• Title/Summary/Keyword: 클레로

Search Result 232, Processing Time 0.031 seconds

Planning and Scheduling using EOT Claim analysis (EOT 클레임 분석 기법을 활용한 공정관리)

  • Woo, Han Kil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.248-249
    • /
    • 2021
  • Planning and Scheduling in Korean has been developed from Bar Chart to CPM, integrated management and EVM were attempted. As growing of overseas projects, Scheduler was also recognized as important one. However, the reality is that most Korean construction projects still remain in the preparation of construction plan and construction schedule in 1990s. The global Planning and Scheduling trend is EOT claims. I would like to understand the global trend of EOT claims and EOT analysis, and to find out Planning and Scheduling measures to successfully promote EOT claims.

  • PDF

파력발전의 무진장한 자원

  • Re, Eo-Do
    • The Science & Technology
    • /
    • v.10 no.11 s.102
    • /
    • pp.42-43
    • /
    • 1977
  • 석유를 대신할 에너지 원은 원자력 ,태양열,지열 및 풍력등 여러가지를 생각할수 있으나 파력만큼 유망한 자원도 드물다. 바닷물결의 힘을 이용해서 발전력을 얻는 기술이 영국에서는 놀라울만큼 구체화 되어 있다.

  • PDF

건강레저 - 누구를 위하여 총성은 울리나!, 클레이사격

  • Lee, Il-Seop
    • 건강소식
    • /
    • v.34 no.6
    • /
    • pp.34-35
    • /
    • 2010
  • 산야를 가득 메우는 저 총성은 바로 당신을 위해 울리는 축포다. 우리가 클레이사격장을 찾는 이유는 움직이는 표적(Pidgeon)을 맞추는 재미가 자못 크기 때문이다. 산탄이 타깃에 적중할 때 터지는 쾌감이 그 어떤 사격보다 우수한 클레이사격의 매력을 살펴본다.

  • PDF

Datamodel for Productivity Management of Construction Project (건설공사 생산성 관리를 위한 데이터모델)

  • Ryu Han-Guk;Yu Jung-Ho;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2002
  • Construction delay claim occurs more often than any other claim. Delay claim impacts adversely the company's existence as well as the project's monetary problem. Because the calculation of the delay is not quantitative, owing not to have enough evidence, it is hard to solve evenly the delay claim. So, it is need to cumulate structurely the construction data or evidence during the construction. This study considers the established study about construction delay claim database and the problems and then presents the relation method between phase schedule and database. Finally, this study established the productivity claim database modeling for construction project through conceptual database modeling and logical database modeling based on information needed to make construction productivity database. So. the purpose of the study is to establish the datamodel for productivity management of construction project for calculating the delay days considering the lost productivity.

  • PDF

A Study on the Analysis of Change Order - Claim in Design-Build (설계시공 일괄입찰공사에서 설계변경 클레임요인의 분석에 관한 연구)

  • Lee, Sang-Beom;Hwang, Jae-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.301-304
    • /
    • 2006
  • The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful solutions in detail concerned with the main factor of Change Order-Claim by each D/B phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

News Topic Extraction based on Word Similarity (단어 유사도를 이용한 뉴스 토픽 추출)

  • Jin, Dongxu;Lee, Soowon
    • Journal of KIISE
    • /
    • v.44 no.11
    • /
    • pp.1138-1148
    • /
    • 2017
  • Topic extraction is a technology that automatically extracts a set of topics from a set of documents, and this has been a major research topic in the area of natural language processing. Representative topic extraction methods include Latent Dirichlet Allocation (LDA) and word clustering-based methods. However, there are problems with these methods, such as repeated topics and mixed topics. The problem of repeated topics is one in which a specific topic is extracted as several topics, while the problem of mixed topic is one in which several topics are mixed in a single extracted topic. To solve these problems, this study proposes a method to extract topics using an LDA that is robust against the problem of repeated topic, going through the steps of separating and merging the topics using the similarity between words to correct the extracted topics. As a result of the experiment, the proposed method showed better performance than the conventional LDA method.

