Effectiveness of Reinforcement for Transitional Zone between Tunnel and Earthwork Using the Large Sleeper (대형침목을 이용한 터널/토공 접속구간의 보강효과)

  • Choi, Chan-Yong;Lee, Jin-Wook;Kim, Hun-Ki
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.2
    • /
    • pp.214-221
    • /
    • 2010
  • The transitional zone between tunnel and earthwork is one of the most vulnerable areas site for railway lines and because of differential settlement due to different stiffness of each supporting layer, it has to conducted a maintenance work constantly. In this study, it is conducted to compare the effect of reinforcement by wheel load and displacement of the sleepers after existing sleepers are replaced with the large sleepers for 20m long in-field transitional zone. Also, numerical parametric study using multi-layer elastic method has been performed to compare rail force, settlement and stresses of ballast while varying size and space of the sleeper. The field test and numerical results show that replacing the large sleepers improves about 10% of total settlement and coefficient of wheel force than conventional sleepers. Effectiveness of improvement is about 9.3%, 4%, 14.5% for rail seat force, settlement of sleepers and ballast pressure respectively with size of sleepers.

The Research on the Numbers of Workable Days for Earth Works in Different Regions in Korea (Part II) (한국의 지역별 토공가능일수에 관한 조사연구)

  • 안병기;민병섭;박승범
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.13 no.3
    • /
    • pp.2372-2387
    • /
    • 1971
  • 1. Being seen at the table (20), the number of days which monthy average air temperatures are three degrees of Celsius thermometer($3^{\circ}C$) or more, is the highest marks to be 365 days at Cheju, secondly, 334 days at Pusan, and, Ulsan, Pohang, Mokpo,Yosu and Ullung-Do which all are coastal region are all 306 days, besides, all north area of Taegu and Kwang ju have 275 days consquently, there are 90 days, differance between maximum and minimum. 2. Being seen at the table(22), freezing dates to be influenced upon earth works are obtained, if (1) item is subtracted from 365 days one year. 3. Being seen at the table(18), number of rainy days of which records are 1 millimeter and over to be influenced upon earth through works, days which monthly average air temperatures are $3^{\circ}$ or more, is the maximum to be 100 days at Cheju and its minimum is 60 days at Taegu. Every other region show 70 days or so. But Ullung-Do is 90 days. 4. Being seen at the table (26), the numbers of annual earth works possibility days(4) are obtained, if the values (3) which number of rainy days more than 1 millimeter during the same period are multiplied by 1.27(coefficient of hindrance to earth works) are subtracted from the number of days which monthly average air temperatures $3^{\circ}$ or more [(1)-(3)=(4)]. 5. The number of annual earth works possibility days by regional groups is the maximum to be 242 days at Pusan, and Cheju are 239 days. Other regions are from 218 days to 181 days, namely, they are about 200 days.

  • PDF

A Study on the Landscape Analysis of Rode Using GIS (G.I.S를 이용한 노선주위의 경관해석에 관한 연구)

  • Jung, Young-Dong;Ko, Jae-Woong
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.4 no.1 s.6
    • /
    • pp.83-91
    • /
    • 1996
  • With the growth of cities, there is a nero today for construction of outer road of cities but there are many problems in executing the scheme. In this study 5 kilos' distance, a part of the first section from East Kwangju I.C. in 36kilos' distance, the road circling Other Kwangju city is determined as the object of this study and illustrated by GIS. Besides that, the landscape which is varied according to survey location is illustrated each section by using data such as plans and 1he planed height. and the area for this study which is circling around Mt. Mudeung, a noted in Kwangju city is represented by GIS.

