• Title/Summary/Keyword: 터널구조물

Search Result 716, Processing Time 0.028 seconds

Analysis of Response Change of Structure due to Tunnel Excavation Conditions in Sand Ground (모래지반에서 터널 굴착조건들을 반영한 상부 블록구조물의 거동변화 분석)

  • Son, Moorak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1541-1549
    • /
    • 2013
  • This study investigates the response of structures to tunnelling-induced ground movements in sand ground, varying tunnel excavation condition (tunnel depth and diameter), tunnel construction condition (ground loss), ground condition (loose sand and dense sand). Four-story block-bearing structures have been used because the structueres can easily be characterized of the extent of dmages with crack size and distribution. Numerical parametric studies have been used to investigae of the response of structures to varying tunnelling conditions. Numerical analysis has been conducted using Discrete Element Method (DEM) to have real cracks when the shear and tensile stress exceed the maximum shear and tensile strength. The results of structure responses from various parametric studies have been integrated to consider tunnel excavation condition, tunnel construction condition, and ground condition and provided as a relationship chart. Using the chart, the response of structures to tunnelling can easily be evaluated in practice in sand ground.

Characterization of deterioration of concrete lining in tunnel structures (터널 콘크리트 라이닝 구조물의 성능저하 특성)

  • Kim, Dong-Gyou;Jung, Ho-Seop;Bae, Gyu-Jin;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.4
    • /
    • pp.387-394
    • /
    • 2009
  • The objective of this study is to evaluate the durability and deterioration of concrete lining in the seven conventional tunnels. These tunnels were constructed about 40~70 years ago, and closed about 10~40 years ago. The field investigation and various laboratory testings were performed for this study. It was observed from the visual, examinations that the concrete linings of 7 tunnels were severely deteriorated, such as, cracks, leakages, desquamation, and exploitations. The compressive strengths obtained from rebound hardness method and uniaxial compressive strength test on core specimens largely differed depending on the locations in the tunnel. The maximum compressive strength of concrete lining was greater about 2 times than the minimum compressive strength of concrete lining in the same tunnel. The results of micro-structural analysis showed that the substances deteriorating the concrete lining, such as ettringite and thaumasite, were detected in the concrete lining of tunnel.

Mechanical behaviour of rib-reinforced precast tunnel liner according to variable rib-reinforcement shapes (프리캐스트 터널 Liner의 리브보강 형상변화에 따른 역학적 거동 특성)

  • Lee, Gyu-Phil;Lee, Seong-Won;Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.265-275
    • /
    • 2009
  • Due to the limitation of construction efficiency and structural safety, the application of the high covering and wide width tunnels was limited prior to the introduction of precast rut and cover tunnels. Therefore, a cut and cover tunnel structure with rib reinforcement is proposed to mechanically improve the safety on condition of high covering and wide width tunnel. Therefore, a technical problem that can provide a response similar to the actual filling conditions is analyzed by the finite element analyses, moreover, the mechanical behaviour of developed rib-reinforced precast tunnel liner through a large-sized model test will be investigated. The ultimate load of the developed rib-reinforced precast tunnel liner shows a 3% reduction compared to existing rib-reinforced precast tunnel liner, especially, the section of rib-reinforcement decreased to 55% compared to it of existing. Therefore, the stability of tunnel structure can be significantly improved through the developed rib-reinforced precast segment.

고속철도용 터널의 상시계측 시스템 구축에 관하여

  • 이준석;최일윤;문도영;이희현
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.3 no.2
    • /
    • pp.63-67
    • /
    • 2001
  • 최근 구조물의 안전과 관련하여 계측기술에 대한 관심이 고조되고 있으며, 시공중 계측 뿐 아니라 시공후 유지관리를 위한 구조물의 계측 사례가 증대되고 있다. 본 고에서는 영구계측을 위하여 고속철도용 터널에 적용된 유지관리 계측시스템을 소개함으로써 추후 터널의 유지관리 계측시스템을 구축하는데에 기초적인 자료를 제시하고자한다.

  • PDF

Damage Assessment of Adjacent Structures due to Tunnel Excavation in Urban Areas (II) - Focused on the Variations of Building Stiffness Ratio - (도심지 터널 굴착에 따른 인접구조물의 손상평가에 관한 연구 (II) - 지상 건물의 강성비 변화를 중심으로 -)

  • 김창용;배규진;문현구;박치현;오명렬
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.81-98
    • /
    • 1999
  • The influence of tunnelling on buildings has become an important issue in urban areas. The problem is an interactive one: not only do tunnelling settlements affect existing structures, but existing structures affect tunnel-induced soil movements. In order to examine the constraint of surface settlement and the degradation of building damage parameters, 3-dimensional elasto-plastic finite element analyses are peformed. Also, in this paper, the results of the parametric studies for the variations of the damage parameters due to the ground movements are presented by utilizing 2-dimensional elasto-plastic finite element models, totally 162 models. The width of a structure, its bending and axial stiffness, its position relative to the tunnel and the depth of tunnel are considered. The interaction is shown by reference to commonly-used building damage parameters, namely angular distortion, deflection ratio, maximum building settlements, maximum differential settlements and horizontal strain. By introducing relative stiffness parameters which combine the bending and axial stiffness of the structure with its width and stiffness of soil, design curves are established. These give a guide as to the likely modification of the greenfield settlement trough caused by a surface structure. They can be used to give initial estimates of likely building damage.