Claim Management during Construction based on Key Claim Management Factors (클레임 핵심관리요인을 기반으로 한 건설공사 중의 클레임 관리)

  • Lee, Jun-Hyung;Lee, Hyun-Soo;Park, Moon-Seo;Kim, In-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.463-468
    • /
    • 2007
  • The disputes in construction projects are very important issue for stakeholders. However, many of presented claims have not received the compensation money required, and frequently turned down. The most cause is that the claims are not managed systemically on construction. Therefore, it is important to identify which management works are conducted on construction and how significantly do they relevant to construction claim. This research derives key claim management factors through analyzing causes for claim success and failure, and then presents management works relevant to them. This research also proposes the method for effective claim management and its expected effect through expert interview.

  • PDF

Efficient Geometric Model Reconstruction using Contour Lines (외곽선을 이용한 효율적인 기하모델 재구성 기법)

  • Jung Hoe Sang;Kwon Koo Joo;Shin Byeong-Seok
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.32 no.8
    • /
    • pp.418-425
    • /
    • 2005
  • 3D surface reconstruction is to make the original geometry of 3D objects from 2D geometric information. Barequet's algorithm is well known and most widely used in surface reconstruction. It tiles matched regions first, then triangulates clefts using dynamic programming. However it takes considerably long processing time while manipulating complex model. Our method tiles a simple region that does not have branches along minimally distant vertex pairs at once. When there are branches, our method divides contour lines into a simple region and clefts. We propose a fast and simple method that calculates medial axes using a minimum distance in cleft region. Experimental results show that our method can produce accurate models than the previous method within short time.

Effective Cutting Length and NAA Concentration for Water Cutting Propagation in Clematis (클레마티스 수삽번식 향상을 위한 삽수길이 및 NAA 농도)

  • Kil, Mi Jung;Yoo, Bong Sik;Kwon, Young Soon;Choi, Seong Youl
    • Journal of Bio-Environment Control
    • /
    • v.23 no.4
    • /
    • pp.288-292
    • /
    • 2014
  • This study was performed to investigate the possibility of water cutting by vegetative propagation method from July to August of Clematis. To find out proper cutting length and rooting growth regulator for water cuttings production, cutting lengths of C. 'Honora' made 1 node and 2 nodes length cutting, which were soaked in NAA $0.1mg{\cdot}L^{-1}$. Rooting rate of cuttings treated by NAA $0.1mg{\cdot}L^{-1}$ was 100% irrespective of root lengths, but that of 1 node and 2 nodes untreated by NAA $0.1mg{\cdot}L^{-1}$ were very low about 30% and 19% respectively. Number of roots and roots length were also highest in NAA $0.1mg{\cdot}L^{-1}$, effects of NAA $0.1mg{\cdot}L^{-1}$ treatment were greater at 1 node cutting. Based on the results, rooting rate for I node cutting of C. 'Pairu' according to NAA (0, 0.1, 0.5, $1.0mg{\cdot}L^{-1}$) concentrations was investigated. Days to rooting were 70-74 days (about 10 weeks), which was not significantly different among the NAA concentrations. Rooting rate increased by NAA concentration. it was about 90% usually and was improved with more than NAA $0.5mg{\cdot}L^{-1}$.

이사람-신무림제지 여성 BS/AS 담당 이진희

  • Jo, Gap-Jun
    • 프린팅코리아
    • /
    • s.39
    • /
    • pp.56-58
    • /
    • 2005
  • 전통 굴뚝산업인 제지업계에도 여성의 섬세함과 부드러움이 스며들고 있다. 제지업계에 여성파워를 한껏 발휘하고 있는 주인공은 2002년도 말에 신무림제지(주)에 입사, 올해 4년차에 접어든 마케팅팀 YES센터의 이진희(26세)씨. 이 씨는 여성으로는 보기 드물게 종이 반품.클레임 관련 BS/AS를 담당하고 있다.

  • PDF