A tension member that has a high-strength bolt fastened to a standard bolt hole increases structural resistance but causes problems from workability or economic perspectives. In this research, a total of 28 samples that have standard and over bolt holes as the tension member's high-strength bolted connection were made and a tension test was conducted. The change of strength of the connection has been confirmed by comparing the tension load of standard and over bolt hole samples obtained from the test results with the design strength due to net section and end distance. Samples made with over bolt holes had a lighter tension load than that of samples made with standard bolt holes, exceeded the design strength of present design standards, and although decrease in strength was inevitable due to the over bolt hole, their safety was satisfactory.
The SPT If value has been known to be influenced by various factors, among which the actually delivered energy level of the falling ram has the most significant effect. If N values of different energy levels are to be applied in the general analysis which is based on N values of standard energy levee the safety of the foundation might be in danger or the design might be overestimated. In this study the actual falling velocity of the ram has been measured so that the energy level could be estimated. The results Indicated that the energy level should be considered in the analysis or the design in this country, since the measured values are different from the internationally accepted scandard value, N60
Kim, Mu-Jun;Kim, Kye-Hyun;Nam, Gi-Beom;Kim, Na-Young
Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
/
2010.09a
/
pp.350-354
/
2010
전 세계적인 지구 온난화 현상으로 해수면 상승과 생태계 변화가 발생하여 기후변화에 대한 사회적관심이 증가하고 있다. 이와 더불어 기후변화와 지구환경시스템의 대기, 수권, 생물권, 지표면 동 각 권역간의 상호작용과 피드백을 고려한 연구가 증가하고 있는 실정이다. 기후와 환경을 통합적으로 분석하여 기후변화에 따른 지구환경시스템의 변화특성을 이해하고 이러한 피드백 과정을 파악하기 위해서는 분석 자료의 원활한 공유와 연계를 위한 통합 데이터베이스 구축이 필요하다. 이를 위해서는 먼저 다양한 기후/환경 연구 분야의 자료를 관리하기 위한 데이터의 의미, 명칭, 정의 등에 대한 원칙의 수립이 요구된다. 따라서 본 연구에서는 기후/환경 변화예측 연구 자료의 원활한 공유와 관리를 위한 데이터 표준화 연구를 수행하였다. 기후/환경 변화예측 연구 분야의 자료 현황을 조사 및 분석하였고 그에 따른 자료 관리 방안을 마련하였다. 그 결과 관리할 오브젝트를 기준으로 기후/환경 연구 분야의 데이터 표준화를 수행하였고 표준단어, 표준도메인, 표준용어를 정의하였다. 데이터 표준화 결과는 기후/환경 변화예측 자료를 관리하고 공유하는데 있어 데이터의 의미를 효율적으로 파악하고, 데이터베이스 설계과정에서 데이터의 품질과 생산성을 향상 시킬 수 있다. 향후 연구에서는 데이터베이스 개념적 엔티티의 속성설계 단계부터 데이터 표준을 적용한 통합 데이터베이스 구축이 필요하다.
Journal of the Institute of Electronics Engineers of Korea SD
/
v.48
no.11
/
pp.41-47
/
2011
A novel digital instrumentation amplifier(DIA) converting universal signal inputs into 5V voltage-output for industry standard sensor signal processing was designed. The circuit consists of a commercial instrumentation amplifier, seven analog switches, two voltage references of 1.0V and -10.0V, and four resistors. The converting principle is the circuit reconstruction by switches for resistor values and reference voltages according to input signals. The simulation result shows that the DIA has a good output voltage characteristics of 0~5V for the input voltage of 0V~5V, 1V~5V, -10V~+10V, and 4mA~20mA. The nonlinearity error was less than 0.1% for the four type signal inputs.
본 연구는 발전용 풍력설비의 안정적인 전원공급 및 계통운영에 필요한 기술기준 및 규정을 제정하는 것으로 전기사업법 제67조(기술기준)에 따라 전기설비의 안전관리를 위하여 운영중인 기술기준 중 현재 제정되어 있지 않은 $\ulcorner$발전용 풍력설비기술기준$\lrcorner$과 법정 기술기준을 구체화하여 설비의 설계, 제작, 시공, 운영, 검사 및 보수시에 기술지침으로 활용할 수 있는 $\ulcorner$풍력발전규정$\lrcorner$을 신규로 개발하는 것이다. 현재 기술기준은 전기사업법 제67조(기술기준) 및 동 법 시행령 제43조(기술기준의 제정)에 따라 전기설비기술기준, 발전용 화력설비기술기준, 발전용 수력설비기술기준 및 발전설비 용접기술기준 등 4개가 고시로 운영중이다. 그러나 국내 풍력발전기 설비용량은 약 22MW이고, 다수가 건설중 이거나 계획 중에 있으나 설치허가 및 검사기준이 되어야 할 기술기준이 없는 상황이다. 따라서, 본 연구를 통하여 풍력발전설비에 대한 국내기술의 안정적인 전원공급 및 계통운영에 필요한 기술기준(안) 및 규정(안)등을 실현하였다.
