• Title/Summary/Keyword: 퇴직공제사업

Search Result 4, Processing Time 0.022 seconds

법령과 고시(1)-건설근로자 퇴직공제대상 사업장 대폭 확대

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.9 s.206
    • /
    • pp.22-23
    • /
    • 2007
  • 내년부터는 건설근로자 퇴직공제대상 사업이 '5억원 이상 공공공사'와 '20가구 이상 공동주택'으로 확대된다. 또 사업주가 내는 납입금액이 1일 4,000원으로 높아진다. 건설교통부는 불안정한 고용과 낮은 임금 등 열악한 환경에서 일하고 있는 건설 일용근로자의 복지를 확대하기 위해 이 같은 내용의 퇴직공제제도 개선 방안을 마련했다.

  • PDF

Proposal Strategy and Performance Analysis of Electronic Human Resources Management Pilot Project (건설근로자공제회 전자인력관리(전자카드제)시범사업 성과 분석 및 추진전략 도출)

  • Kim, Inchie;Chin, Sangyoon;Kim, Seongah;Kim, Yeasang;Lee, Sangjun;Park, Soohun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.3-11
    • /
    • 2018
  • The Construction Workers Mutual Aid Association is carrying out a number of strategic tasks with the goal of "contributing to improving employment and stabilizing the return of workers to construction workers through employment welfare and retirement deduction services." One of them is the retirement deduction system. The retirement allowance system is a system for the retirement income and livelihood security of construction workers who are not adequately protected by the Labor Standards Act, such as retirement allowances due to the nature of day labor. The Construction Workers Mutual Aid Association has promoted the introduction of electronic manpower management. For the efficient management of the pilot sites and the plans for the future, comprehensive evaluation of the pilot sites as well as the evaluation of the status and operation results of each pilot project site are needed. Therefore, in this study, we will develop performance indicators to evaluate the current state of electronic manpower pilot projects and analyze the actual situation of pilot project sites through actual application, and try to derive future implementation strategies.

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.