  • PDF

A Study on Object Detection Algorithm for Intelligent Excavator (자동화 굴삭기의 주변 장애물 탐지 알고리즘 개발에 관한 기초연구)

  • Soh, Ji-Yune;Kim, Min-Woong;Lee, Jun-Bok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.373-376
    • /
    • 2007
  • The construction industry is an inevitable part of modem development. Now-a-days, the construction industry experiencing several issues related with the maintenance of productivity, quality and labor. Hence there is an immediate requirement for the development of technologies enabling the automated construction equipment. The new technologies should also assure the sufficient safety and efficiency. In the present investigation, an attempts have been made for the development of object sensing algorithm and safety control system for intelligent excavating system. we have analyzed some elemental technologies for sensing objects and also proposed a technology for safety control system as well. The proposed technology will highly influence the safe working performance of construction industry in the positive sense.

  • PDF

An Experimental Study on the Change of Bulking Coefficient of Soils Mixed with Rock Blades (암버력이 혼재된 토사의 토량환산계수 변화에 관한 실험적 연구)

  • Park, Yeong Mog
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5C
    • /
    • pp.193-198
    • /
    • 2012
  • Field and laboratory tests were performed to investigate the swelling(L value) and shrinkage modulus (C value) of soil and rock mixtures using 2 sites. According to test results, when disturbed soil and rock were mixed with same amount (5:5), the maximum density was achieved and showed 19% and 18% increased at each site comparing with the unit weight of rock only. Since measured L values of mixtures were overestimated about 4 to 11% compare to estimated values based on the conventional method. While C values were underestimated about 13~20% compare to conventional values due to the development of compacting equipments and effective construction management. When rock and soil were mixed in the ratio of 5 to 5, the unit weight of the mixture was higher than that of other mixtures and rock or soil only.

Configuring Excavator Attachments for Eco-Operation (에코토공을 위한 굴삭기 작업장치 최적 조합 탐색)

  • Lee, Hong-Chul;Kim, Byung-Soo;Lee, Dong-Eun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.325-332
    • /
    • 2016
  • Configuring excavator attachments and engine sizes is the prerequisite for appropriate excavator assignment. Existing experience based configuration practice is lack of scientific rational because many variables (e.g., equipment motion data, soil and rock type and condition, equipment's engineering dimension along with bucket properties, job and management conditions etc.) should be considered simultaneously and timely fashion. This paper presents a new excavator configuration searching method that identifies the most favorable excavator configuration (i.e., the optimal set of excavator's maximum digging height and bucket size) to complement these existing practices. The method coded by using MATLAB identifies an optimal excavator configuration by considering those variables causing the variability of productivity. A case study is presented to demonstrate and to verify the system.

열정! 건설현장을 찾아서 - 상생, 시스템, 자율 안전관리의 삼박자 완벽 조화, 롯데건설(주) 제주시티호텔 신축현장

  • Jeong, Tae-Yeong
    • The Safety technology
    • /
    • no.192
    • /
    • pp.16-18
    • /
    • 2013
  • 국제관광도시로서의 명상을 돈독히 다지고 있는 제주도. 최근 이곳의 관광업 관계자들은 물론 지역주민들은 한껏 기대감에 부풀어 올로 있다. 바로 롯데건설(주)이 시공하는 제주시티호텔이 다음 달이면 준공될 예정이기 때문이다. 실제로 이곳은 제주도 내에서 가장 높은 건축물(90m)로 탄생하면서 랜드마크 역할을 톡톡히 할 것으로 전망되고 있다. 이곳 현장은 지난 2011년 8월 구 제주일보 사옥 철거공사를 시작으로 2011년 12월부터 TOP DOWN 및 UP-UP공법을 병행하여 토공, 골조공사를 본격적으로 착수했다. 현재는 공정율 85% 수준으로 건물외부 코깅작업 및 내부 인테리어 마감작업이 진행 중이다. 이곳이 특히 주목받고 있는 이유는 롯데건설(주)의 안전관리 기술력이 집약된 또 하나의 건축물이라는 평가를 듣고 있기 때문이다. 롯데건설(주) 관계자들은 이곳에 면세점과 호텔 등 다중이용시설이 들어서기 때문에 부실시공은 곧 대형안전사고를 불러온다는 인식을 바탕으로 빈틈없는 안전시공을 해나가고 있는 것이다. 이는 물론 현장 근로자들을 대하는 안전관리에도 고스란히 나타난다. 착공부터 현재까지 무재해 100만 시간을 앞두고 있다는 점이 이를 잘 증명한다. 안전으로 제주도의 새로운 명소를 건서래 나가고 있는 롯데건설(주) 제주시티호텔 신축현장을 찾아가 봤다.

