• Title/Summary/Keyword: 터널 변형

Search Result 465, Processing Time 0.025 seconds

A Study on the Area of Reinforcement in the Cross Tunnel by Laboratory Model Test (실내모형실험을 통한 교차터널의 보강영역에 관한 연구)

  • Jung, Hyuk Sang;Hong, Jong Ouk;Baeg, Seung In;Chun, Byung Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4C
    • /
    • pp.129-137
    • /
    • 2012
  • With the increase in infrastructure needs and tunnel construction, more complicated geometries have come to light, especially in cross tunnel design and construction. The major factors to influence existing tunnels are spacing between tunnels, relative position, size of the new tunnel, construction techniques, topographic and geologic conditions, structure, and alternative construction. In this study, settlement from an excavation for a new tunnel near an existing tunnel, settlement from a change in position of the new tunnel relative to an existing tunnel, and the distribution of deformations of the existing tunnel as a result of excavating the cross-location are analyzed through laboratory model tests. As the results, in condition of the new tunnels go through below the existing tunnel, not only analysed through the standard of the diameter of the tunnel, so it would need to set up to strengthen the field within each side of the 1D, but also determined the part of the cross in the existing and the new tunnel, should implement the reinforcement from the part of new tunnel to the existing tunneling influence of excavation.

The Effect of Cement Milk Grouting on the Deformation Behavior of Jointed Rock Mass (시멘트현탁액 주입에 의한 절리암반의 역학적 특성 변화)

  • 김태혁;이정인
    • Tunnel and Underground Space
    • /
    • v.13 no.5
    • /
    • pp.331-343
    • /
    • 2003
  • Though the Grouting has been in use for a long time, it is still regarded as an technique rather than engineering. The study of ground improvement by grouting is rare especially in jointed rock mass. In this study, biaxial compression tests were performed in the jointed rock mass models with .ough surfBce joints assembled with blocks before and after grouting. The load-deformation curves of the jointed rock masses showed a non-linear relationship before grouting but showed a relatively linear deformaion behavior after grouting. Improvement ratio (deformation modulus after grouting/deformation modulus before grouting) decreased with increasing joint spacing and lateral stress. Improvement ratio decreased exponentially with increasing deformation modulus of the rock mass model before grouting. Three-dimensional FDM analysis was performed to a highway tunnel case using experimental data of grouted rock. The convergence of the tunnel predicted after grouting by the numerical modelling coincided with those attained from the field measurement.

Effect of Strength Parameter a in the Generalized Hoek-Brown Failure Criterion and the Reinforcement Thickness on the Elasto-plastic Behavior of Circular Tunnel (일반화된 Hoek-Brown 파괴조건식의 강도정수 a와 터널 보강깊이가 원형터널의 탄소성 거동에 미치는 영향)

  • Lee, Youn-Kyou;Park, Kyung-Soon
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.20-28
    • /
    • 2008
  • In the design stage of a tunnel, the wall convergence is commonly estimated through an elasto-plastic analysis of the tunnel, which has been a topic drawing many researcher's attention so far. Despite its importance, however, the elasto-plastic behavior of a circular tunnel excavated in a generalized Hoek-Brown rockmass is still poorly understood. In this study, a simple munerical method based on Lee & Pietruszczak (2008) for the elasto-plastic analysis of a circular tunnel surrounded by reinforced annulus is proposed. It is assumed that the tunnel is excavated in a strain-softening rockmass obeying the generalized Hoek-Brown failure condition. The commercial code FLAC is used for the verification of the proposed method. The influence of the Hoek-Brown strength parameter a and the thickness of the reinforcement annulus on the elasto-plastic behavior around the tunnel was discussed by conducting some example analyses. The results show that the influence of these two parameters on the distribution of stresses and displacements is substantial.

Model Experiments and Behavior Analyses of The Tunnel Support Using TDR Sensor (TDR센서를 이용한 터널 지보재의 모형 실험과 거동해석)

  • Park, Min-Cheol;Han, Heui-Soo;Cho, Jae-Ho;Yang, Nam-Young
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.9
    • /
    • pp.35-45
    • /
    • 2011
  • This paper is to analyze the behaviors of tunnel support by TDR(Time Domain Reflectometry) sensor using electrical pulse. To analysis the behaviors of tunnel support, Copper tape as sensing materials was studied for on-site installation. Copper tape to the top of the glass tape, foam tape, and shielding the lower part was used electromagnetic shield sheet. For a high sensitivity to load and fill out the measurement noise emissions has been developed for the production of materials. This sensing material through the tunnel model tests for the change by surcharge load in TDR data were analyzed. Varing stiffness and support of conditions were determined the change of TDR data through PVC pipe tunnel section model tests. By comparing TDR data and finite element analysis, the behaviors of the tunnel support materials were analyzed qualitatively.

Effects of Tunnel Construction on an Existing Tunnel Lining (터널 근접시공이 기존터널 라이닝에 미치는 영향에 관한 연구)

  • Yoo, Chung-Sik;Song, Ah-Ran
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.4
    • /
    • pp.307-324
    • /
    • 2006
  • Effects of new tunnel construction on an existing tunnel are investigated in this paper. A parametric study was conducted on a number of conditions in terms of relative location of the new tunnel to the existing tunnel using 2D and 3D finite element models. The results indicated that the new tunnel construction imposes most severe effect on the existing tunnel's lining when located below the existing tunnel's springline for cases in which the new tunnel is constructed parallel to the existing tunnel. It is also revealed that the effect to the new tunnel construction is larger when the new tunnel is constructed under the existing tunnel than above for cases in which the new tunnel is crossed with the existing tunnel. Practical implications of the finding are discussed.