Journal of the Computational Structural Engineering Institute of Korea
/
v.30
no.3
/
pp.207-214
/
2017
High voltage electric power transmitter GIS(Gas Insulated Switchgear) above 72.5kV needs to satisfy domestic Korean peninsular standard(ES-6110-0002) in KEPCO with respect to normal and special operation conditions which include internal gas pressure, dead weight, wind and seismic load. Some other requirements not described in Korean standard can be applied from other international standards such as IEC(International Electronical Committee) 62271-203 and 62271-207. The GIS is a kind of pressure vessel structure made of aluminum and filled with SF6 gas of internal pressure 0.4~0.5MPa. Finite element analysis of GIS is performed with such operational loads including seismic loading and the stability and reliability is determined according to ASME BPVC(Boiler and Pressure Vessel Code) SEC. VIII standard where the allowable stress level of the pressure vessel is suggested. The result shows that the stress of GIS is satisfied the allowable stress level and the safety factor is about 2.3 for Korean peninsular standard.
Park, In-Pyo;Kim, Han-Soo;Kim, Gi-hyun;Shin, Jeong-Su;Shin, Jung-Jin;Lee, Yun-Kyung
Proceedings of the KIEE Conference
/
2015.07a
/
pp.1623-1624
/
2015
최근 전기설비의 안전성 확보와 인체감전보호를 위해 저압차단기 관련 국제표준 부합화 및 이에 근거한 관련 전기설비기술기준이 제 개정되었다. 저압차단기의 용도에 따른 안전과 특성기준을 구체화하여 설계, 시공 및 검사 등에 필요한 전기설비기술기준의 판단기준 제 개정 현황을 소개하고자 한다.
Korean Journal of Construction Engineering and Management
/
v.10
no.3
/
pp.32-41
/
2009
In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.
Cho, Seong Seop;Kim, Yong Seong;Chee, In Taeg;Lee, Dal Won
Korean Journal of Agricultural Science
/
v.23
no.1
/
pp.1-12
/
1996
To design the safe and rational rock slope, several rock slopes of roads in Kang-won area were analyzed, and the following results were obtained ; 1. The results were analyzed by stereographic projection at the rock slope that the joint was developed. All of the sloped which were designed by standard slope of rock was not considered that the joints were unstable. 2. The relation of rainfall and slope failure, as well as the danger of failure, was very high when the maximum hourly rainfall was larger than 20mm and when there was a 2-day cumulative rainfall that was larger than 200mm. 3. In the design of rock slope, operated by the stereographic projection considering discontinuity. If turn out unstable, it should be analyzed carefully using the limit equilibrium method. 4. In the design of rock slope, it is desirable to consider the discontinuity of rock(joint, bedding, fault).
Park, In-Pyo;Kim, Han-Soo;Kim, Gi-hyun;Lee, Joong-hee
Proceedings of the KIEE Conference
/
2015.07a
/
pp.1621-1622
/
2015
765 kV 가공송전선로의 안정성 관련으로 전기설비기술기준 제36조제1항 및 동 기준의 판단기준 제126조제4항제7호에 대하여 전선, 애자련, 강재, 송전철탑 및 기초에 대한 현행 기준 적정성을 검토하였다. 검토의 목적은 현재 765 kV 가공송전선로의 내력 크기를 파악하는 것이고 그 과정에서 전기설비기술기준의 개선 사항을 도출하는 것이다. 검토 방법은 현행 전기설비기술기준을 기준으로 했을 때, 한전의 765 kV 송전선로의 여유도(크기)을 파악하고, 또한 해외 기준과 비교를 통하여 우리나라 전기설비기술기준의 적정성을 평가하고자 하였다. 검토 자료는 국내 765 kV Ca-32p형 샘플설계도, 한전 관련 시방서, 국내 전기설비기술기준, 일본 전기설비기술기준 및 일본전기학회의 [송전용 구조물 설계 표준, JEC-127-1979]이다. 향후 다른 철탑형들의 추가 검토와 미국 및 유럽의 기준들과 대비 분석을 진행할 예정이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.