• Title/Summary/Keyword: 프로젝트성공요소

Search Result 159, Processing Time 0.054 seconds

Development of Design Collaboration Management System for Multiple Participants in Design Projects (설계프로젝트 참여자간 협업지원을 위한 설계협업관리 시스템 개발)

  • Lee, Jee-Hee;Yi, June-Seong;Shin, Seung-Woo;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.23-32
    • /
    • 2010
  • Construction Projects have mutual collaborative structures among various participants for common objectives. Most of all the design project which is the initial phase in the project is crucial for determining project overall quality and requires intimate and continuous relations between project participants. Thus, this study suggests Design Collaboration Management System for successful performing projects through cooperation among participants in the initial stage of projects. First, expert interviews were performed to figure out present conditions of design collaboration management and problems. The factor analysis was applied to draw owner's collaboration factors and engineer's collaboration factors. Based on those factors, this study suggests design cooperation management process which gives a framework for systematic management method. Through the process the design collaboration management system was developed which helps owner/designers/engineer's co-work. The System suggested from this study realizes systematic information management tool and through that it is expected to improve design product;'s quality, and further contribute the advancement of project.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

A Framework for Identifying and Analyzing IT Project Risk Factors (IT프로젝트 위험 요인 식별 및 분석 프레임워크 연구)

  • Jangho Choi;Chanhee Kwak;Heeseok Lee
    • Information Systems Review
    • /
    • v.19 no.4
    • /
    • pp.87-110
    • /
    • 2017
  • Analyzing and finding the risk factors in information technology (IT) projects have been discussed because risk management is an important issue in IT project management. This study obtained the risk factor checklists with priorities, analyzed the causal relationship of risk factors, and determined their influences on IT project management. However, only few studies systematically classified IT project risk factors in terms of risk exposure. These studies considered both the probability of occurrence and the degree of risk simultaneously. The present study determined 53 IT project risk factors on the basis of literature and expert group discussions. Additionally, this study presented clustering analysis based on the data of 140 project managers. The IT project risk factor classification framework was divided into four areas (HIHF, HILF, LIHF, and LILF). The present results can be used to help IT project managers establish effective risk management strategies and reduce IT project failures. This study also provides academic implication because it considers both the probability of occurrence and the degree of influence of risk factors.

Digital-hospital Research on the Factors that Lead to the Success of the Overseas-hospital Export Business through an Analysis of the Bidding Documents (해외병원 입찰분석을 통한 디지털병원 수출사업 성공요인)

  • Cha, Maengkyu;Kim, Jung Ok;Yu, Kiyun
    • KIISE Transactions on Computing Practices
    • /
    • v.23 no.6
    • /
    • pp.359-370
    • /
    • 2017
  • In overseas-hospital construction, the digital hospital is a trend that is based on the developments of the information and communication technologies, state-of-the-art medical equipment, smart health, and telemedicine. Along with the increasing proportion of IT, this has resulted in the spreading of the concept throughout city-like hospitals and their transformation into digital hospitals. In the hospital-construction business, IT is a key element that will link the modernization of the mechanical, electrical, and equipment systems, construction, and medical equipment for efficiency maximization through integration. The purpose of this study is the analysis of the market-expansion success factors through the construction of a success-story-based, IT-driven overseas-hospital business. The digital-hospital concept and the development process are analyzed through a literature review, and the success factors are analyzed in terms of the cost, time, and quality that are proposed in the project-management body of knowledge. The main contributions of this study regarding the success factors are as follows: First, a cost-side need exists regarding the establishment of strategic-value engineering in terms of increasing the value from the perspectives of the IT and operational infrastructures; second, in terms of the construction time, all of the hospital systems must comply with the established deadlines for the integrated test and commissioning; and lastly, in terms of quality, it is important to ensure that the System Integration digital-hospital services are delivered according to the user requirements.

A Study on Open Source Transition Strategy of Record System (기록시스템의 오픈소스화 전략 연구)

  • An, Dae-jin;Yim, Jin-hee
    • The Korean Journal of Archival Studies
    • /
    • no.52
    • /
    • pp.119-170
    • /
    • 2017
  • This study aims to analyze the environment for the open-source records system and to identify the risk and requirements for the success of the strategy in Korea. For this, Chapter 2 presented a review of the strategic benefits of open source to public organizations, developers, and users. It also discussed the process of cooperatively developing and releasing the source code and the technology infrastructure supporting open source. In Chapter 3, six representative open-source projects in the field of records management were selected, and case studies were conducted. To derive comprehensive implications, we have divided the main development body of open-source projects into international organizations, international cooperation systems, national archives, and software development companies. We also analyzed the background and purpose of each project, the agents of development and funding, the governance model, the development period and cost, the business model and software architecture, the community composition, and the licensing strategy. Through this, we have derived four critical success factors. In terms of technology, a component-based design was required; therefore, we proposed a microservice architecture and a model-view-controller design pattern. Next, it was necessary to reestablish system requirements of records center and archives. Moreover, we also proposed a dual licensing strategy to allow developers to easily participate in open-source projects. Lastly, we emphasized a strong governance structure and an effective cooperation framework to create a sustainable community. For a record system to be open-source successfully in an organization-centered market, the roles of software developers and end users should be exercised more in the community. To achieve this, it is important to build various collaborative tools and development infrastructure from a planning stage to a centralized one.

