Journal of Korean Society of Industrial and Systems Engineering
/
v.43
no.3
/
pp.179-190
/
2020
As the business environment is rapidly changing with globalization and complexity of information flows, the uncertainty is also very increased for project environment. Although many studies have been conducted to find out the critical factors for project success, there still exist different views to define project success. Furthermore, implementing success formula for one project does not necessarily guarantee a success for another project since there are other elements that impede the success of project. In this regards, it is imperative to examine what are the barriers to project success. This study aims to examine the barriers that impede the success of project. Past literature was thoroughly reviewed to collect and develop a preliminary list of elements that affected project performance negatively. Experts were interviewed to refine the list and the final list of the measurement items were developed. A survey questionnaire was developed with the final list of measurement items, and a survey was conducted on the practitioners with project experience. After the survey, an exploratory factor analysis was conducted on the final list to extract the component dimensions which in turn formed the group of project barriers. The exploratory factor analysis provided ten factors, which are difficulty of process management, failure of project feasibility analysis, cost overruns and lack of cost benefits, unclarity project plan, strategic consistency error, stakeholder conflict, inaccuracy of requirement definition, disturbance of communication, technical environment change, negative attitude of top management.
Korean Journal of Construction Engineering and Management
/
v.15
no.2
/
pp.79-86
/
2014
Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.756-761
/
2007
The construction Supply Chain Management(SCM) plays a critical role to proceed construction projects successfully. It is necessary to develop a system to support better communication among various actors and to supply construction materials in the right place on time with unstable situations on site according to the planned construction schedule for effective Supply Chain Management. Therefore, the objective of this study is to propose an automated and intelligent process that can be used to utilize ubiquitous technologies in construction supply chain management. This process consists of various equipments that can collect, store, calculate and communicate data among themselves. This study deals with a conceptual idea in order to improve process and equipment in the supply chain management process.
Many Korean companies wanted to improve technological competitiveness and business performance radically through technology leadership initiatives. In-depth case studies about successful Korean technological innovation in the technology generation stage have potential to minimize Korea and developing country firms' trial and error when they are pursuing new technological innovation in the technology generation stage. There are few studies about developing country firms' technological innovations in the technology generation stage and especially process innovation studies are far less performed compared to product innovation studies. This is an exploratory study of POSCO's FINEX process technology innovation in the technology generation stage. These are my findings from this study. Firstly, leadership innovation in the technology generation stage is not a continuous development of catch-up innovation in the technology internalization stage and only top managements can initiate highly risky leadership innovation. Secondly, developing country firms which lacked in technological capability overcomes difficulties in the early stage through complementary technological collaboration with R&D first-movers. Thirdly, this company become a technology leader in spite of late entry in technology development race with developed country firms through rapid scale-ups.
Proceedings of the Korea Water Resources Association Conference
/
2015.05a
/
pp.265-265
/
2015
기후변화에 대비하여 한정된 수자원을 효율적으로 사용하기 위한 제도적 규제는 앞으로 기업의 제품 생산에서 발생하는 오염까지 확대될 전망이다. 기관투자가 등이 지원하는 영국의 NPO인 탄소정보공개프로젝트(CDP)는 2010년부터 온실가스배출량과 함께 물 사용 상황을 공개할 것을 전 세계 기업에 요구했다. 이에 따라 전 세계에서 탄소발자국과 물발자국에 대한 연구가 활발하게 진행 중에 있다. 우선 본 연구는 선진국을 중심으로 진행되고 있는 물발자국 개념의 활용현황을 분석하였다. 호주와 미국을 비롯한 일부 국가에서는 물발자국의 라벨 제도를 도입하여 기업의 제품에 대한 등급을 구분하고 있다. 라벨의 부착은 인증기관의 검토를 통하여 기존 제품보다 물 사용 효율이 높다는 것을 의미하며, 물발자국 라벨제도는 제품 생산의 전 과정 환경성 평가를 통하여 기업이나 제품의 물발자국 관련 영향을 줄이는 것을 목표로 하고 있다. 또한 스페인에서는 물발자국을 물의 효율적인 분배와 사용을 위한 정책적 요소로 도입하였다. 이상의 분석을 바탕으로 물발자국의 기술적 활용 및 효과를 도출하기 위하여 법과 제도적 측면, 기술적 측면에서 살펴보았으며, 우리나라의 현황과 비교를 진행하였다. 이와 관련하여 분야별 기술 사업에 대한 목표와 최종성과물, 활용방안을 정리하여 해당 개념의 주요쟁점사항에 대해 기술적, 정책적으로 타당한지를 지표를 설정하여 분석하였다. 물발자국의 활용에서 기술적 타당성에 대한 지표는 적절성, 성공가능성, 우수성, 경제성 측면에서 제시가 되었으며, 정책적 타당성은 해당계획 및 기업 및 지자체의 추진의지, 위험요인, 특수평가 항목을 통해 개업 및 지자체의 물발자국 활용 타당성을 분석하였다. 이상을 바탕으로 본 연구에서는, 물발자국 도입을 위한 종합평가로서 AHP 분석을 실시하여 물발자국 도입을 위한 중요도와 종합목적 및 위기상황에 따른 대체안을 설정할 수 있도록 우선순위를 도출하였다. 현재 우리나라는 본격적인 정책적 도입에 앞서 개념의 정의, 정책 공감대의 확대, 한국형 데이터베이스를 구축하는 시범단계에 있다. 물 산업의 확대와 우리 기업들의 해외진출은 가상수와 물발자국의 데이터베이스의 구축이 시급하다는 것을 보여준다. 따라서 본 연구는 앞으로 우리나라의 물발자국 도입을 위한 방향을 설정할 수 있는 기초연구로서 큰 의미를 지니며, 기업의 물산업 전략을 수립을 위한 지표 설정에 있어서도 기초자료를 제공할 수 있을 것으로 기대된다.
