Jung, Hyuk Sang;Hong, Jong Ouk;Baeg, Seung In;Chun, Byung Sik
KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.4C
/
pp.129-137
/
2012
With the increase in infrastructure needs and tunnel construction, more complicated geometries have come to light, especially in cross tunnel design and construction. The major factors to influence existing tunnels are spacing between tunnels, relative position, size of the new tunnel, construction techniques, topographic and geologic conditions, structure, and alternative construction. In this study, settlement from an excavation for a new tunnel near an existing tunnel, settlement from a change in position of the new tunnel relative to an existing tunnel, and the distribution of deformations of the existing tunnel as a result of excavating the cross-location are analyzed through laboratory model tests. As the results, in condition of the new tunnels go through below the existing tunnel, not only analysed through the standard of the diameter of the tunnel, so it would need to set up to strengthen the field within each side of the 1D, but also determined the part of the cross in the existing and the new tunnel, should implement the reinforcement from the part of new tunnel to the existing tunneling influence of excavation.
Though the Grouting has been in use for a long time, it is still regarded as an technique rather than engineering. The study of ground improvement by grouting is rare especially in jointed rock mass. In this study, biaxial compression tests were performed in the jointed rock mass models with .ough surfBce joints assembled with blocks before and after grouting. The load-deformation curves of the jointed rock masses showed a non-linear relationship before grouting but showed a relatively linear deformaion behavior after grouting. Improvement ratio (deformation modulus after grouting/deformation modulus before grouting) decreased with increasing joint spacing and lateral stress. Improvement ratio decreased exponentially with increasing deformation modulus of the rock mass model before grouting. Three-dimensional FDM analysis was performed to a highway tunnel case using experimental data of grouted rock. The convergence of the tunnel predicted after grouting by the numerical modelling coincided with those attained from the field measurement.
In the design stage of a tunnel, the wall convergence is commonly estimated through an elasto-plastic analysis of the tunnel, which has been a topic drawing many researcher's attention so far. Despite its importance, however, the elasto-plastic behavior of a circular tunnel excavated in a generalized Hoek-Brown rockmass is still poorly understood. In this study, a simple munerical method based on Lee & Pietruszczak (2008) for the elasto-plastic analysis of a circular tunnel surrounded by reinforced annulus is proposed. It is assumed that the tunnel is excavated in a strain-softening rockmass obeying the generalized Hoek-Brown failure condition. The commercial code FLAC is used for the verification of the proposed method. The influence of the Hoek-Brown strength parameter a and the thickness of the reinforcement annulus on the elasto-plastic behavior around the tunnel was discussed by conducting some example analyses. The results show that the influence of these two parameters on the distribution of stresses and displacements is substantial.
Park, Min-Cheol;Han, Heui-Soo;Cho, Jae-Ho;Yang, Nam-Young
Journal of the Korean GEO-environmental Society
/
v.12
no.9
/
pp.35-45
/
2011
This paper is to analyze the behaviors of tunnel support by TDR(Time Domain Reflectometry) sensor using electrical pulse. To analysis the behaviors of tunnel support, Copper tape as sensing materials was studied for on-site installation. Copper tape to the top of the glass tape, foam tape, and shielding the lower part was used electromagnetic shield sheet. For a high sensitivity to load and fill out the measurement noise emissions has been developed for the production of materials. This sensing material through the tunnel model tests for the change by surcharge load in TDR data were analyzed. Varing stiffness and support of conditions were determined the change of TDR data through PVC pipe tunnel section model tests. By comparing TDR data and finite element analysis, the behaviors of the tunnel support materials were analyzed qualitatively.
Journal of Korean Tunnelling and Underground Space Association
/
v.8
no.4
/
pp.307-324
/
2006
Effects of new tunnel construction on an existing tunnel are investigated in this paper. A parametric study was conducted on a number of conditions in terms of relative location of the new tunnel to the existing tunnel using 2D and 3D finite element models. The results indicated that the new tunnel construction imposes most severe effect on the existing tunnel's lining when located below the existing tunnel's springline for cases in which the new tunnel is constructed parallel to the existing tunnel. It is also revealed that the effect to the new tunnel construction is larger when the new tunnel is constructed under the existing tunnel than above for cases in which the new tunnel is crossed with the existing tunnel. Practical implications of the finding are discussed.