A study on design concept and analysis method of closely spaced tunnels (근접터널의 설계개념 및 해석기법에 대한 연구)

  • Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.1
    • /
    • pp.33-42
    • /
    • 2003
  • The use of tunnels in major transportation schemes has increased considerably during the last decade especially in urban area. The state of stress and the displacements in a zone around a tunnel will be modified by the construction of a tunnel. Therefore, it is necessary to study the influence factors for the nearby tunnels. This paper describes the design concept and analysis method on the closely spaced tunnels. The main purpose of the present paper is to study the influence of tunnel construction on the behaviour induced in the liners of nearby tunnels. The effects of tunnel proximity and alignment, liner stiffness and settlements are also reviewed in this paper. The paper then introduces the design and analysis methods for the closely spaced tunnels which is very useful in practice.

  • PDF

Tunnelling in Bangkok - Two Case Studies (방콕의 터널공사 - 두 개의 사례연구)

  • Teparaksa, Wanchai;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.153-163
    • /
    • 2005
  • This paper presents two case studies for tunnelling in Bangkok: a subway tunnel site and a flood diversion tunnel site. The first case study is related to ground displacement response for dual tunnel Bangkok MRT subway. The MRT subway project of Bangkok city consists of dual tunnels about 20 km long with 18 subway stations. The tunnels are seated in the firm first stiff silty clay layer between 15-22 m in depth below ground surface. The behavior of ground deformation response based on instrumentation is presented. The back analysis based on plain strain FEM analysis is also presented and agrees with field performance. The shear strain of FEM analysis is in the range of 0.1-1% and in accordance with the results of self boring pressuremeter tests. Meanwhile, the second case study is related to the EPB tunnelling bored underneath through underground obstruction. The Premprachakorn flood diversion tunnel is the shortcut tunnel to divert the flood water in rainy season into the Choapraya river. The tunnel was bored by means of EPB shield tunnelling in very stiff silty clay layer at about 20-24 m in depth. During flood diversion tunnel bored underneath the existing Bangkok main water supply tunnel and pile foundation of the bridge, instrumentation was monitored and compared with predicted FEM analysis. The prevention risk potential by means of predicting damage assessment is also presented and discussed.

  • PDF

Deformation of Tunnel Affected by Adjacent Slope Excavation in a Joint Rock Mass (절리암반사면 굴착시 기존터널의 변형특성)

  • Lee, Jin-Wook;Lee, Sang-Duk
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.891-896
    • /
    • 2008
  • Behavior of the existing tunnel in the jointed rocks was affected by the adjacent slope excavation. In this study, large scale model tests were conducted. To investigate the tunnel distortion depending on the excavated slope angle and the joint dip of the ground performed model tests were numerically back analyzed. Consequently, as the joint dip and slope angle became larger, the tunnel distortion was tended to be larger. Ground displacement was also greatly dependent on the joint dip and the excavated slope angle, which indicated the possibility of the optimal slope reinforcement.

  • PDF

Estimation of the Deformation Modulus for a Fault Zone using Crown Settlements Measured During Tunnel Excavation (터널 굴착 중 측정된 천단변위를 이용한 단층대의 변형계수 산정)

  • Yun, Hyun-Seok;Moon, Seong-Woo;Song, Gyu-Jin;Seo, Yong-Seok;Kim, Ji-Soo;Woo, Sang-Baik
    • The Journal of Engineering Geology
    • /
    • v.24 no.2
    • /
    • pp.227-235
    • /
    • 2014
  • The deformation modulus is one of the essential factors in determining ground behavior and safety during tunnel excavation. In this study, we conducted a back-analysis using crown settlements measured during tunnel excavation, using a horizontal inclinometer on a fault zone of pegmatite, and calculated the deformation modulus of the fault zone. This deformation modulus calculation was then compared with deformation moduli found through established relationships that use the correlation between RMR and the deformation modulus, as well as the results of pressure-meter tests. The deformation moduli calculated by back-analysis differs significantly from the deformation moduli determined through established relationships, as well as the results from pressure-meter tests conducted across the study area. Furthermore, the maximum crown settlements derived from numerical analysis conducted by applying deformation moduli determined by these established relationships and the pressure-meter tests produced noticeable differences. This result indicates that in the case of a weak rock mass, such as a fault zone, it is inappropriate to estimate the deformation modulus using preexisting relationships, and caution must be taken when considering the geological and geotechnical characteristics of weak rock.

A study on the characteristics of tunnel deformation and support system according to tunnel portal reinforcement method (터널 갱구부 보강방법에 따른 터널 변형 및 지보재 응력특성에 관한 연구)

  • Moon, Kyoung-Sun;Seo, Yoon-Sic;Kang, Si-On;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.625-639
    • /
    • 2018
  • This study is about the reinforcing type of reinforcement method which is reinforced in tunnel portal of tunnel with bad ground condition. Generally, it is known that the horizontal reinforcement method is more effective than the conventional reinforcement method. However, as a limitation of the tunnel construction technology, it is being constructed by the superposition reinforcement method. In recent years, high-strength large-diameter steel pipes and horizontally oriented longitudes (L = 30.0~50.0 m) construction technology have been developed. Therefore, it is required to study reinforcement method of tunnel portal reinforcement method. Therefore, 3-D numerical analysis (Midas GTS NX 3D) was performed by setting the reinforcement method (No reinforcement type, overlap reinforcement type and horizontal reinforcement type) and ground condition as parameters. As a result, it was considered that the reinforcement effect was the largest as the horizontal reinforcement type of the reinforcement method was the smallest in the displacement and the support material stress. Based on the results of the numerical analysis, horizontal steel pipe grouting was applied to the actual tunnel site. The displacement of the tunnel portal and the stress of the support material occurred within the allowable values and were considered to ensure sufficient stability.