• Title/Summary/Keyword: 프로젝트 관리체계

Search Result 503, Processing Time 0.021 seconds

A Study on the Consulting Methodology for Building Records Management Scheme for NGOs (NGO 기록관리 컨설팅 방법 연구)

  • Yim, Jin-Hee
    • The Korean Journal of Archival Studies
    • /
    • no.26
    • /
    • pp.3-32
    • /
    • 2010
  • NGO called the third sector is one of the major party of the modern society. Therefore documentation of the various NGOs' activities is the way of recording our society fully. This paper identifies the value of NGOs' records, verifies the needs for NGOs' records management, examines two case of consulting projects on NGOs in Korea which has been conducted by the author and graduate students, and offers a consulting methodology of building records management scheme for the small scale NGOs. The cases are related to small-scale NGOs operated by under 10 full-time activists. One case is related to the NGO based on the locality and the other case is related to the NGO based on the special subject matter. The methodology contains four stages such as defining direction stage, AS-IS analysis stage, TO-BE modelling stage and transition & closing stage. Standard records management guideline for NGOs should be developed using this methodology in the future.

"위험관리 기반 침해사고 조기 대응 체계" 구축 사례

  • Kim, Jin-Seob
    • Review of KIISC
    • /
    • v.20 no.6
    • /
    • pp.73-87
    • /
    • 2010
  • 정신한은행은 '10년 1 월부터 6월까지 약 6개월 동안 "위험관리 기반의 침해사고 조기 대응체계 구축" 프로젝트를 수행하여 침해 시도 조기 탐지 및 대응을 위한 "침해사고 조기 경보 시스템" 및 "침해 사고 대응 프로세스 전산화"와 침해 사고의 사전 예방 강화를 위한 "정보시스템 상시 취약점 점검 체계"를 모두 하나의 프레임웍으로 묶어 통합 구축하였다. 신한은행은 이를 통해 내부망 및 인터넷 서비스망에 대해서 이마 알려진 네트웍 침입 패턴뿐만 아니라 네트웍 트래픽 전반에 대한 모니터링을 대폭 강화하여 기존 침입탐지 시스템이나 디도스 대응 시스템 등에서 탐지가 불가능했던 신종 침입 유형이나 소규모 디도스 공격 트래픽도 자동화된 탐지가 가능하게 되었다. 그리고 탐지된 침입시도의 유행 및 위험 수준에 따라서 사전 정의된 침해사고 대응 프로세스를 통해, 정보보안 담당자가 관련 부서 및 경영진의 요구사항에 각각 최적화된 전용 상황 모니터링 화면을 공유하며 침해사고를 효과적으로 공동 대응할 수 있게 되었다. 또한 정보시스템 전반에 대하여 상시 취약점 점검을 실시하고 그 점검 결과를 데이터베이스로 구축하고 정보시스템의 위험 수준에 따른 체계화된 대응 방안을 수립할 수 있게 되었다. 신한은행은 금번 구축된 시스템을 정보보안 영역 전반으로 확대하여 동일 프레임웍에서 위험관리 기반의 내부 정보 유출 체계를 구축하고, 향후 그룹사에도 확대 적용하여 전체 그룹사의 보안 수준을 제고하는 데 활용할 계획이다. * 금번 구축 사례에서 소개된 침해사고 조기 대응체계는 구축 완료 시점에 사내 명칭 공모를 통해 "Ageis"로 선정되었으며, 본 사례에서도 전체 시스템을 가리킬 때 Ageis로 지칭한다. Aegis는 그라스 신화에서 Zeus 신이 딸 Athena 신에게 주었다는 방패로서 보호, 후원, 지도 등의 뜻을 가지며, 이지스 또는 아이기스 라고 발음된다.

Quality Performance Management System for Construction Projects Using Quality Performance Indicators (품질성과지표 중심의 건설프로젝트 품질성과관리시스템 개발)

  • Lee, Hyun-Soo;Park, Moon-Seo;Song, Sang-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.76-85
    • /
    • 2006
  • Quality is the core competence for customer satisfaction in current competitive business environments. The manufacturing companies regard the quality as the success factor in enhancing competitiveness and foremost concept of the management innovation. But in many cases, the basis for the quality management and the action programs are not prepared yet. In construction industry, normally schedule and cost have priority over quality and the level of overall quality is relatively lower than other industries. This is caused by the vague quality goal and result-oriented management. This study suggests the quality performance indicators for measuring performance objectively, and develops the continuous quality monitoring system based on those indicators. By using this system, the quality improvement can be expected and corporate quality competitiveness can be ensured.

