Cost-Benefit Analysis of Oxy-Combustion Demonstration Project (순산소발전 실증사업의 비용-편익 분석)

  • Jin, Se-Jun;Yoo, Seung-Hoon
    • Journal of Energy Engineering
    • /
    • v.21 no.2
    • /
    • pp.179-186
    • /
    • 2012
  • A climate change by increase of greenhouse gas is coming to the front by a large issue, and oxy-combustion demonstration project is coming to the attention to one plans for the reduction of carbon dioxide in power generation sector that used a fossil energy in points of time. This paper estimates benefit of electric generation, benefit of greenhouse gas reduction, benefit of environmental pollutant decreasing and domestic and foreign market value-added benefit caused by oxy-combustion demonstration project. Furthermore, this paper attempts to cost-benefit analysis, using NPV, B/C ratio, IRR techniques for oxy-combustion demonstration project. The results indicate that NPV is 681,620million KRW, B/C ratio 1.69 and IRR 21.4%. Accordingly, oxy-combustion demonstration project ensures economic feasibility that the three indicators have exceeded 0, 1.0 and 5.5%. Moreover, uses of the result is useful for the reduction of carbon dioxide in thermal power generation sector of policy decision.

Using Cost-Benefit Analysis for a Feasibility Study on Constructing a Storage Facility in the Small River Basin (비용편익 분석을 통한 소하천유역의 저류조 설치 타당성 분석연구)

  • Seo, Se-Deok;Lee, Seung-Wook;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.1
    • /
    • pp.135-141
    • /
    • 2016
  • This study aims to analyze the feasibility of installing a storage facility and make recommendations based on a cost-benefit analysis regarding the installation of a storage facility capable of preventing both floods and droughts. The capacity and installation costs are specified for the storage facility necessary to prevent floods, and a cost-benefit analysis is conducted by calculating the costs and benefits for each cost or benefit factor such as loss amounts, recovery costs, and drought prevention. The information can be used as the basic data for suggesting the feasibility of installing a multipurpose storage facility capable of preventing floods and droughts simultaneously. Also, this study expects to utilize its detailed results in a number of different ways including the prediction of loss amounts from natural disasters.

Indirect benefits of the introduction of Korean Spatial Information System (한국형 공간정보시스템 도입의 간접적 편익에 관한 분석)

  • Lee, Young-Sung;Kim, Kab-Sung;Jung, Hayoung;Kim, Jin
    • Journal of the Korean Regional Science Association
    • /
    • v.33 no.2
    • /
    • pp.39-46
    • /
    • 2017
  • This study estimated indirect economic benefits of the introduction of Korean Spatial Information System. Korean academic society has been reluctant to consider indirect benefits as an item of benefits in cost-benefit analysis. Nevertheless, other countries including England recommend to consider some indirect benefits like option value as an important item of cost-benefit analysis, especially in the case of transportation projects. This study estimated indirect benefits of the introduction of Korean Spatial Information System using Contingent Valuation Methods: Indirect benefits of the project are so significant in terms of statistics and substantial in terms of magnitude that decision making can differ from the case without consideration of such indirect benefits.

The Valuation of HSA Business Using Broadband over Power Line (전력선통신망을 이용한 HSA사업의 경제적 타당성 분석)

  • Lyoo, Tae-Ho;Kim, Chang-Seob
    • Journal of Energy Engineering
    • /
    • v.16 no.4
    • /
    • pp.202-214
    • /
    • 2007
  • The concept of HSA (Home Service Aggregator) is derived from performing the energy IT business efficiently as well as successfully launcing a new service based on BPL (Broadband over Power Line). The HSA business using a BPL can extend the field of energy industry and an give a chance to create a new demand by consumer-oriented services. This study focuses on the exact evaluation of HSA business using BPL, and reasonable trusty evaluation should be the first step to launch the HSA business. In this study, the categories of cost are comprised of equipment (mainly RSM and MGW) cost, instalation cost, and maintenance cost. AMR (Automatic Meter Reading), internet integration billing service, integration charging service, internet service, sorority service, and electricity safety are listed for benefit. In this study, the ROI of HSA business is 0.9594, which is less than 1. However, that value does not consider the electricity safety benefit which is classified as a social benefit. Therefore, the value can be above 1 if it includes social and private benefits.

선사안전관리지표 개발 및 경제성 분석

  • No, Chang-Gyun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.06a
    • /
    • pp.165-166
    • /
    • 2012
  • 국내 선사와 선박의 안전관리시스템을 평가하기 위하여 평가 지표들을 종합적으로 적용할 수 있는 평가기준을 개발하였다. 추정된 비용과 편익을 기초로 순편익현재가치와 편익비용비율을 구하여 안전관리시스템 도입의 타당성을 분석하였다. - 생략

  • PDF

Benefit-Cost Analysis of GIS in Local Governments: A Case Study of Taegu Metropolitan City (지방자치단체에서 GIS구축에 따른 비용편익분석: 대구광역시를 사례로)

  • Jo, Myung-Hee;Kim, Kwang Ju;Park, Sang-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.2 no.2
    • /
    • pp.87-96
    • /
    • 1999
  • Using the case of Taegu city, this study analyses benefits and costs related to the construction of GIS to local government. For this purpose, the study uses a case study selecting Taegu Metropolitan city. In this study, four discount rates(5%, 8%, 10%, 12%) are used for sensitivity analyses. According to this benefit-cost analysis, Taegu city government could get positive net present benefits from the year of 2004 which is 6 years after its GIS construction. This a result, Provides the economical and financial validity of GIS Construition in local government. In this study, analysis of invisible benefits are excluded. If these invisible and potential benefits are included in the analysis, GIS could produce more net benefits and the even break point of GIS construction in local governments will come earlier. For the further study, the study needs to develop new benefits and utilize cost-effectiveness analysis to catch these invisible benefits.

