themselves. This study deals with a conceptual idea in order to improve process and equipment in the supply chain management process.

  • PDF

Developing Country Firm's Technological Innovation in the Technology Generation Stage: Process Technology Development Case Study (개발도상국기업의 기술창출단계 기술혁신: 프로세스 기술개발 사례연구)

  • Chung, Ki-Dae
    • Journal of Korea Technology Innovation Society
    • /
    • v.12 no.1
    • /
    • pp.237-264
    • /
    • 2009
  • Many Korean companies wanted to improve technological competitiveness and business performance radically through technology leadership initiatives. In-depth case studies about successful Korean technological innovation in the technology generation stage have potential to minimize Korea and developing country firms' trial and error when they are pursuing new technological innovation in the technology generation stage. There are few studies about developing country firms' technological innovations in the technology generation stage and especially process innovation studies are far less performed compared to product innovation studies. This is an exploratory study of POSCO's FINEX process technology innovation in the technology generation stage. These are my findings from this study. Firstly, leadership innovation in the technology generation stage is not a continuous development of catch-up innovation in the technology internalization stage and only top managements can initiate highly risky leadership innovation. Secondly, developing country firms which lacked in technological capability overcomes difficulties in the early stage through complementary technological collaboration with R&D first-movers. Thirdly, this company become a technology leader in spite of late entry in technology development race with developed country firms through rapid scale-ups.

  • PDF

Feasibility Study for Technology and Policy on Water Footprint Introduction (물발자국 도입의 기술적·정책적 타당성 분석연구)

  • Park, Sung Je;Park, Nu Ree;Ryu, Si Saeng
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.265-265
    • /
    • 2015
  • 기후변화에 대비하여 한정된 수자원을 효율적으로 사용하기 위한 제도적 규제는 앞으로 기업의 제품 생산에서 발생하는 오염까지 확대될 전망이다. 기관투자가 등이 지원하는 영국의 NPO인 탄소정보공개프로젝트(CDP)는 2010년부터 온실가스배출량과 함께 물 사용 상황을 공개할 것을 전 세계 기업에 요구했다. 이에 따라 전 세계에서 탄소발자국과 물발자국에 대한 연구가 활발하게 진행 중에 있다. 우선 본 연구는 선진국을 중심으로 진행되고 있는 물발자국 개념의 활용현황을 분석하였다. 호주와 미국을 비롯한 일부 국가에서는 물발자국의 라벨 제도를 도입하여 기업의 제품에 대한 등급을 구분하고 있다. 라벨의 부착은 인증기관의 검토를 통하여 기존 제품보다 물 사용 효율이 높다는 것을 의미하며, 물발자국 라벨제도는 제품 생산의 전 과정 환경성 평가를 통하여 기업이나 제품의 물발자국 관련 영향을 줄이는 것을 목표로 하고 있다. 또한 스페인에서는 물발자국을 물의 효율적인 분배와 사용을 위한 정책적 요소로 도입하였다. 이상의 분석을 바탕으로 물발자국의 기술적 활용 및 효과를 도출하기 위하여 법과 제도적 측면, 기술적 측면에서 살펴보았으며, 우리나라의 현황과 비교를 진행하였다. 이와 관련하여 분야별 기술 사업에 대한 목표와 최종성과물, 활용방안을 정리하여 해당 개념의 주요쟁점사항에 대해 기술적, 정책적으로 타당한지를 지표를 설정하여 분석하였다. 물발자국의 활용에서 기술적 타당성에 대한 지표는 적절성, 성공가능성, 우수성, 경제성 측면에서 제시가 되었으며, 정책적 타당성은 해당계획 및 기업 및 지자체의 추진의지, 위험요인, 특수평가 항목을 통해 개업 및 지자체의 물발자국 활용 타당성을 분석하였다. 이상을 바탕으로 본 연구에서는, 물발자국 도입을 위한 종합평가로서 AHP 분석을 실시하여 물발자국 도입을 위한 중요도와 종합목적 및 위기상황에 따른 대체안을 설정할 수 있도록 우선순위를 도출하였다. 현재 우리나라는 본격적인 정책적 도입에 앞서 개념의 정의, 정책 공감대의 확대, 한국형 데이터베이스를 구축하는 시범단계에 있다. 물 산업의 확대와 우리 기업들의 해외진출은 가상수와 물발자국의 데이터베이스의 구축이 시급하다는 것을 보여준다. 따라서 본 연구는 앞으로 우리나라의 물발자국 도입을 위한 방향을 설정할 수 있는 기초연구로서 큰 의미를 지니며, 기업의 물산업 전략을 수립을 위한 지표 설정에 있어서도 기초자료를 제공할 수 있을 것으로 기대된다.

  • PDF

Analyzing the Influence Relationship between Barriers to Success of Project Management Using DEMATEL Method (DEMATEL 기법을 활용한 프로젝트 관리 성공을 저해하는 장애요인 간의 영향 관계 분석)

  • Lee, A-Yeon;Chang, Mi-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.214-229
    • /
    • 2021
  • There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.