The Deduction of the Success Factor in Construction Projects by Design Build Methods (디자인 빌드(Design Build) 방식 건설 프로젝트의 성공요인 분석에 관한 연구 - 중.소규모 건설 프로젝트를 중심으로)

  • Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.182-190
    • /
    • 2007
  • The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.

Effects of the contingent liabilities caused by project financing on financial status of the Korean construction firms (프로젝트금융으로 인한 우발채무가 건설기업의 재무상태에 미치는 영향)

  • Kang, Namhui;Kim, Hyunjoong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.84-91
    • /
    • 2015
  • Project Financing (PF) is a financing method, executed based upon the projected profitability from a project itself instead of relying on the credit rating of project sponsors or any type of collateral. However, most financial institutions of Korea lacks the long term profitability assessment capability, and they prefer to acquire credit reinforcement from the construction companies in the form of the guarantor or debt argument commitments. As a result, PF contingent liabilities as an indirect debt, are burdened to the construction companies. Even though the PF contingent liabilities are not supposed to be part of the financial statements, they became a mandatory disclosure items since 2009. In this study, PF contingent liabilities were studied to indicate how they were correlated with construction firms' financial ratios. Construction firms were grouped by their credit rating and each group was compared in order to analyze PF contingent liabilities' impact on the financial condition of the company in terms of liquidity, liability, and stability.

Design of Construction Failure Index Quantification System for Risk Management Standardization (리스크 관리 표준화를 위한 건설실패지수 정량화 시스템 설계)

  • Kim, Woong-Bo;Park, Seok-Cheon;Kim, Sung-Chul
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.04a
    • /
    • pp.518-521
    • /
    • 2015
  • 최근 건설 프로젝트의 대형화 및 다양한 신공법들의 도입으로 불확실한 위험도 요인들이 점점 증가함으로써 일련의 시스템적 절차에 따른 리스크 관리(Risk Management) 체계를 수립하여 활용하고 있다. 하지만 국내 시공사와 발주사들은 과거 자신의 경험과 직관에 의존하여 리스크를 다루고 있을 뿐 공사와 관련된 요인을 체계적으로 분류하고 수치화하여 관리하는 곳은 거의 찾아 볼 수가 없는 실정이다. 따라서 본 논문에서는 건설 리스크 관리수준 향상을 위해 건설실패지수를 활용한 기업단위의 정량화 시스템을 설계하고, 이를 표준화하기 위한 정부 연계 시스템 구성에 대해 연구하였다.

An Efficient Idea Creation Method of Design Value Engineering for Construction Projects (건설 프로젝트 설계VE의 효율적인 아이디어 창출 방법)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.55-63
    • /
    • 2006
  • As value engineering in design phase is big in the effect of application, analysis by systematic procedures is required. The most important part is the stage of creation for making of idea. It takes much time for us to make good idea involving the brainstorming and delphi in recent making idea. It is expected because most experts in participating in design value engineering is to approach with less effective method. In this study we suggest that application of ASIT(Advanced Systematic Inventive Thinking) is the method as way of creative idea making. ASIT is expected to perform Idea making with systematic procedure and to create effective idea in short time.

Work Condition Analysis Process for Improving Reliability of Work Plan (작업계획의 신뢰도 향상을 위한 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.36-44
    • /
    • 2009
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of work progress makes higher. Finding each work constraints performs constraints analysis in process of construction for checking probability of work progress. Grasp work constraints through the constraints analysis and removes. This research will show preventing delay of construction project, through work condition analysis process.

Development of CITIS Model and Analysis of Its functionality as a Collaborative Virtual Factory for Construction Projects (건설프로젝트의 협업적 가상기업으로서의 CITIS 모델개발 및 성능분석에 관한 연구)

  • Han Seung Heun;Chin Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.87-98
    • /
    • 2002
  • Korea government is making an effort to improve the efficiency in construction industry by introducing CITIS (Contractor integrated Technical Information Service). In order to provide a base for the application of CITIS into the construction industry, this research provides a concept of virtual factory which should be incorporated into CITIS system for the successful collaborative work in the virtual space. It then implements a prototype system through process and data modeling to apply into the road construction projects. The prototype system is tested to verify its efficiency. Finally, lesson learned from these works is provided to advance the current CITIS toward a collaborative virtual factory.

Cause of Schedule delay-based Constraints Analysis Process (작업지연원인 기반 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.637-642
    • /
    • 2007
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of working progress makes higher. Finding each work's constraints performs constraints analysis in process of construction for checking probability of working progress. Grasp work's constraints through the constraints analysis and removes. This research will show preventing delay of consruction project, through constraints analysis process.

  • PDF