Abstract
Though the Grouting has been in use for a long time, it is still regarded as an technique rather than engineering. The study of ground improvement by grouting is rare especially in jointed rock mass. In this study, biaxial compression tests were performed in the jointed rock mass models with .ough surfBce joints assembled with blocks before and after grouting. The load-deformation curves of the jointed rock masses showed a non-linear relationship before grouting but showed a relatively linear deformaion behavior after grouting. Improvement ratio (deformation modulus after grouting/deformation modulus before grouting) decreased with increasing joint spacing and lateral stress. Improvement ratio decreased exponentially with increasing deformation modulus of the rock mass model before grouting. Three-dimensional FDM analysis was performed to a highway tunnel case using experimental data of grouted rock. The convergence of the tunnel predicted after grouting by the numerical modelling coincided with those attained from the field measurement.
주입공법은 터널 등 지하구조물의 보강법으로 적용사례가 증가하고 있으나, 그 효과의 공학적 평가에 관한 연구는 매우 부족한 실정이며, 특히 절리를 포함한 불연속암반의 주입재에 의한 역학적 특성변화에 대한 연구는 거의 이루어지지 않고 있는 형편이다. 따라서 본 연구에서는 주입에 의한 불연속암반의 변형특성을 규명하기 위하여 절리군의 경사, 절리군의 간격을 달리한 절리암반모형을 제작한 후, 이에 대한 주입전후에 대한 이축압축시험을 실시하여 변형특성을 조사하였다. 또한 시멘트현탁액 주입공법이 적용된 고속도로터널에 대한 3차원 유한차분해석을 실시하여, 이를 현장계측자료와 비교함으로써 해석의 타당성을 검토하였다. 주입후 절리 암반모형에 대한 이축압축시험결과, 절리암반의 하중-변형곡선은 주입전의 비선형에서 선형적으로 변하였으며, 변형계수도 증가하는 것으로 나타났다. 절리간격과 최소주응력이 커짐에 따라 주입전 변형계수에 대한 주입후 변형계수의 비가 지수함수적으로 감소하는 경향을 보였다. 주입전후의 이축압축시험결과로부터 주입전 암반의 변형계수와 주입후 암반의 변형계수의 관계를 지수함수로 표현한 경험식으로 제시하였다. 현지암반의 주입에의한 보강효과를 3차원 유한차분법을 이용하여 해석한 결과, 주입공법이 적용될 경우 터널의 천단과 측벽에서 발생되는 변위는 현저하게 감소하는 것으로 해석되었으며, 굴착이 진행됨에 따라 발생하는 변위의 양상이 현장 계측결과와 유사한 경향을 나타내었다.