Journal of Korean Society of Industrial and Systems Engineering
/
v.44
no.3
/
pp.214-229
/
2021
There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.
Korean Journal of Construction Engineering and Management
/
v.16
no.1
/
pp.15-23
/
2015
In the construction industry, risk management has gained constant attention as the factor not only to evaluate global competitiveness of the country but also to secure competitiveness of public institutions and private companies. For effective construction risk management, the specific work process improvement that can be employed in the field in terms of risk management of the entire corporation such as financial, insurance and safety management is necessary. To manage construction risks, what is important is the step to identifying inherent risks in the construction project. The identification of risks will be followed by the step to seeking ways to establish and manage strategies responding to the risks. This study suggests ways and processes to make a checkslit to identify risks through case studies. To that end, the focus will be placed on working process improvement of risk identification among stages to manage construction risks such as risk identification and analyses, planning to respond to risks, risk monitoring and management. The case study checklists show that setting up the system to classify risks by stage is helpful to figure out causes of risks to reduce or eliminate risk factors. The checklist making process that considers features of the project is expected to contribute to successful completion of the project by enabling effective risk identification and systematic risk management.
Korean Journal of Construction Engineering and Management
/
v.22
no.2
/
pp.12-20
/
2021
Unsafe working environments slow down working speed in that it takes a lot of time to respond in case of an accident, greatly reducing the productivity of construction work. Therefore, proper safety management that does not impede the productivity of construction works is a very important factor for successful construction project. However especially in mega project, the mutual effects of safety management and productivity are complex. Therefore, this study establishes a causal model between safety management and productivity influencing factors based on effectiveness metrics, and analyzes the effect of increased site congestion due to excessive personnel input, irregular safety measures and inefficient change of work schedules. The result of this study, is expected to contribute to enhancing the competitiveness of the construction industry as the basis for establishing a safety management plan that can secure appropriate productivity.
Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.6
no.4
/
pp.39-57
/
2011
In this study, entrepreneurship opportunities, get in anywhere, in any situation, whether in respect to entrepreneurship through empirical research is to analyze. In addition, young entrepreneurs and entrepreneurship opportunities to target the source and a realistic opportunity to investigate the nature of the search in terms of effective support for young entrepreneurs and operational plans to seek the help. Entrepreneurship opportunities of the origins of the existing studies individually being taken were young entrepreneurs and selected for this study the national and international literature base, and objectives of the study to achieve the city "Young Entrepreneurs 1000 Project" participants, survey through the empirical foundation of their opportunities and entrepreneurship opportunities origins analyzed the relationship between sources. Source of entrepreneurship opportunities in the establishment will include the nature of existing research (intentional / unintentional), business opportunities generated background (source), business opportunity lead, business opportunity lead contact situation (the nature of chance encounters), the business idea was dealt with using here, a new source of opportunity factor established by adding the capital adequacy ratio of capital has been studied. Also 10 years ago by byeong-ju, Jo. entrepreneurship opportunities in Korea for the first time research on the relationship between the source after source of opportunities than in previous research literature on factors leading to the establishment an opportunity to add a set of relationships between sources were analyzed.
One of the most significant tasks of software development project is to know how much it will be the software development cost in the early stage of software development cycle. The software development environment and technology are changing very rapidly. For accuracy, we should apply those to the software cost estimation. And it is important that we select the suitable adjustment factor and the value of a suitable adjustment factor. For that, this paper have applied the method of AHP. And we have also analyzed the sensitivity of the adjustment factor which is influenced by decision metrics. In conclusion, the value of the application type adjustment factor is responded more sensitively to the data complexity and the control complexity than processing complexity. And the value of the language adjustment factor is responded more sensitively to the supplying manpower and the time of the coding than the time of the debugging. In the future, we will research the selection of an additional adjustment factor and a suitable value of the adjustment factor which are influenced by the environment and the technology of the domestic software development. And then, in the language adjustment factor, we will try to calculate the value about the individual programming language.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.