Journal of Korean Tunnelling and Underground Space Association
/
v.5
no.1
/
pp.33-42
/
2003
The use of tunnels in major transportation schemes has increased considerably during the last decade especially in urban area. The state of stress and the displacements in a zone around a tunnel will be modified by the construction of a tunnel. Therefore, it is necessary to study the influence factors for the nearby tunnels. This paper describes the design concept and analysis method on the closely spaced tunnels. The main purpose of the present paper is to study the influence of tunnel construction on the behaviour induced in the liners of nearby tunnels. The effects of tunnel proximity and alignment, liner stiffness and settlements are also reviewed in this paper. The paper then introduces the design and analysis methods for the closely spaced tunnels which is very useful in practice.
Journal of Korean Tunnelling and Underground Space Association
/
v.7
no.2
/
pp.153-163
/
2005
This paper presents two case studies for tunnelling in Bangkok: a subway tunnel site and a flood diversion tunnel site. The first case study is related to ground displacement response for dual tunnel Bangkok MRT subway. The MRT subway project of Bangkok city consists of dual tunnels about 20 km long with 18 subway stations. The tunnels are seated in the firm first stiff silty clay layer between 15-22 m in depth below ground surface. The behavior of ground deformation response based on instrumentation is presented. The back analysis based on plain strain FEM analysis is also presented and agrees with field performance. The shear strain of FEM analysis is in the range of 0.1-1% and in accordance with the results of self boring pressuremeter tests. Meanwhile, the second case study is related to the EPB tunnelling bored underneath through underground obstruction. The Premprachakorn flood diversion tunnel is the shortcut tunnel to divert the flood water in rainy season into the Choapraya river. The tunnel was bored by means of EPB shield tunnelling in very stiff silty clay layer at about 20-24 m in depth. During flood diversion tunnel bored underneath the existing Bangkok main water supply tunnel and pile foundation of the bridge, instrumentation was monitored and compared with predicted FEM analysis. The prevention risk potential by means of predicting damage assessment is also presented and discussed.
Behavior of the existing tunnel in the jointed rocks was affected by the adjacent slope excavation. In this study, large scale model tests were conducted. To investigate the tunnel distortion depending on the excavated slope angle and the joint dip of the ground performed model tests were numerically back analyzed. Consequently, as the joint dip and slope angle became larger, the tunnel distortion was tended to be larger. Ground displacement was also greatly dependent on the joint dip and the excavated slope angle, which indicated the possibility of the optimal slope reinforcement.
The deformation modulus is one of the essential factors in determining ground behavior and safety during tunnel excavation. In this study, we conducted a back-analysis using crown settlements measured during tunnel excavation, using a horizontal inclinometer on a fault zone of pegmatite, and calculated the deformation modulus of the fault zone. This deformation modulus calculation was then compared with deformation moduli found through established relationships that use the correlation between RMR and the deformation modulus, as well as the results of pressure-meter tests. The deformation moduli calculated by back-analysis differs significantly from the deformation moduli determined through established relationships, as well as the results from pressure-meter tests conducted across the study area. Furthermore, the maximum crown settlements derived from numerical analysis conducted by applying deformation moduli determined by these established relationships and the pressure-meter tests produced noticeable differences. This result indicates that in the case of a weak rock mass, such as a fault zone, it is inappropriate to estimate the deformation modulus using preexisting relationships, and caution must be taken when considering the geological and geotechnical characteristics of weak rock.
Journal of Korean Tunnelling and Underground Space Association
/
v.20
no.3
/
pp.625-639
/
2018
This study is about the reinforcing type of reinforcement method which is reinforced in tunnel portal of tunnel with bad ground condition. Generally, it is known that the horizontal reinforcement method is more effective than the conventional reinforcement method. However, as a limitation of the tunnel construction technology, it is being constructed by the superposition reinforcement method. In recent years, high-strength large-diameter steel pipes and horizontally oriented longitudes (L = 30.0~50.0 m) construction technology have been developed. Therefore, it is required to study reinforcement method of tunnel portal reinforcement method. Therefore, 3-D numerical analysis (Midas GTS NX 3D) was performed by setting the reinforcement method (No reinforcement type, overlap reinforcement type and horizontal reinforcement type) and ground condition as parameters. As a result, it was considered that the reinforcement effect was the largest as the horizontal reinforcement type of the reinforcement method was the smallest in the displacement and the support material stress. Based on the results of the numerical analysis, horizontal steel pipe grouting was applied to the actual tunnel site. The displacement of the tunnel portal and the stress of the support material occurred within the allowable values and were considered to ensure sufficient stability.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.