Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors - (표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 -)

  • Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.665-675
    • /
    • 2008
  • The objective of this paper is to provide an approximate cost estimating model for tunnel that can be utilized both in quick construction cost estimating for design alternatives, and in evaluating efficiently the cost effects according to the environmental changes during design and construction stage. To meet this requirement, this study analyzes critical cost factors influencing tunnel construction costs. The cost factors include 7 elements such as rock drilling method, advancing method, type of detonator, loader capacity, unit weight and soil volume change factor, length of tunnel. This paper investigates the cost variance according to the change of the cost factors. The result is expected to be used in formulating approximate tunnel cost estimating model.

Reliability Estimation of Site Investigation by Geotechnical Risk Analysis in Subway Tunnel (지하철 터널에서의 위험도 분석을 통한 지반조사 신뢰성 평가)

  • 김환준;김우성;김영근;이두화;박진우;김갑부
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2004.10a
    • /
    • pp.13-22
    • /
    • 2004
  • 본 연구에서는 도심지 지하철 터널을 대상으로 지반공학적 위험요소가 공사비 및 공기에 미치는 영향을 정량적으로 평가하기 위하여 잔여 리스크 개념을 이용하여 조사개소의 증가에 따른 공사비 및 공기의 신뢰도를 분석하였다. 신뢰도 분석결과, 지반조사 개소가 증가함에 따라 공사비 및 공기에 대한 위험도가 축소됨을 확인하였으며, 이러한 결과를 통하여 도심지 지하철 터널에서의 지반공학적 위험도 분석의 유용성을 확인하였다.

  • PDF

Development of Tunnel Construction Cost Model Using System Dynamics (시스템 다이내믹스를 이용한 터널공사비 모델 개발)

  • Park, Yong-Woo;Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.4
    • /
    • pp.468-475
    • /
    • 2012
  • Construction cost of tunnel is decided on construction area, site conditions, and construction methods. However, there is few research on developing models to estimate early construction costs. Therefore, this paper presents a model for early estimation tool for NATM tunnel using system thinking. The effect factors for tunnel construction cost were defined and the causal map is developed. Then empirical case analysis were performed to identify the cost difference due to tunnel length, excavation volume, and rock quality. The proposed model would be an alternative to estimate early construction cost of NATM tunnel.

A Standard Section-Based Approximate Cost Estimating Model on Tunnel (II) - Cost Variance Index Table and Test - (표준단면을 이용한 터널 공사비 예측모델 개발 (II) - 공사비 변동 모델 및 검증 -)

  • Cho, Jeongyeon;Kim, Sang-Kwi;Kim, Kyoungmin;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.677-684
    • /
    • 2008
  • The paper provides an approximate cost estimating model that can be used for tunnel. Based on the previous study analyzed critical factors that have impact on tunnel construction cost, this paper establishes a cost variance index table that reflects the cost impacts due to the change of the critical cost factors. An estimating procedure is described utilizing the index table. For the verification of the suggested model, the comparison of the estimated construction cost with real project cost is performed. The estimated results range from 95%~111% of the real project costs. As an approximate tunnel cost estimating model, the model can be utilized to quickly estimate tunnel construction costs based on the conceptual information at the planning stage and to efficiently make a decision on design alternatives.

Design of the Reinforced Concrete Lining in Bakun Diversion Tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1999.03a
    • /
    • pp.9-15
    • /
    • 1999
  • 말레이지아 보르네오섬 사라왁주의 바군 가배수로 터널(약칭 "바쿤터널")은 본 댐 공사를 수행하기 위한 배수 터널로 터널의 완공시기는 바쿤 수력발전사업의 중요한 요인이다. 터널의 라이닝작업은 터널공사의 완료 단계로 공사비와 공기 면에서 굴착 및 지보작업과 같이 중요한 단계이다. 바쿤터널은 내부 직경 12 m의 유사연장 3개의 터널로 이루어져 있으며 총길이는 4314.6 m 이다. 내공 단면은 배수시 마찰을 감소시키기 위하여 원형단면으로 설계되었다. (중략)계되었다. (중략)

  • PDF

Numerical simulation study on applicability of electrical resistivity survey at tunnel face (터널 굴착면에서의 전기비저항 탐사 적용성에 관한 수치해석 연구)

