• Title/Summary/Keyword: 프로젝트 관리자 역량

Search Result 54, Processing Time 0.02 seconds

Development of BIM Utilization Level Evaluation Model in Construction Management Company (건설사업관리기업의 BIM 활용수준 평가 모형 개발)

  • Jeong, Seo-Hee;Kim, Gwang-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.24-33
    • /
    • 2024
  • Recently, as smart construction has become more active, construction companys are evaluating their smart construction capabilities in order to transform into smart construction companies. However, the revitalization of smart construction doesn't only apply to construction companies, the level of utilization of all participants, including owners, designers, construction project managers, and construction company, must be improved. Therefore, this study aims to present a model that evaluate the building information modeling (BIM) utilization level for measuring the BIM utilization level of construction management companies in executing construction project management. In this study, an AHP questionnaire survey targeting BIM practitioners to calculate the weight of each BIM utilization item and score it to construct evaluation model and evaluate it by applying it to construction management companies are conducted. As a result of the evaluation using model, there were differences between companies in the number of BIM users, and in the qualitative evaluation, it is mainly used for interference review, constructability review, and design change management. Therefore, in order to revitalize BIM, it is believed that it is necessary to strengthen BIM utilization ability through separate training for construction manager (CMr) and to present clear utilization standards and scope of work for BIM utilization in performing construction management tasks. Consequently, evaluating more construction management companies using the model presented in this study will result in the transition of CM companies to smart construction and revitalization of BIM adoption.

Leadership Competencies of IT Project Managers : from Team Social Capital Perspective (IT프로젝트 관리자의 리더십 역량 : 팀 내 사회적 자본 관점에서)

  • Lee, Hye-Jung;Park, Jun-Gi;Lee, Jung-Woo
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.133-147
    • /
    • 2011
  • This study explores the applicability of social capital theory in IT project management. Specifically, an empirical model is developed using different types of leadership competencies (emotional, cognitive, and social) as independent constructs impacting IT project performance. Social capital shared among team members are measured and placed as a mediating construct between leadership competencies and performance. Using PLS analysis of 120 data points collected through a survey of IT project participants in two large electronic manufacturers, direct and indirect impacts of leadership competencies are explicated. Research results reveal that emotional leadership competency seems to directly influence the project performance but not through team social capital, while social leadership competency seems to indirectly influence the project performance through team social capital but not directly onto the project performance. Cognitive leadership competency is the only leadership competency that maintains direct and indirect influence on project performance. Total effect of cognitive competency on project performance is almost two times larger than the total effect of emotional leadership competency and six times larger than the total effect of social leadership competency. Implications of findings are discussed at the end, and further studies are suggested.

The Effect of Project Managers' Competences on Performance in Public S/W (공공 S/W 분야에서 프로젝트 관리자의 역량이 성과에 미치는 영향)

  • Oh, Minjeong;Ju, Hyoungjun;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.230-239
    • /
    • 2021
  • There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.

Improvement of the Evaluation Method for VE Alternatives using the Risk Assessment Process (리스크 평가절차 도입을 통한 VE 대안 평가방법 개선)

  • Park, Jin-Ho;Jin, Zheng-xun;Hyun, Chang-taek;Kim, Hyun-joo;Kwon, Suk-hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.32-42
    • /
    • 2018
  • Since the success or failure of VE projects depends on the capabilities of participants, including owners, construction managers, architects, general contractors and VE experts, it is important to follow systematic procedures. However, it is often the case that only a rough evaluation is performed, or the rough and detailed evaluations are integrated in actual VE tasks. In this case, it is difficult to analyze and evaluate the alternatives in terms of risk, even for the important alternatives. This in turn leads to the so-called returning alternatives where the alternatives proposed in the preceding stage are returned to the original plans in the following stage, and thus the repetitive work for the alternatives often decreases the efficiency of the VE task. In this regard, this study proposed a risk assessment process for VE alternatives in order to minimize the occurrence of returning alternatives based on the systematic analysis and evaluation of VE alternatives. It will increase the efficiency of VE tasks by reduces the number of regression alternatives.

Successful Winning Award Factors in Early Stage of International Public Private Partnership Projects (해외개발사업 발굴단계의 수주성공요인 분석)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.84-94
    • /
    • 2017
  • Recently, domestic construction companies have increasingly engaged in international PPP projects a result of both uncertainties in the domestic construction market and low competitiveness in international EPC project business. These international PPP projects usually require long-term preparations and substantial sales costs, which make it important for decision-makers to select winning-award potential project in early stage of the projects. However, most previous research has analyzed success factors in terms of project development across all stages. Thus, this study investigated 28 success factors of 4 categories in the early stage of 31 international PPP projects. First, results indicate that unsolicited PPP projects require better implementation capabilities and financial conditions compared to solicited PPP projects. Second, implementation capability is important because it is not easy to improve as the project proceeds. Third, commercial conditions are identified as important even if conditions are not fixed in the early stage of PPP projects. Fourth, non-commercial conditions, strategy, and public interest are not found to be meaningful in the early stage of PPP projects because they can vary as the project proceeds. This study helps to improve selection criteria aimed towards more winning-award potential project in the early stage of international PPP projects.

