Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

Correlation Analysis on the Duration and CO2 Emission Following the Earth-work Equipment Combination (토공장비조합에 따른 공사기간 및 이산화탄소 배출량의 상관성 분석)

  • Kim, Byungsoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.603-611
    • /
    • 2011
  • After Kyoto Protocol was adopted for green gas reduction, each nations are stepping up efforts to reduce $CO_2$ of a typical green gas. Construction industry also is trying $CO_2$ reduction with the techniques of two types which are software and hardware techniques. The software technique are Passive Design considered green gas emission and the environment impact assessment by LCA. The hardware techniques are adjustment of equipment system and development of eco- friendly material. But, it is nonexistent that a study related to $CO_2$ emission considered detail process in construction industry. This study analyzed the correlation of equipment combination, $CO_2$ emission and duration by calculate $CO_2$ emission follow to equipment combination on earth-work which is the process emitted most $CO_2$ among railway bedding construction.

A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project (하천공사 대표공종의 작업조 구성 및 생산성 정보 개발)

  • Yoo, Duk-Yul;Park, Hyung-Keun;Lim, Hyeong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2519-2528
    • /
    • 2013
  • The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.

Building Underground Facility Management System of Power Transmission and Power Distribution using GIS (지리정보체계를 이용한 송배전 지하시설물관리시스템 구축)

  • Jang, Yong-Gu;Kang, In-Joon;Kim, Sang-Seok;Yang, Seung-Tae
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.7 no.2
    • /
    • pp.69-77
    • /
    • 2004
  • Now, there are some problems to manage underground facilities in domestic. Specially, in the case of KEPCO(Korea Electric Power Corporation), it is so difficult to manage electronic line more stably and detailedly because the geographic information and attribute information being built is not easy to be updated in the field. KEPCO officials who are accompanying management and supervision in earthwork do not have sufficient knowledge and information about GIS but they grasp the information of geography and property which coincide with the field. Therefore they have to refer their business analysis contents sufficiently for more efficient lines management in the KEPCO, but it is problem that the existing information of electronic lines management system is not. In this study, we constructed power transmission and power distribution underground facility management system for the user to manage and maintain underground facilities more easily and safely using the information of geography and property about power transmission and power distribution underground facility which have been built by KEPCO.

  • PDF

Deduction on The Problems and Improve The Way of The Successful Bidder Determination Method for Turnkey·Alternative Bid Construction (턴키·대안입찰공사 낙찰자 결정방식의 문제점 및 개선 방안 도출)

  • Park, Hong-Tae;Lee, Yang-kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1881-1891
    • /
    • 2014
  • Full system of turnkey deliberation committee in 2010 was abolished and permanent Deliberation committee was introduced. So far, ordering organization selected the best method suitable for the design and comprehensive evaluation method in the turnkey bid construction. Comprehensive evaluation method have bid price design score coordination, weighted basis, the best design approach fixed amount, five successful bidder decision method in addition. Design deliberation branch committee in the successful bidder decision way configured and operated branch members of special design consultation committee, But main agent changed from committee deliberation pull system to permanent committee deliberation, as well as and The lobby burden was not improved. This similar to the past at the portion of the design deliberation and the way of the design deliberation in the turnkey bid construction. Therefore it is necessary to improve the design deliberation system. In other words, design score and technology competition should be adapted to determine a successful bid. This study suggested the operating system of the design deliberation, the decision method problems of the successful bidder and ways to improve the design deliberation.

A Case Study on the Application of Machine Guidance in Construction Field (공사 현장에서의 Machine Guidance 적용에 관한 사례연구)

  • Kim, Wanbong;Park, Sangil;Lee, Riho;Seo, Jongwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.721-731
    • /
    • 2018
  • Manpower in domestic construction sites is becoming more and more aging. Various methods have been devised to prevent productivity and quality deterioration of construction due to absence of skilled workers and difficulty in supplying manpower. Especially, many researchers study various methods such as Machine Guidance (MG) and Remote Machine Control to improve productivity and quality. Although many prior studies have been conducted since the advent of MG, There is lack of field test in a difficult site to stakeout. In this study, field test of MG excavator was carried out at difficult site to stakeout, and productivity analysis and quality evaluation were conducted. As a result of the analysis of productivity, the minimum value was 20.5%, the maximum value was 56.9%, and the average productivity in 4 days was 38.3% higher than the standard product. As a result of the analysis of quality, the horizontal error ${\pm}1cm$ and the vertical error ${\pm}2cm$ confirmed in the previous study were verified.

A Development of the Automated Vertical Controllable Device for Improving Construction Performance of Pile Driver (파일드라이버 기계 시공성능 향상을 위한 연직 자동제어기의 개발)

  • Cho, Chang-Yeon;Lee, Jun-Bok;Son, Jae-Ho;Kim, Han-Soo;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.78-90
    • /
    • 2006
  • There is no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vertical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. The main objective of the research is to develop the automated vertical controllable prototype equipment for PHC piles in order to achieve uniform construction qualify as well as improving safety and productivity. The paper explains the literature review on PHC pile and pile installation process, development of prototype, field test of the prototype and its performance evaluation in terms of quality and safety as well as productivity. The results of the research will lead the further researches on the automated pile installation system.