  • PDF

A Study of the Combination Method for Earthwork Equipments Using the Environmental Loads and Costs (토공사 환경오염물질 부하량 및 공사비를 이용한 장비조합방법 연구)

  • Kang, Min-Ho;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1215-1224
    • /
    • 2013
  • Great efforts have been made worldwide to reduce the Green House Gas (GHG) emission following the "Kyoto Protocol" declared during the United Nations Framework Convention on Climate Change in 1997. Many industries have restructured to meet the standard set by the Protocol. However, no clear guidance has been established for the purpose of reducing the GHG emission in construction industry. In addition, no significant effort has been made to conserve the energy during construction activities. For more effective energy saving in construction industry, it is essential to collect data about energy consumption, quantity of environmental emissions and costs. However, most studies on sustainable construction have been concentrated on the use of equipment, maintenance and repair works during construction due to the difficulties of collecting such data. This study suggests a method to select the most environmentally friendly equipment combination for earthwork with comparing environmental loads and costs using the database of Life Cycle Inventory in the Ministry of Knowledge Economy and Ministry of Environment of Korea.

Factors of Selecting Temporary Road Positions for the Optimal Path of Earthwork Equipment in Road Constructions (도로공사에서 토공장비 최적 이동을 위한 가설도로 위치선정 요소)

  • Lee, Dong-Jun;Kim, Sung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.85-94
    • /
    • 2022
  • Construction industry is facing difficult challenges in terms of productivity, manpower, and industrial accidents. Currently, along with the 4th Industrial Revolution, various high-tech technologies are emerging, and efforts are being made to solve the problem by applying the technologies related to the 4th Industrial Revolution to the construction industry. As part of these efforts, research is being conducted to develop a construction equipment control system to increase productivity and safety at earthworks sites where many and various types of construction equipment are involved, and the system needs a function to increase productivity by optimizing the moving path of construction equipment. In the case of trucks, the location of the temporary road must be optimized in order to optimize the path of movement in the construction site. However, only matters related to the quality standard of temporary roads have been suggested so far, and there is no standardized process for efficiently determining the location of temporary roads. In this paper, the factors and its importance related to the location of the temporary road were identified through field surveys and interviews with experts, and a method for determining the location of the temporary road was presented. It was confirmed that the suggested method through a case study could improve the productivity of earthwork.

Development of 4D System based on New Methodology for Visualizing Construction Schedule Data for Civil Engineering Projects (토목시설물 공사관리 시각화를 취한 4D시스템 적용방안)

  • Kang, Leen Seok;Jee, Sang Bok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.95-103
    • /
    • 2006
  • One of the main functions of the 4D system includes visualizing numerical schedule data in construction. The existing 4D tools have an excellent function for simulating building projects that all activities are progressed according to vertical work zone. However, it is not easy to implement all of it in the civil engineering project because the construction activities of highway and railway projects are progressed on the horizontal work zone and the 4D simulation for those projects should include earthwork objects that depend on the natural ground condition. This study suggests a new methodology for improving those limitations of 4D system for the civil engineering project and develops a new system by the suggested methodology. To verify the developed system, this study attempts to simulate 4D object for horizontal elements such as earthwork, paving work and tunneling work. The morphing and multi-texturing techniques developed in the study can be new approaches to simulate 4D object for the earthwork such as cutting and banking whose activities are progressed on the natural ground condition. The research results can be expected as a draft function for improving the application of 4D system in civil engineering projects.