  • Yi, Myeong-Jong;Kim, Nag-Young;Lee, Sangrae;Hwang, Bumsik;Ha, Myung Jin;Kim, Ki-Seog;Cho, In-Ky;Lee, Kang-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.3
    • /
    • pp.279-292
    • /
    • 2022
  • Unexpected anomalies in the geotechnical investigation at design stage may cause problems during tunnel excavation. Therefore, it is important to predict the ground condition ahead of a tunnel face during tunnel excavation in order to prevent tunnel collapse. Despite the fulfillment of an electrical resistivity survey at the tunnel face, the existing electrical resistivity survey program can produce distorted results by the limitation of tunnel modelling. In this background, this study develops a modelling program for an electrical resistivity survey considering the tunnel shape. Numerical simulation and inverse calculation were performed for the electrical resistivity survey in the tunnel using the developed program. As a result, it was proved that the developed program could predict accurately the anomalous object's location and condition ahead of the tunnel face.

The Improvement of Tunnel Construction Cost Standards Considering the Site Conditions in Korea (현장실태를 고려한 국내 터널공사 공사비산정기준 개선)

  • Ahn, Bang-Ryul;Lee, Han-Soo;Oh, Jae-Hoon;Song, Tae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.26-35
    • /
    • 2020
  • Tunnel construction is an important part of Korean public construction projects. Although the development of various equipment and technologies has led to advances in tunnel construction methods that are implemented on sites, the cost standards related to such works do not yet reflect the realities of the construction sites. A literature review and site surveys were conducted to suggest reasonable cost standards for tunnel work that reflects the realities of the field. First, each item in the cost standards for tunnel work, as established in the Construction Standard Production Rates, were analyzed. The results were compared with the actual costs implemented on tunnel projects. The key items analyzed included those regarding the work cycle time, such as rock classification, profiling survey, drilling speed, and muck-disposal processing equipment combination, as well as the number of people put to tunneling work. Based on the site survey results, improved estimates regarding the cycle time per one tunnel drilling blast, drilling speed of the machine, muck disposal processing equipment combination, and the number of people put to tunneling work were suggested. This study suggests the cost standards that reflect the realities of tunneling sites. The results are expected to help ensure adequate costs for tunnel construction projects.

Applicability of the single shell tunnel in Korea from the economic evaluation (경제성 분석에 의한 싱글쉘 터널의 국내 적용성 검토 연구)

  • Kim, Hak-Joon;Shin, Hyu-Seong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.167-175
    • /
    • 2008
  • The construction cost for the single shell tunnel is cheaper than that of the double shell tunnel according to the case studies performed in several domestic and foreign tunnels. However, the economic advantage of single shell tunnel drops drastically as the condition of the rock mass deteriorates. Therefore, the single shell tunnelling method should be applied to the good rock mass conditions. The application of the single shell tunnelling method to tunnels in Korea should be determined considering the ratio between the good rock and poor rock masses along the tunnel section. The use of the single shell tunnel is expected to offend depending on the cheap supply of high quality shotcrets and rock bolts developed for single shell tunnels.

  • PDF

A study on construction simulation of road tunnel using Decision Aids for Tunneling (DAT) (터널의사결정체계 (DAT)를 이용한 도로터널의 시공 시뮬레이션 연구)

  • Min, Sangyoon;Kim, Taek Kon;Einstein, H.H.;Lee, Jun S.;Kim, Ho Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.161-174
    • /
    • 2003
  • Applicability of the Decision Aids for Tunneling (DAT) technique is investigated in this study to better understand the efficiency of the decision making process during tunnel construction. For this, a traffic tunnel under construction is adopted and information on the construction procedure, i.e., overall geology, unit cost and construction time for each excavation process, is provided periodically. Various scattergrams in which cost-time simulation results are plotted are obtained according to the simulation methods and final prediction on the construction time/cost is made. It is found that the uncertainty in the cost distribution is greater than the uncertainty in the time distribution for each cycle simulation and the uncertainties in time and cost for the one time simulations are comparable. Future work will be concentrated on the updating scheme using the face mapping data and various parametric studies will also be performed.

  • PDF