Estimation of the Deformation Modulus for a Fault Zone using Crown Settlements Measured During Tunnel Excavation |
Yun, Hyun-Seok
(Department of Earth and Environmental Sciences, Chungbuk National University)
Moon, Seong-Woo (Department of Earth and Environmental Sciences, Chungbuk National University) Song, Gyu-Jin (Department of Earth and Environmental Sciences, Chungbuk National University) Seo, Yong-Seok (Department of Earth and Environmental Sciences, Chungbuk National University) Kim, Ji-Soo (Department of Earth and Environmental Sciences, Chungbuk National University) Woo, Sang-Baik (Pyonghwa Geotec Co. Ltd.) |
1 | Serafim, J. L. and Pereira, J. P. 1983, Consideration of the Geomechanical Classification of Bieniawski, Proceedings of International Symposium on Engineering Geology in Underground Construction, Laboratory National Engineering Civil, Lisbon, Portugal, 1(2), 33-44. |
2 | Son, M. R., Li, S. D., and Lee, W. K., 2011, Estimation of Elastic Modulus in Rock Mass for Assessing Displacment in Rock Tunnel, The Journal of Korean Society of Civil Engineers, 31(2-C), 83-92. (In Korean with English abstract) 과학기술학회마을 |
3 | Aydan, O., Ulusay, R., and Kawamoto, T., 1997, Assessment of Rock Mass Strength for Underground Excavations, International Journal of Rock Mechanics and Mining Sciences, 34(3-4), 18.e1-18.e17 |
4 | Chi, J. M., Yoon, S., and Lee, C. J., 1989, Geological Report of the Munmak Sheet, Korea Institute of Energy and Resources, 2-14. (In Korean) |
5 | Jang, B. A. and Kim. H. Y., 2003, Correlation between Weathering degree and RMR and modulus of deformation of Rock Mass, Conference of the Korean Society of Engineering Geology, 119-124. (In Korean) |
6 | Kim, C. Y., Bea, G. J., Moon, H. K., and Choi, Y. K., 1998, A study on the Tree Dimensional Finite Element Analysis for the Tunnel Reinforced by Umbrella Arch Method, The Jounal of Korean Society for Rock Mechanics, Tunnel and Underground, 8, 209-225. (In Korean with English abstract) |
7 | Kim, G. W., 1993, Recaluation of Geomechanics Classification of Rock Mass, Geotechnical Engineering and Tunneling Technology, Korean Geotechnical Society Spring '93 National Conference Seoul. Korea, 33-40. (In Korean with English abstract) |
8 | Kim, Y. J. and Lee, Y. J., 2013, Development of a back analysis program for reasonable derivation of tunnel design parameters, The Journal of Korean Tunnelling and Underground Space Association, 15(3), 357-373. (In Korean with English abstract) 과학기술학회마을 DOI ScienceOn |
9 | Lee, J. S., Bang, C. S., Choi, I. Y., and Um, J. H., 2000, A study on the Design Approach of the Pipe Roofing Reinforcement, The Journal of Korean Society of Civil Engineers , 20(3-C), 305-314. (In Korean with English abstract) 과학기술학회마을 |
10 | Mohammad, N., Reddish, D. J., and Stace, L. R., 1997, The Relation between In Situ and Laboratory Rock Properties used in Numerical Modelling (Technical Note), International Journal of Rock Mechanics Mining Science and Geomechanics. Abstract. 34(2), 289-297. DOI ScienceOn |
11 | Park, J. W., Park, E. G., and Kim, G. W., 2007, Determination of Deformation Modulus of Rock Mass with Measured Tunnel Displacement, The Journal of Engineering Geology, 17(4), 647-656. (In Korean with English abstract) 과학기술학회마을 |
12 | Bieniawski, Z. T., 1978, Determining Rock Mass Deformability : Experience from Case Histories, International Journal of Rock Mechanics, Mining Science and Geomechanics, 15, 237-247. DOI ScienceOn |