• Title/Summary/Keyword: 프로젝트 단계별

Search Result 315, Processing Time 0.027 seconds

Selection Method of Alternatives for Considering Correlation between Component Elements in Remodeling Design Process (리모델링 설계단계에서 부위구성요소의 상관관계를 고려한 대안선정 방법)

  • Park Chan-Gil;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.53-61
    • /
    • 2004
  • As remodeling project is progressed in the constraint which is utilization of existing resource, the subject of remodeling and extend of construction are affected by the correlation between building element. Therefore, this research analyze the correlation between component of building element in the design phase and proposed the diagram model for correlation between building element and proposed selection method of alternative plan for optimized combination of building element in remodeling project.

A Study on Electronic Document Delivery Service in Academic Libraries (대학도서관의 전자문헌제공 모형구축에 관한 연구)

  • Lee, Hwa-Yeon
    • Journal of Information Management
    • /
    • v.28 no.1
    • /
    • pp.34-61
    • /
    • 1997
  • This study suggests that the model of electronic document delivery service be carried out by academic libraries step by step, based on the analysis of the domestic and foreign status. The model consists of the user's request step, electronic document building step, electronic document transferring step. Academic libraries should perform the electronic document delivery service step by step that satisfies user's information need.

  • PDF

Study on validating proper System Requirements by using Cost Estimations Methodology (비용추정방법을 활용한 시스템요구사항 적정성 확인방안 연구)

  • Choi, Sung Kyu;Choi, Eun Ha
    • Convergence Security Journal
    • /
    • v.13 no.5
    • /
    • pp.97-105
    • /
    • 2013
  • It is very important the government project should be supported by enough budget for proceeding. The insufficient budget by poor budget estimating uesd to bring about discontinuing for the project. This is originally caused by inaccuracy for cost estimating about system and evaluating for system requirements on the projet initial phase. The system requirements is technical requirements that converted the user needs and is needs for communicating between stakeholder and developer and manufacturer. Also the system requirements is the primary factor to make the project cost. The cost estimating is not easy due to complication of cost factors and an aberration between cost estimating and actual cost. Specially, on the project initial phase, shortage of detail information for project make more difficult to do cost estimating. This study proposes the architecture for validating proper system requirements by using cost estimations methodology on the project initial phase and shows the computer tool for simulating the proposed architecture.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

A Study of Game Project Curriculum for Integrated Subject (통합교과로서의 게임 프로젝트 교육과정 운영방안 탐구)

  • Choi, Seung-Kwan
    • Journal of Korea Game Society
    • /
    • v.16 no.5
    • /
    • pp.111-122
    • /
    • 2016
  • The purpose of this study is to suggest an curriculum model of teaching scheme which performs team project learning based on Integrated project with different fields. To address this goal, the present study suggests a practical game project model under the same game-making circumstances as game industry by consisting of real case of convergence parts(game graphic, game design, game program). This project-based learning case has been conducting Integrated project education since 2008 in A educational Institute in Korea. The results of study suggest a standard of Integrated-based curriculum model and it is constructed with two parts. The first part is what students learned during project processing, such as responsibility, communication. The other part is how to construct the educational environment for integrated project. It explains how to organize and build teams, plan of integrated project, rule the role of team task, perform collaborative task, present interim/final presentation, evaluate grade. This study is expected to be utilized as a framework for the instructional design and the guideline for improving learner competency in team project learning.

Methods to Reduce the Cost of Civil Project by Virtual Construction Technology (가상건설 기법을 이용한 토목분야 원가절감 방안)

  • Kim, Sung-Hoon;Park, Cheon-Jong;Kim, Yong-Han;Shim, Chang-Su
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.89-92
    • /
    • 2010
  • 최근, 가상건설기법 혹은 BIM 도입에 의한 원가절감을 실현하기 위한 노력이 대형 시공사를 중심으로 다양한 분야에 시험 적용되고 있다. 본 연구에서는 가상건설 기법에 의한 토목 프로젝트의 적용사례를 분석하고 그에 따른 원가절감 방안을 분석하여, 향후 적용방향성 및 절차를 제시하고자 한다. 이를 위해 최근에 실제 수행된 토목분야의 가상건설기법 적용 결과를 분석하고 그에 따른 원가측면의 절감효과를 분야별로 평가하였다. 또한 이러한 평가결과를 바탕으로 보다 실질적이고 효과적인 원가절감 결과를 얻기 위해 발주처와 시공사의 단계별 가상건설기법 적용절차를 제시하고자 한다.

  • PDF

A Study on the Case of Quality Innovation with Building Evaluation Method for System Diagnosis (시스템 진단 평가 체계 구축을 통한 품질 혁신 사례 연구)

  • Ryou, In-Ho;Shin, Hyun-Jong;Yun, Kwang-Dong
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2007.05a
    • /
    • pp.431-438
    • /
    • 2007
  • SI 프로젝트에서 품질을 혁신하기 위해서는 시스템 생명 주기 각 단계에서 품질 관리 활동을 강화해야 할 뿐만 아니라 통합된 시스템 관점에서 각 계층(Layer)별, 요소(Component)별 특성을 고려하여 체계적인 시스템 진단 평가 활동을 수행할 필요성이 있다. 시스템 진단 평가 활동은 품질 이슈를 찾아내는 작업과 품질 이슈를 해결하는 작업이 톱니바퀴처럼 맞물려 수행되어야 한다. LG CNS는 프로젝트의 품질 이슈를 적기 진단하기 위해서 시스템 진단 평가 체계를 구축했으며, 프로젝트 현장에서 이를 적용하여 품질 혁신에 기여하고 있다.

  • PDF

Bigdata Analysis Project Development Methodology (빅데이터 분석 프로젝트 수행 방법론)

  • Kim, Hyoungrae;Jeon, Do-hong;Jee, Sunghyun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.19 no.3
    • /
    • pp.73-85
    • /
    • 2014
  • As the importance of big data analysis increases to improve the competitiveness of a corporate, a unified big data project development methodology is required in order to study the problem of a corporate in a systematic way and evaluate the problem w.r.t. a business value after solving the problem. This paper propose Scientific Data Anslysis and Development methodology(SDAD) which are integrated methodology of software development and project management for easier application into a field project. SDAD consisits of 6 stages(problem definition stage, data preparation stage, model design stage, model development stage, result extraction stage, service development state), each stages has detailed processes(47) and productions(93). SDAD, furthermore, unified previous ISP, DW, SW development methodologies in terms of the data analysis and can easily interchange the productions with them. This paper, lastly, introduces a way to assign responsible persons for each process and provide communication procedures in RACI chart to improves the efficiency of the interaction among professionals from different subjects. SDAD is applied to a Bigdata project in Korea Employment Information Services institution and the result turned out to be acceptable when evaluated by the supervision.

Application of Activity-Based Costing(ABC) for Modular Construction Quality Management (활동기준원가계산을 이용한 모듈러 건축 프로젝트의 품질관리방안)

  • Lee, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.485-496
    • /
    • 2022
  • Modular construction projects offer advantageous over conventional construction projects in the area of quality control through factory production. However, as clear standards and definitions for quality control activities have yet to be not established, it is difficult to judge the appropriateness of the scale of quality control costs, and it is also difficult to classify quality control activities by process stage. Therefore, in this study, a method for classifying quality management activities based on activity standards was presented, in addition to a method for classifying quality costs according to the PAF standards to check how effective the costs and activities are for quality control in the future. The findings of this study can be used to define the quality management activities for each stage of the modular construction project in the future, and to develop a database of evidence to determine the appropriateness of cost distribution accordingly.