  • PDF

A Study on the Additional Cost of the Elderly Accidents (고령자 사고 추가발생비용 분석에 대한 연구)

  • Yoon, Byoung-Jo;Ko, Eun-Hyeok;Yang, Sung-Ryong
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2017.11a
    • /
    • pp.247-248
    • /
    • 2017
  • 교통사고는 인적피해, 물적피해, 사회적피해와 거시적으로는 심리적 피해까지 일으키며 많은 비용을 발생시킨다. 이처럼 교통사고로 인해 발생하는 다양한 피해요소를 비용으로 환산하여 추정하는 것은 교통안전사업의 절감편익을 산정하거나 기타 교통관련사업의 효과를 적용하기 위하여 활용할 수 있다. 하지만 현재까지 이루어진 사고비용 산출에 대한 연구론은 1당사자와 2당사자 구분없이 사고 전체를 아우르는 피해비용을 산출하는 방식의 접근 방법과, 사상자 1인 기준으로 발생되는 피해비용을 산출하는 방식의 접근 방법으로 나뉘며, 두 접근방법 모두 비용분석의 대상을 단일 객체로 간주하고 분석하는 한계를 지니고 있다. 이에 본 연구에서는 특정한 상호작용효과가 있을 것으로 예상되는 고연령 구간을 확인한 뒤 고연령 구간과 전체 연령 구간 사이에서 발생된 사고를 비교분석하여 1당사자와 2당사자가 모두 고연령 구간일 때 추가로 발생되는 사고비용을 산출 및 검정함으로서 고령자 사고감소효과 및 절감편익에 활용될 수 있는 상호작용 효과에 따른 추가 절감편익을 산출하였다.

  • PDF

Benefit analysis model of the national map revision program using replacement cost method (대체비용법을 이용한 수치지형도 갱신사업의 편익분석 모형 연구)

  • Son, Hwamin;Yang, Sungchul;Ga, Chillo;Yu, Kiyun;Huh, Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.79-87
    • /
    • 2013
  • This study proposed a method to analyze the economic benefit of the national map revision program using the replacement cost method. The replacement cost method measures the benefit of a project as the minimum cost to replace functions of the project with those of alternative goods or services in an existing market. Thus, the demands on 1/5,000 topographic map revision in 18 administrative tasks such as city and district management planning were surveyed in three local autonomous entities. Then the cost to alternatively fulfill the demands was estimated with the standard construction estimating system for the field surveying and surveying results in commercial GIS companies for the site investigation. With this cost estimation model, the benefit of the current national map revision program to the local autonomous entities was estimated as 265,960,999 won. And cost benefit ratios according to several revision frequencies from 0.5 to 4 year were also compared to find the optimal frequency.

Cost-Benefit Analysis on Potential Inundation Affected by Bridge Span Length (범람예상구역의 비용-편익 분석(교량 경간장을 중심으로))

  • Kim, Soo-Jun;Chung, Jae-Hak;Lee, Jong-Seol;Lee, Ho-Yul
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1655-1659
    • /
    • 2007
  • 하천을 횡단하는 교량은 하천의 배수위를 증가시키는 중요한 요인으로 작용한다. 더욱이 산지 하천에 시공된 교량은 유송잡물에 의한 폐색으로 인하여 교량 직상류부에 홍수피해를 가중하는 역할을 하기도 한다. 본 연구에서는 교량 재가설에 따른 경제적 타당성을 검토하고자 교각에 집적되는 유송잡물에 의한 배수위만이 홍수범람을 일으키는 원인으로 가정하여 제방고 이상의 홍수용량이 범람한 상황을 고려하였다. 이러한 홍수량이 유역내에서 어느 정도의 피해를 입히는지에 대하여 다차원 홍수피해 산정방법에 의거 교각의 개수를 줄임으로써 저감할 수 있는 침수피해액을 산정하였다. 그리고 교량의 재가설을 위한 개략공사비를 비용으로 보고, 재가설에 따라 저감할 수 있는 침수피해액을 편익으로 산정하여 비용-편익 분석을 실시한 결과 합리적으로 교량의 경간장을 확보하는 방안을 마련할 수 있었다.

  • PDF

Calculation of Total Benefit by the Contingent Valuation Method for Cost-Benefit Analysis: Focusing on Income and Distance-Decay Effects (비용편익분석을 위한 조건부가치측정법에서의 총편익 산정: 소득효과 및 거리-소멸 효과를 중심으로)

  • Lee, Jongyearn
    • KDI Journal of Economic Policy
    • /
    • v.36 no.1
    • /
    • pp.43-80
    • /
    • 2014
  • This study suggests a model for calculating total benefit rigorously to use the contingent valuation method (CVM) in cost-benefit analysis (CBA). Estimating households' willingness to pay through survey method, the study attempts to demonstrate if a respondent's income and the distance between a respondent's residence and the location of a target facility affect her willingness to pay. The estimation results from a structural model show that income and distance-decay effects exist and that the calculated total benefit varies largely when these effects are ignored. The study emphasizes the effects of income and distance-decay on the total benefit must be carefully considered in using CVM for CBA. Even though the total project cost is precisely estimated, the benefit/cost (B/C) ratio may differ largely when the total benefit is not correctly calculated. Also, an ad hoc model generates significantly different estimates from the utility difference model this study adopted. The difference in estimates suggests that the total benefit has to be estimated by a structural model. Finally, simulations are performed to check the validity of the model as well as to predict consequences when income and distance-decay effects are not properly treated. The results from simulations reveal it is not desirable to ignore those effects considering the perspectives of balanced regional development.

  • PDF