• Title/Summary/Keyword: 터널건설

Search Result 1,049, Processing Time 0.026 seconds

The Temperature Distribution and the Smoke Flow Behaviour During Road Tunnel Fire (도로터널내 화재시 온도분포 및 연기 유동 분석 연구)

  • Choi, Tae-Hee;Yeun, Young-Pyo;Yun, Chul-Uk;Kim, Myung-Bae;Choi, Jun-Seok;Lee, Seung-Ho;Kim, Nag-Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.37-43
    • /
    • 2002
  • Recently, the construction of tunnels longer than one kilometer has increased rapidly. Considering characteristic of limiting structure of longer tunnel, if fires inside tunnel broke out because of vehicle incidents, the catastroph would have high possibility to take place due to toxic smoke and heat of fire. In case of highway tunnel, safety facilities which can cope with tunnel fire are installed in the tunnel but according to rapid increase of heavy good traffic, dangerous goods and enlargement of tunnel magnitude, the research has to carry out about heat fluxes and smoke behaviour during tunnel fire. Therefore, through full-sized fire experiment the paper analyzed temperature distribution, wind velocity, smoke behaviour during tunnel fire.

  • PDF

Standard Proposed for Fire Safety Evaluation of Railway Tunnels and Evaluation of Fire Temperature (철도터널내 화재시 내화성능 평가를 위한 기준 제안 및 화재 온도 평가)

  • Won, Jong-Pil;Choi, Min-Jung;Lee, Su-Jin;Lee, Sang-Woo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.3
    • /
    • pp.196-200
    • /
    • 2010
  • The number of railway tunnels has been increasing rapidly. Although fires in long railway tunnels are rare, the consequences can be devastating. Prior to this study, there were no adequate time-temperature curves for the fire safety assessment of Korean railway tunnels. We studied a standard foreign time-temperature curve for which the heat rate is based on the traffic and the types of vehicles. We then proposed a hydrocarbon curve as a fire design model for railway tunnels in Korea. We examined the implications of this proposed model on railway tunnel structures using numerical analysis.

Stability analysis of a tunnel above mined cavities (석탄 채굴공동 상부 터널의 안정성 분석)

  • Song, Won-Kyong;Chung, So-Keul;Han, Kong-Chang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.2
    • /
    • pp.135-141
    • /
    • 2002
  • This research has been conducted to investigate the influence of mined cavities on a tunnel to be constructed around a coal mine. The location and dimension of cavities were supposed by analysing synthetically geological structures and condition of coal beds as well as gangway map since there does not exist any map describing mined cavities. Detailed geological and geophygical survey have also been carried out for the purpose of understanding the geological structure and rock mass conditions. The two dimensional numerical analysis with FLAC has been performed on the geological sections reconstituted from the obtained information and the affects of mined cavities on the tunnel have been assessed.

  • PDF

Application of SFRC as a lining material in tunnels (터널라이닝 구조재로서 SFRC 적용에 관한 연구)

  • Yi, Sang-Keun;Kim, Dong-In;Jo, Gyu-Seung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.4
    • /
    • pp.25-34
    • /
    • 2001
  • As the topography of Korea consists of mountains at about seventy percent, there is necessarily an increasing demand for tunnel construction according to the expansion of the existing highway and construction of new highway. The concrete lining of tunnel portals has been designed with reinforced concrete to resist the cracking due to the difference in temperature in the inside and outside of tunnel. In the paper, the application of steel fiber reinforcement concrete was analyzed as the lining concrete at tunnel portals and through structure analysis and field model test the suitability of the steel fiber reinforcement concrete was assessed as the lining member of tunnel portal.

  • PDF

Effects of Earthquake on Tunnel Stability (지진이 터널 안정에 미치는 영향)

  • 박남서
    • Explosives and Blasting
    • /
    • v.14 no.2
    • /
    • pp.71-80
    • /
    • 1996
  • A series of nurmerical analysse for the earhtquake of Iran railway tunnles under construction by NATM(New Astrian Tunnelling Method) were careid out throuth a pseudo-dynamic analyses techique used in a FFM computer program, DWTAP(Daewoo Tunnel Analysis Program), and the results are described in the paper. The analyses were performErl for two case;one is for the primary supports and the other is for the rompletEd permanent roncrete lining. The horizontal and verical groW1d accelerations for the design were estimatEd as 0.34 g and 0.23 g, respectively based on the historical reismic rerords in the proj3et area and the empirical equations. The results show that the turmel would be safe W1der the anticipitOO earthquake motion with the permanent roncrete lining, but some minor cracks rnigt be developErl in the primary shotcrete lining without any significant structural damages.