A Study on the Establishment of Governance for Water-Saving in Agricultural Water (농업용수의 물절약을 위한 거버넌스 구축 연구)

  • Lee, Seul Gi;Choi, Kyung Sook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.365-365
    • /
    • 2021
  • 기후변화로 인하여 발생하는 자연재해는 수많은 인명 및 재산 피해를 일으키며, 그 중에서도 가뭄은 물과 식량의 안보를 위협하고 있다. 이에 OECD(2015)는 미래의 세계 인구 40%가 2050년까지 물이 부족한 강 유역에서 살 것이라 예측하고 있으며, 물의 다층적 거버넌스를 개발하여 물을 효과적으로 사용하기 위한 상향식 의사결정, 통합물관리 체제의 개념을 제시하기도 하였다. 우리나라 역시 가뭄으로 인한 피해발생이 빈번하고, 그 강도나 범위가 점차 증가하는 추세이다. 하지만 2000년부터 한국농어촌공사(출범은 '농업기반공사')가 농업용수를 관리해오고 있으며, 농업용 수리시설의 증축, 관리 등이 공적인 관리쳬계로 변화해오면서 자연스럽게 농업인의 물관리는 배제되었다. 또한, 농업용수는 무상·무제한 공공재라는 인식과 농업인 평균 연령이 높아짐에 따라 농업인의 물꼬관리 및 수로 훼손, 무단취수 행위 등에 대한 제제가 불가능한 실정이다. 본 연구에서 최근 농식품부의 「2019년 정부가뭄종합대책」에 포함되어 있는 물절약 거버넌스 구축 및 운영 내용을 바탕으로 농업용수 관리 및 사용구조를 고려하여 두 개 지역의 농어촌공사(여주이천지사, 경주지사) 주도 하에 거버넌스를 간담회 형식으로 운영하였다. 농업용수 물절약 거번넌스 이해관계자들은 각 지역별 공기업, 공무원, 농업인, 언론인, 학계 전문가 등이 참가하였으며, 거버넌스 운영 2회 및 설문조사를 실시하였다. 그 결과 각 이해관계자들은 농업용수 절약을 위한 현재 문제점 및 해결방안 등에 대한 의견을 제시하였으며, 설문조사를 통하여 농어촌공사의 신뢰도 및 중요도가 가장 높고, 높은 중요도에 비하여 농업인 및 지자체 등은 신뢰도가 낮은 것을 확인 할 수 있었다. 이러한 결과는 농업인이 농업용수에 대한 주인의식을 가지고, 적극적이고 자발적인 참여가 필요하다는 것을 보여주고 있으며, 본 연구를 통하여 이루어진 간담회 형식의 거버넌스보다 운영효과 및 지속성을 유지할 수 있는 형태의 거버넌스가 연구되어야한다. 향후 농촌형물 거버넌스 모형이 개발되기 위하여 본 연구는 기초자료로 활용할 수 있다.

  • PDF

A Study on the Determination of the Optimal Parameter for the Evaluation of the Effective Prestress Force on the Bonded Tendon (부착식 텐던의 유효 긴장력 평가를 위한 최적의 매개변수 결정에 관한 연구)

  • Jang, Jung Bum;Lee, Hong Pyo;Hwang, Kyeong Min;Song, Young Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2A
    • /
    • pp.161-168
    • /
    • 2010
  • The bonded tendon was adopted to the reactor building of some operating nuclear power plants in Korea and the assessment of the effective prestress force on the bonded tendon is being issued as an important pending problem for continuous operation beyond their design life. The sensitivity analysis of various parameters was carried out to evaluate the effective prestress force using the system identification technique and the optimal parameters were determined for SI technique in this study. The 1/5 scaled post-tensioned concrete beams with the bonded tendon type were manufactured and in order to investigate the relationship of the natural frequency and the displacement to the effective prestress force, impact test, SIMO sine sweep test and bending test using the optical fiber sensor and the compact displacement transducer were carried out. As a result of tests, both the natural frequency and the displacement show the good relationship with the effective prestress force and both parameters are available for the SI technique to estimate the effective prestress force.

Analysis of Construction Company's Bidding Practice under the Lowest Bidding System (최저가낙찰제하에서의 건설업체의 투찰 형태 분석)

  • Lee, Hyungwoo;Chang, Chul-Ki;Kim, Yong-Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.975-983
    • /
    • 2006
  • This study analyzed bidding data for construction projects ordered by the Public Procurement Service under the lowest bidding system since 2001 by using statistical technique in terms of construction types, company sizes, bidding prices. This study brings out construction company's bidding practices and problems caused by the current lowest bidding system and suggests the way to mitigate the problems and to improve the lowest bidding system. The analysis shows the problem of winning a bid in abnormally low price under the lowest bidding system, feared at the start, was realized. As bidding practice has polarized with low and high price, the analysis shows that the lowest bid system's market has a high possibility to be distorted by construction companies' bid strategies. To complement the lowest bidding system's problem, the analysis shows that introduction of the bidding system using particulars where bidders estimate construction quantities and unit prices by themselves is needed.