  • PDF

A study on the optimum range of reinforcement in tunneling adjacent to structures (구조물 근접 터널시공시 최적의 보강범위에 관한 연구)

  • Lee, Hong-Sung;Kim, Dae-Young;Chun, Byung-Sik;Jung, Hyuk-Sang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.199-211
    • /
    • 2009
  • Development of underground space is actively performed globally for better life in the surface, and the scale of the space is increasing. Extreme care should be taken in the construction of the underground space in urban areas in order to avoid damage of adjacent structures and interference with existing underground space. In case of shallow tunnels, reinforcement of ground and structures is necessary to minimize the damage to structures due to excavation but any standard for optimum range of the reinforcement has not been established yet. In this paper, a series of numerical analyses have been performed for a 20 m diameter tunnel excavated underneath a structure to investigate the degree of damage of the structure according to vertical and horizontal spacing between the tunnel and structure. In addition to that, optimum range of reinforcement is presented for each case where reinforcement is required. It has been observed that the reinforcement is necessary for the ground condition adapted in the analyses as follows: (1) if horizontal spacing ($S_{H}$) approaches to 0D (D: equivalent diameter of tunnel) for vertical spacing (Sv) of 0.5D, and (2) if tunnel exists underneath the structure for vertical spacing (Sv) of 0.75D. The reinforcement is not necessary for Sv of 10 regardless of $S_{H}$. It also has been obtained that the optimum ranges of the reinforcement around structure foundation are 7 m in depth and whole width of the structure and 5 m beyond tunnel sidewall. These reinforcememt ranges have been confirmed to be enough for stability of the structure if types of reinforcement method is appropriately selected.

Sensitivity analysis of design parameters influencing earth pressure acting on an arch-shaped cut and cover tunnel (아치형 복개 터널구조물에 발생하는 토압에 영향을 미치는 설계변수들에 대한 민감도 분석)

  • Bae, Gyu-Jin;Chung, Hyung-Sik;Lee, Gyu-Phil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.113-128
    • /
    • 2004
  • To investigate major influencing factors on earth pressure acting on an arch-shaped cut and cover tunnel, Monte Carlo simulation based quantitative sensitivity analysis was carried out for mechanical properties of ground as well as excavation configuration-related design factors. From the sensitivity analysis, it was intended that effects of earth pressures from different influencing factors on a cut and cover tunnel should be numerically identified. Output factors used in the sensitivity analysis such as vertical and horizontal earth pressures at different tunnel positions were obtained from the finite element analysis. In this study, it was revealed that depending upon positions where horizontal as well as vertical earth pressures were acting, they were differently influenced by the same input factors. In addition, earth pressures acting an cut and cover tunnel depended mainly on the embankment at crown and the inclination of cut slope.

  • PDF

Numerical analyses for mechanical behavior of cut-and-cover tunnel with precast arch type (프리캐스트 아치형 개착식 터널의 역학적 거동에 관한 수치해석)

  • Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.315-325
    • /
    • 2009
  • The thickness of the material can be thinned because arch cut-and-cover tunnel has the support mechanism by the axial force, and the ground reaction force due moderate deformation can be expected thereby making it be dynamically advantageous, therefore the arch cut-and-cover tunnel has become more widely used. An important characteristic of the arch cut-and-cover tunnel is that the thickness of the material can be thinned because precast arch type has the support mechanism by the axial force. However, there is a different stress state surrounding the structures between normally excavated tunnels and cut-and-cover tunnels, it should be considered at designing. Therefore, finite element method was carried out to examine the mechanical behavior of the precast arch cut-and-cover tunnel considering construction procedure.

Experimental study on the tunnel behavior induced by the excavation and the structure construction above existing tunnel (기존터널 상부지반 굴착 후 구조물 설치에 따른 터널거동에 관한 실험적 연구)

  • Cha, Seok-Kyu;Lee, Sangduk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.640-655
    • /
    • 2018
  • Recently, the construction of the urban area has been rapidly increasing, and the excavation work of the ground has been frequently performed at the upper part of the existing underground structures. Especially, when the structure is constructed after the excavation of the ground, the loading and unloading process in the ground under the excavation basement can affect the existing underground structures. Therefore, in order to maintain the stability of the existing underground structure due to the excavation of the ground, it is necessary to accurately grasp the influence of the excavation and the structure load in the adjoining part. In this study, the effect of the excavation of the ground and the new structure load on the existing tunnel was experimentally implemented and the influence of the adjacent construction on the existing tunnel was investigated. For this purpose a large testing model with 1/5 scale of the actual size was manufactured. The influence of ground excavation, width of the load due to new structure, and distance between centers of tunnel and of excavation on the existing tunnel was investigated. In this study, it was confirmed that the influence on the existing tunnel gets larger, as the excavation depth get deeper. At the same distance, it was confirmed that the tunnel displacement increased up to three times according to the increase of the building load width. That is, the load width influences the existing tunnel larger than the excavation depth. As the impact of the distance between centers of tunnel and of excavation, it was confirmed that tunnel crown displacement decreased by 48%. The result showed that a tunnel is located in the range of 1D (D: tunnel diameter) from the center of excavation, the effect of excavation is the largest.

A Study on the Improvement Plans of Maintenance Monitoring in Tunnel Structure (터널구조물 유지관리계측의 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.10-20
    • /
    • 2020
  • Purpose: Analyze the results of on-site inspection of the tunnel structure maintenance management monitoring and suggest improvement plans. Method: We investigate and analyze the problems of various items on maintenance monitoring of tunnel structure of 14 subway lines of Seoul subway in downtown area. Result: The maintenance monitoring items, measurement quantity and installation location are classified into open tunnel and excavation tunnel and improvement plans are suggested respectively. Various durability criteria of the measuring instruments were examined, and durability confirmation method suggested improvement measures such as approval, inspection, inspection and testing, calibration of monitoring sensors. Conclusion: Applying the improvement measures of the tunnel structure maintenance monitoring to the construction site will increase the efficiency of the maintenance monitoring and contribute to the development of construction monitoring technology.