  • PDF

Performance Verification and Reliability Test of Tunnel Shotcrete Stressmeter (터널 숏크리트 응력계의 성능검증과 신뢰성 시험 연구)

  • Kim, Yeong-Bae;Park, Yeong-Bae;Lee, Seong-Won;Lee, Kang-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.4
    • /
    • pp.113-126
    • /
    • 2024
  • Shotcrete lining is an important material for the stability of tunnels in NATM tunnels. However, stressmeters for stress measurements of shotcrete lining are installed in the field without performance verification because of a lack of research on methods, procedures, regulations, and reliability of measurement equipment. To solve this problem, all shotcrete stressmeters currently used in Korea were investigated. For each stressmeter, external inspection and structural and functional inspection were performed to identify defects and problems in devices. For this purpose, a shotcrete stressmeter performance test device capable of load loading in stages was developed and obtained KOLAS certification. Using the device, stressmeter performance tests were conducted. Structural problems of integrated- and cell-type shotcrete stressmeters were identified through concrete mold tests, and improvement plans and performance verification procedures were suggested. The results of this study are expected to contribute to the preparation of regulations for the performance verification of shotcrete stressmeters and the selection of measuring instruments in the field in the future.

Productivity Analysis of Tunnel Muck Hauling Operations (터널 버력처리 공정의 생산성 분석;경부고속철도 원효터널을 중심으로)

  • Hwang, Ho-Jung;Kang, Chan-Sung;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.827-831
    • /
    • 2007
  • For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of site. This study introduces the methodology to collect operation data of construction equipment and build the simulation model, then verifies the model with the operation data. In addition, this study identifies main factors to determine the cycle time of the muck hauling system and offers reasonable decision making data using the simulation based planning of construction equipment operation.

  • PDF

Study on the Induced Interaction between Groundwater and Surface Water due to the Tunnel Construction (터널 건설에 따른 인근 하천 영향 평가를 위한 연구)

  • 김태희;김영식;하규철;김구영;고동찬;양인제;홍순택
    • The Journal of Engineering Geology
    • /
    • v.14 no.1
    • /
    • pp.81-91
    • /
    • 2004
  • The objective of this study is the evaluation of the tunneling effect on the goundwater-surface water interaction. The designed tunnel line is laid beneath the Hapo-cheon, which runs throughout the study area. And, the pre-evaluation of the tunnel-influence on the Gapo-cheon is urgently needed. However, it is very difficult to find out the similar domestic and/or foreign cases. In this study, the numerical modeling technique was not considered because of the insufficient data. Instead of the numerical modeling, the measurement and analysis of the stream flow rates 5 different points were adopted to evaluate the influence of the tunnel construction on the Gapo-cheon. Based on the analysis of flow monitoring data, it can be concluded that 39% of flow rate in Gapo-cheon is contributed by the groundwater discharge, as baseflow and the construction of tunnel can seriously decrease the flow rate in Gapo-cheon.

Deep learning based crack detection from tunnel cement concrete lining (딥러닝 기반 터널 콘크리트 라이닝 균열 탐지)

  • Bae, Soohyeon;Ham, Sangwoo;Lee, Impyeong;Lee, Gyu-Phil;Kim, Donggyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.583-598
    • /
    • 2022
  • As human-based tunnel inspections are affected by the subjective judgment of the inspector, making continuous history management difficult. There is a lot of deep learning-based automatic crack detection research recently. However, the large public crack datasets used in most studies differ significantly from those in tunnels. Also, additional work is required to build sophisticated crack labels in current tunnel evaluation. Therefore, we present a method to improve crack detection performance by inputting existing datasets into a deep learning model. We evaluate and compare the performance of deep learning models trained by combining existing tunnel datasets, high-quality tunnel datasets, and public crack datasets. As a result, DeepLabv3+ with Cross-Entropy loss function performed best when trained on both public datasets, patchwise classification, and oversampled tunnel datasets. In the future, we expect to contribute to establishing a plan to efficiently utilize the tunnel image acquisition system's data for deep learning model learning.

Development of optimal cross-section design methods for bored utility tunnels: case study of overseas typical cross-sections and design criteria (터널식 공동구 최적단면 설계기술 개발: 해외 표준단면 사례 및 설계기준 분석)

  • Park, Kwang-Joon;Yun, Kyoung-Yeol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1073-1090
    • /
    • 2018
  • Since the domestic utility tunnels were built mainly in the development project of the new city, they are all in the form of cut-and-cover box tunnel. But, in the case of overseas construction of utility tunnels for existing urban areas, the bored tunnel types are mainly adopted. It is reasonable to install bored tunnels in a downtown area because it is difficult to block the roads or install bypass roads due to heavy traffic and civil complaints. In order to activate the utility tunnels in bored type, it is necessary to secure optimized cross-sectional design technology considering the optimal supplying capacity and mutual influencing factors (Thermal Interference, electrolytic corrosion, efficiency of the maintenance, etc.) of utilities (power cables, telecommunication cables, water pipes, etc.). The optimal cross-section design method for bored utility tunnels is ultimately to derive the optimal arrangement technique for the utilities. In order to develop the design methods, firstly, the cases of tunnel cross-section (Shield TBM, Conventional Tunneling) in overseas shall be investigated to analyze the characteristics of the installation of utilities in the section and installation of auxiliary facilities, It is necessary to sort out and analyze the criteria related to the inner cross-section design (arrangement) presented in the standards and guidelines.