• Title/Summary/Keyword: 표준 공정계획

Search Result 46, Processing Time 0.024 seconds

A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project (하천공사 대표공종의 작업조 구성 및 생산성 정보 개발)

  • Yoo, Duk-Yul;Park, Hyung-Keun;Lim, Hyeong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2519-2528
    • /
    • 2013
  • The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

Automatic Process Planning by Parsing the Parameters of Standard Features (표준형상 매개변수 추출을 이용한 자동공정계획)

  • 신동목
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.3
    • /
    • pp.105-111
    • /
    • 2003
  • This paper presents an approach to automate process planning of press dies for manufacturing of car bodies. Considering that the press-dies used at the same press operations regardless of the panels they produce or the car models of which they produce panels have similar shapes except for the forming part of the dies, general approaches to recognize manufacturing features from CAD models are not necessary. Therefore, a hybrid approach is proposed combining feature-based design and feature-extraction approaches. The proposed method recognizes features by parsing the parameters extracted from CAD models and finds proper operations by querying the database by the recognized features. An internet-based process planning system is developed to demonstrate the proposed approach and to suggest a new paradigm of process planning system that utilizes an internet access to the CAD system.

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF

Control Level Process Modeling Methodology Based on PLC (PLC 기반 제어정보 모델링 방법론)

  • Ko, Min-Suk;Kwak, Jong-Geun;Wang, Gi-Nam;Park, Sang-Chul
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.4
    • /
    • pp.67-79
    • /
    • 2009
  • Because a product in the car industry has a short life cycle in recent years, the process planning and the manufacturing lines have to be changed frequently. Most of time, repositioning an existing facility and modifying used control information are faster than making completely new process planning. However, control information and control code such as PLC code are difficult to understand. Hence, industries prefer writing a new control code instead of using the existing complex one. It shows the lack of information reusability in the existing process planning. As a result, to reduce this redundancy and lack of reusability, we propose a SOS-Net modeling method. SOS-Net is a standard methodology used to describe control information. It is based on the Device Structure which consists of sensor information derived from device hardware information. Thus, SOS-Net can describe a real control state for automated manufacturing systems. The SOS-Net model is easy to understand and can be converted into PLC Code easily. It also enables to modify control information, thus increases the reusability of the new process planning. Proposed model in this paper plays an intermediary role between the process planning and PLC code generation. It can reduce the process planning and implementation time as well as cost.

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

An Operational Scheme of Software Configuration Management (소프트웨어 형상관리 운영 방안에 관한 연구)

  • 김태달
    • Proceedings of the Korea Database Society Conference
    • /
    • 1999.10a
    • /
    • pp.165-171
    • /
    • 1999
  • 형상관리는 프로젝트를 추진함에 있어 현실적으로 필수적인 관리 항목으로 인식할 필요성이 대두되고 있다. 그 이유는 프로젝트를 성공적으로 완료하기 위해서는 전체 프로젝트 공정을 통해 사전에 계획된 절차에 준하여 단계별로 어떻게 추진되고 있는지 추진과정을 추적, 확인되어야 하며, 또한 추진 결과에 있어 단계별로 어떤 결과물이 양산되고 있는지를 검증 및 확인하여야 하기 때문이다. 본 논문에서는 이러한 형상관리를 위해서는 프로젝트 수행 초기에 형상관리 계획을 입안하기 위한 형상관리 조직형태를 제안하며 작성된 계획서에 수록된 형상관리 조직을 운영함에 있어 필요한 형상관리활동의 주요 내용들에 대해 국내외 표준 및 지침에 대해 조사하였으며, 현실적으로 공공 프로젝트를 추진함에 있어 형상관리를 위한 필수관리 항목과 문서화 기준 및 이들 문서들간의 연관성에 대해 연구, 제안한다.

  • PDF

해외건설공사 수행절차(7) - 준공단계(竣工段階)

  • 해외건설협회
    • 월간 기계설비
    • /
    • no.12 s.221
    • /
    • pp.62-64
    • /
    • 2008
  • 현장에서는 주공정과 예산관리를 중심으로 공사진행을 하고, 공정이 90% 이상 달성되었거나 또는 잔여공기가 9개윌 정도 남아 있으면 모든 공정을 재검토하기 바란다. 우선 하청시로부터 잔여 공사에 대한 공정표를 받아, 잔여공시 1개월 전에 준공될 수 있는지 검토한다. 9개월 정도 앞서 준공기일을 검토하는 것은, 자재납기가 장기간(7개월 정도) 소요되는(플랜트 Control Panel 등) 자재의 발주여부를 검토하고, 잔여공기 내에 정상 작업으로 공기 내 준공이 불가하다고 예측될 경우, 3개월 또는 6개월 돌관작업 계획을 세우기 위함이다. 잔여공기가 3개월 정도 남아 있을 때, 시설물을 인계(Hand Over) 하기 위해 본격적인 준비를 한다. 준공이란 "계약적으로 발주자가 실제적으로 계약서에 의도된 목적으로 사용할 수 있는 상태(표준계악일반조건 48. 1)"를 말하므로, 이 점에 착안하여 발주자가 시설물을 제때에 사용하지 못함으로써 발생되는 지체보상금(Liquidated Damage)을 물지 않도록 작전을 세운다.

  • PDF

A Process Planning System for Machining of Dies for Auto-Body Production (자동차 차체금형 가공용 공정계획 시스템)

  • 신동목;이창호;이기우
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.17 no.5
    • /
    • pp.108-115
    • /
    • 2000
  • This paper presents a variant type process planning system for machining of dies for auto-body production. Through the analysis of dies and their manufacturing processes, the authors categorized the press dies into 15 groups according to the similarity of machining features. After critically reviewing current manufacturing procedures, a standard process plan was defined for each group. The authors present MP3D the process planning system built on the standard process plan database, and show how they apply it at the die manufacturing plant of an automobile company. MP3D is expected to reduce major losses in machining such as reworking caused by mistakenly uncut features and eventually to help to accumulate the knowledge of operators. The operation sheet MP3D produces is also used in monitoring the progress of manufacturing of dies. This paper explains the whole development cycle of a process planning system from process analysis to application so that it can help readers to develop and apply a process planning system to their machine shops.

  • PDF

Interworking Status of Public Land Mobile Network According to Open Network Interconnection (상호접속에 따른 육상이동망 연동현황)

  • Hwang, G.
    • Electronics and Telecommunications Trends
    • /
    • v.10 no.3 s.37
    • /
    • pp.125-131
    • /
    • 1995
  • 공중육상이동통신망(PLMN)은 계속적으로 발전중에 있는 통신분야이다. 현재 다른 데이터 통신망의 추세를 비추어 볼 때, 이러한 공중육상이동통신망은 기존의 고정형 통신망인 공중교환전화망(PSTN)과 도입관계에 있는 종합정보 통신망(ISDN)과 연동이 필수적이라고 하겠다. 현재 데이터망과의 연동에 대한 개정작업은 진행중에 있다. 이러한 추세에 맞추어 새로운 서비스의 망간접속에 대한 연구가 필요하며 그에 따른 상호 접속 공정 경쟁의 국내 현황과 사업자간 협정을 분석하였다. 이 결과는 추후 망간연동에 대한 표준(안) 및 기준(안)을 작성하는데 기초자료로 사용할 계획이다.