A Study on the Quantitative Risk Level Calculation Model in Cooperation with the Reserve Fund (예비비와 연계한 정량적 리스크 수준 산정 모델에 관한 연구)

  • Kwoak, Song-Hae;Park, Koo-Rack;Kim, Dong-Hyun
    • Journal of Digital Convergence
    • /
    • v.14 no.10
    • /
    • pp.159-166
    • /
    • 2016
  • Recent public information project, which has been organized mainly to large companies is a situation that is being reorganized to small and medium-sized systems integration company. However, many of the small and medium-sized companies lack knowledge of the systematic risk management. Thus, in connection with the revenue, it involves a number of problems. Therefore, in this paper, we present a risk element that occurs mainly in the field of the project, providing a model for measuring the risk element by risk level costs associated with this. Through the convergence, we aim at providing a management system that is able to make the project successfully accomplished, predicting the risk that occurs in advance to pursue the project; Based on the proposed model, it is possible to secure a proper size of reserve fund so it is expected to enable companies to ensure the cost of risk analysis.

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

A Study on Analysis of Productive Construction Project and Influential Elements for Public Owner's Perspective - Focused on Highway Construction - (발주자 관점의 생산적인 건설 프로젝트와 영향요소의 분석에 관한 연구 - 고속도로 건설사업을 대상으로 -)

  • Woo, Sungkwon;Lee, Young-Hwan;Chang, Chul-Ki;Lee, Siwook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.645-653
    • /
    • 2012
  • The productivity management of highway construction is required to innovate the efficiency of investment The productivity management of highway construction is required to innovate the efficiency of investment cost for newly constructed projects and to improve the quality of these projects, as the maintenance and management expenses are steadily increasing for existing highways under operation. However, clear criteria, methods or requirements to measure the productivity and performance in the construction of highways have not been properly established yet. This study defined 5 major elements of the productive projects in terms of construction management which is one of major tasks of the owner. There were the 43 influential elements significantly affecting on the productivity and these elements were categorized into the hierarchical structure which was composed of 3 levels. Also, this study conducted a survey for Korea Expressway Corporation who is the largest owner in Korea's highway construction. As a result, major project performance indicators, which should be addressed for management, to execute the projects successfully, are presented through understanding the extent of the affection of productivity elements on the elements of project performance to attain the productive projects and through understanding the extent of demand to be improved.

A Study on the Elements for Open Access Policies of Universities (대학의 오픈액세스 정책 수립시 구성요소에 관한 연구)

  • Joung, Kyoung-Hee
    • Journal of Korean Library and Information Science Society
    • /
    • v.41 no.2
    • /
    • pp.229-250
    • /
    • 2010
  • Open access policies are very important for the successful open access projects in any institutions. This study aims to propose elements to consider for establishing open access policies of universities. The 3 university institutional repositories' open access policies in Korea and foreign universities' policies registered in the ROARMAP are analyzed. The major categories proposed in the study are materials, time of deposition, depositors, copyright, level of requirement, exemption, usage, options for open access, and support.

  • PDF

An Approach to Component Identification based on Use-Case (유즈케이스 기반의 컴포넌트 식별 방법)

  • 김태웅;김경민
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10b
    • /
    • pp.301-303
    • /
    • 2003
  • 컴포넌트 기반 개발 방법론이 확산됨에 따라 성공적인 컴포넌트 기반 프로젝트의 핵심 요소인 효과적인 컴포넌트 식별 방법에 관한 연구가 활발히 진행되고 있다. 이에 본 논문에서는 시스템이 사용자에게 제공하는 기능을 독립적으로 분류한 유즈케이스를 기반으로 하여 인터페이스를 식별하고, 식별된 인터페이스의 상호작용을 분석하여 컴포넌트를 식별하는 방법에 대해 제안한다. 이를 위하여 유즈케이스를 기반으로 외부 인터페이스를 식별하고, 시나리오를 이용하여 식별된 인터페이스 단위로 객체를 추출한다. 추출된 객체에서 공통 객체를 분석하여 내부 인터페이스와 컴포넌트를 식별하고 최종적으로 이러한 인터페이스의 상호작용과 의존성을 분석하여 컴포넌트를 식별 하고자 한다.

  • PDF