A Study on the Obstacle Factors and the Development Strategy of High Value Occupational Training for Women (여성 고부가가치 직업훈련의 장애요인과 발전방안 연구)

  • Lee, Ji-Eun;Lim, Hee-Jeong
    • Journal of Digital Convergence
    • /
    • v.17 no.3
    • /
    • pp.181-189
    • /
    • 2019
  • The purpose of this study is to derive obstacle factors to 'high value vocational training' and to suggest development strategies. The training aims to solve the quantitative and qualitative problems of female employment by providing professional training in high value areas such as ICT, SW and knowledge service. To verify the training to meet these objectives, 48 processes operated in 2018 were analyzed and field monitoring was conducted. As a result of the analysis, problems were identified and improvements were derived in terms of learners management, training course design, field practice operation, and performance evaluation. Based on these results, researchers suggested four ways to develop high value vocational training. First, select learners based on combined talent and second, strengthen the project of linking enterprises and structured field practices. Third, establish a performance evaluation system of its own and manage performance and fourth, expand support for excellent training courses and provide consulting for course development. The results of this study are expected to be used as a reference for establishing policies for high value occupational training. In the future, quantitative research should be conducted to clarify the performance and problems.

The Effect of Interaction between Project Manager's Capabilities and Organizational Structure on Corporate Performance (프로젝트 관리자의 역량과 조직형태의 상호작용이 기업성과에 미치는 영향)

  • Seong-Il Lee;Seung-Chul Kim;Minjeong Oh;Sung-Yong Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.47 no.3
    • /
    • pp.202-216
    • /
    • 2024
  • In today's rapidly changing business environment, rapid decision making and effective project management are essential for business growth. This study examines how project manager competencies and organizational structures affect business performance. Successful project execution depends on the strategic use of project managers' skills and organizational resources to maximize performance. An empirical study was conducted with 475 participants from the construction and engineering sectors. The applied analyses included multiple regression analysis and two-way ANOVA to assess how project manager competencies and organizational types affect business performance. The results of the study show that project manager competencies significantly improve business performance, especially when combined with appropriate organizational types. Effective use of organizational frameworks leads to better financial results, increased market competitiveness, and greater innovation. The results of the study are as follows: First, project manager competencies were found to have a significant positive effect on business performance. Second, the use of functional, project, and matrix organizations had a significant positive effect on business performance. This suggests that aligning organizational structures with business objectives is important for achieving optimal performance. Overall, this study provides valuable insights into the academic literature and practical applications of project management and organizational research. In addition, if we can select organizational members based on the learning effects of previous projects when operating new projects in the future, it will help reduce risks. Ultimately, it will improve the project manager's competency level, promote the individual abilities and knowledge sharing of team members, and provide opportunities for the company to build efficient new systems. This will be evaluated as a valuable study in terms of academic and practical productivity.