A Case Study of the Risk Identification in Construction Project (건설사업의 리스크 식별에 관한 사례연구)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.15-23
    • /
    • 2015
  • In the construction industry, risk management has gained constant attention as the factor not only to evaluate global competitiveness of the country but also to secure competitiveness of public institutions and private companies. For effective construction risk management, the specific work process improvement that can be employed in the field in terms of risk management of the entire corporation such as financial, insurance and safety management is necessary. To manage construction risks, what is important is the step to identifying inherent risks in the construction project. The identification of risks will be followed by the step to seeking ways to establish and manage strategies responding to the risks. This study suggests ways and processes to make a checkslit to identify risks through case studies. To that end, the focus will be placed on working process improvement of risk identification among stages to manage construction risks such as risk identification and analyses, planning to respond to risks, risk monitoring and management. The case study checklists show that setting up the system to classify risks by stage is helpful to figure out causes of risks to reduce or eliminate risk factors. The checklist making process that considers features of the project is expected to contribute to successful completion of the project by enabling effective risk identification and systematic risk management.

Causal Loop Diagram for the Relation Between Degree of Field Safety Management and Productivity Based on Effectiveness Metrics : Focusing on Plumbing work in Mega Project (작업효율 지표 기반 안전관리행위 - 생산성 인과 모델 구축 - 메가 프로젝트 배관공사 중심으로 -)

  • Chae, Yeon;Park, Moonseo;Cho, Jongwoo;Lee, Jinsol;Joo, Seonu;Hong, Yeongmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.12-20
    • /
    • 2021
  • Unsafe working environments slow down working speed in that it takes a lot of time to respond in case of an accident, greatly reducing the productivity of construction work. Therefore, proper safety management that does not impede the productivity of construction works is a very important factor for successful construction project. However especially in mega project, the mutual effects of safety management and productivity are complex. Therefore, this study establishes a causal model between safety management and productivity influencing factors based on effectiveness metrics, and analyzes the effect of increased site congestion due to excessive personnel input, irregular safety measures and inefficient change of work schedules. The result of this study, is expected to contribute to enhancing the competitiveness of the construction industry as the basis for establishing a safety management plan that can secure appropriate productivity.

An Exploratory Study on Start-up Opportunity Sources Analysis and Opportunity Search of Korean Young Entrepreneurs -Focused on a participants of Seoul "Young Entrepreneurs 1000 Project"- (청년창업가의 창업기회원천 분석 및 기회탐색에 관한 탐색적 연구 -서울시 "청년창업 1000프로젝트" 참가자를 중심으로-)

  • Moon, Soo-Young;HwangBo, Yun
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.6 no.4
    • /
    • pp.39-57
    • /
    • 2011
  • In this study, entrepreneurship opportunities, get in anywhere, in any situation, whether in respect to entrepreneurship through empirical research is to analyze. In addition, young entrepreneurs and entrepreneurship opportunities to target the source and a realistic opportunity to investigate the nature of the search in terms of effective support for young entrepreneurs and operational plans to seek the help. Entrepreneurship opportunities of the origins of the existing studies individually being taken were young entrepreneurs and selected for this study the national and international literature base, and objectives of the study to achieve the city "Young Entrepreneurs 1000 Project" participants, survey through the empirical foundation of their opportunities and entrepreneurship opportunities origins analyzed the relationship between sources. Source of entrepreneurship opportunities in the establishment will include the nature of existing research (intentional / unintentional), business opportunities generated background (source), business opportunity lead, business opportunity lead contact situation (the nature of chance encounters), the business idea was dealt with using here, a new source of opportunity factor established by adding the capital adequacy ratio of capital has been studied. Also 10 years ago by byeong-ju, Jo. entrepreneurship opportunities in Korea for the first time research on the relationship between the source after source of opportunities than in previous research literature on factors leading to the establishment an opportunity to add a set of relationships between sources were analyzed.

  • PDF

A Study on the Derivation and Sensitivity Analysis of the Adjustment Factor in the Software Cost Estimation Guidelines (소프트웨어 사업대가기준 보정계수의 유도 및 민감도 분석)

  • Byun, Boon-Hee;Kwon, Ki-Tae
    • The KIPS Transactions:PartD
    • /
    • v.15D no.1
    • /
    • pp.61-72
    • /
    • 2008
  • One of the most significant tasks of software development project is to know how much it will be the software development cost in the early stage of software development cycle. The software development environment and technology are changing very rapidly. For accuracy, we should apply those to the software cost estimation. And it is important that we select the suitable adjustment factor and the value of a suitable adjustment factor. For that, this paper have applied the method of AHP. And we have also analyzed the sensitivity of the adjustment factor which is influenced by decision metrics. In conclusion, the value of the application type adjustment factor is responded more sensitively to the data complexity and the control complexity than processing complexity. And the value of the language adjustment factor is responded more sensitively to the supplying manpower and the time of the coding than the time of the debugging. In the future, we will research the selection of an additional adjustment factor and a suitable value of the adjustment factor which are influenced by the environment and the technology of the domestic software development. And then, in the language adjustment factor, we will try to calculate the value about the individual programming language.