지역산업진흥과 지역기술지도와의 연계

  • Lee, Gyeong-Mi
    • Proceedings of the Conference
    • /
    • 2005.06a
    • /
    • pp.33-45
    • /
    • 2005
  • 현재 지역산업진흥계획이 수립되기까지 수도권 억제와 지역경제 활성화를 위한 다양한 정책 및 법령들이 수립${\sim}$제정되어 왔으나, 그 성과는 미흡하였고, 첨단산업과 지역의 발전을 함께 추구한 과학기술 집적지 조성정책도 연구기관과 산업체간의 기술개발에 대한 수급의 불일치, 지역별 특성화와 차별화 미흡, 사업간 연계성 부족 등으로 성과는 미약하였다. 중앙 부처에서 다양한 지역산업 관련 기술개발 지원사업도 전개해 왔으나, 부처별로 독자적으로 사업을 추진하여, 정책 상호간의 연계성이 부족하고 투자 효율성이 저조하여, 산업자원부에서 산업발전법에 근거하여 2002년 '지역산업진흥계획'을 수립하였다. 이 계획은 지역별 전략산업을 중심으로 한 지역혁신체제 구축에 초점을 두고 있으며, 지역의 내생적 성장을 위한 네트워크 형성, 투입요소 증대에서 지역 산업경쟁력 강화로의 전환, 중앙정부와 지자체의 공동 계획입안 등에서 기존의 정책들과 차이를 보인다. 지역산업정책의 최종목표는 '지역균형발전'이며, 중간목표는 '지역산업의 활성화'라고 할 수 있다. '지역산업의 활성화'를 위한 기본전략으로 '3개 권역별 전략산업 집중 육성'과 '제도적 기반 구축'을 제시하고 있다. 이러한 기본전략은 매우 포괄적이어서 정책수단으로 보기에는 무리가 있다. 따라서 이러한 기본전략 하에 추진하고자하는 사업들을 검토하고 평가의 목적에 맞게 유형화함으로써 동지역균형발전과 지역경쟁력의 강화이며, 그 기본전략으로는 지자체의 역할제고를 바탕으로 한 전략산업 중심의 지역혁신체제(Regional Innovation System : RIS) 구축을 제안하고 있다. 지역 내에서는 각 조직 간의 역할분담이나 연계가 이루어지지 않아 인력과 재원 및 특정분야에 대한 중복투자 문제가 지적되고 있으며 각각 소규모여서 규모의 경제효과를 꾀할 수 없고 경제적 효과가 가시화되는 데에는 오랜 시일이 걸리고 있고, 지역의 산업발전을 체계적으로 기획하고 지역내 다양한 이해관계를 조정하는 총괄 추진기구가 없어 효율적인 지역산업육성에 한계가 있었다. 지방정부의 과학기술예산 및 전담조직, 산업경제예산 및 전담 조직의 부족과 미 정착으로 독자적인 지역과학기술정책이나 지역산업정책은 물론이고 지역혁신정책을 수행하기 어려웠으나, 지역의 특성과 잠재력에 맞는 사업을 발굴하여 중앙정부에 건의하고 지역 내 각 프로젝트를 총괄 조정하는 중개자 역할을 지역전략산업기획단이 그 역할을 수행하고 있다. 지역혁신체제의 중심기관으로 중개기관과 협력 프로그램에 의한 플랫폼 구축 및 지역산업발전의 기획${\sim}$조정기구로서, 선진국의 지역발전기구(Regional Development Agency : RDA)인 지역전략산업기획단이 2002년도부터 산업자원부와 9개 시도에 의해 설립되어 지역네트워크의 활성화와 클러스터의 형성 촉진을 하게 되었고 2004년도에는 13개시도로 확대${\sim}$운영되고 있고, 지역특화사업(H/W)과 지역산업기술개발과제(S/W)와 함께 패케지 형태로 지원되며, 주요역할은 크게 지역산업의 정책기획 분야와 평가관리, 지역혁신역량 조사 및 DB구축 등으로 구분된다. 그중에서도 권역별, 지역별, 지역산업진흥사업 육성과 중장기 산업발전계획을 수립하기 위하여 지역혁신역량을 바탕으로 한 지역 Technology Road Map(TRM)작성사업은 전국공통의 1단계 사업으로 실시 ?榮쨉?, 2005년 3월 기준으로 9개 지역(강원, 대전, 충남, 충북, 경북, 울산, 전남, 전북, 제주) 26개 산업분야를 대상으로 23개가 완료된 상황이다. 이를 근거로 한 지역정책과 R&D 과제 및 필요 인프라의 도출이 체계적으로 구축되어 지역산업 발전을 위한 기술역량이 강화될 것이다.

  • PDF

A Study on the Development of Educational Software for Web-based Visual Effects Interactive Environment (Web 기반 VE(Visual Effects) 인터랙티브 환경 교육용 소프트웨어 개발에 관한 연구)

  • Na, Wonshik
    • Journal of Convergence for Information Technology
    • /
    • v.7 no.5
    • /
    • pp.89-93
    • /
    • 2017
  • As the cost of installing and maintaining software on large organizations such as recent companies and schools has increased, software installation and maintenance costs are low, system management is easy, demand for ease of use software solutions has increased. In the reality that special education for service center engineers is required along with the release of various products, training of the software and solution industry is regarded as important. Building Web-based user and system interactive environment, strengthened usability and educational ability effect suitable for engineer level. In the future, research that is familiar with specific software, not successfully combining multiple frameworks, rather than developers, will be increasingly important for research that can achieve optimal performance.

A Study on Model Development for SW Human Resources Development using Supply Chain Management Model (SCM 모델을 이용한 SW인력양성 모형개발 연구)

  • Lee, Jung-Mann;Om, Ki-Yong;Song, Chan-Hoo;Kim, Kwan-Young
    • Journal of Korea Technology Innovation Society
    • /
    • v.10 no.1
    • /
    • pp.22-46
    • /
    • 2007
  • This article introduces a recent innovation in Korea's human resources development policy in the SW sector. Facing serious problems in cultivating SW engineers such as a mismatch in supply and demand of SW workers, shortage of globally competitive SW professionals, and insufficient education and training of university graduates, the Korean government has decided to adopt a new paradigm in national SW engineering education, based on supply chain management (SCM) in manufacturing. SCM has been a major component of the corporate competitive strategy, enhancing organizational productiveness and responsiveness in a highly competitive environment. It weighs improving competitiveness of the supply chain as a whole via long-term commitment to supply chain relationships and a cooperative, integrated approach to business processes. These characteristics of SCM are believed to provide insight into a more effective IT education and university-industry collaboration. On the basis of the SCM literature, a framework for industry-oriented SW human resources development is designed, and then applied in the case of nurturing computer-software engineers in Korea. This approach is expected to fumish valuable implications not only to Korean policy makers, but also to other countries making similar efforts to enhance the effectiveness and flexibility in human resources development. The construction of SCM-based SW HRD model is first trial to apply SCM into SW HRD field. The model is divided into three kinds of primary activities and two kinds of supportive activities in the field of value chain such as SW HRD Council, SW demand and supply plan establishment and the integration of SW engineering capabilities that contribute the reduction of the skill and job matching through SW HR demand and supply collaboration.

  • PDF