• 제목/요약/키워드: 콘크리트 터널

검색결과 451건 처리시간 0.031초

터널 화재로 인한 콘크리트 세그먼트의 손상특성 규명 (Fire-induced damage on Shield TBM concrete segment)

  • 최순욱;장수호;이규필;배규진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.423-430
    • /
    • 2005
  • Fire accidents in underground space may bring much loss of lives as well as properties and result in catastrophic disasters. This study aimed to manufacture the high-temperature furnace capable of simulating fire scenarios (RABT and RWS) and carry out the preliminary fire tests to evaluate fire-induced damage in underground structures. Specimens used in the fire tests were the concrete segments generally used in shield TBM tunnels. The simulated fire scenario was set to the RABT curve that is the most representative fire scenario in underground space. From the fire tests, the spalling was estimated to reach approximately 20cm from the surface exposed to fire. In addition, from the observation of core specimens obtained after fire tests, the deteriorated zone of unspalled specimens amounted to approximately 10cm from the surface of spalling.

  • PDF

지하구조물 공용년수를 고려한 반발경도법에 의한 강도추정식의 제안 (A Study on the Proposal of Strength Presumption Equation of Concrete Using Rebound Test and Aging Effects of Underground Structures)

  • 나성옥;윤태국;이종우
    • 한국재난관리표준학회지
    • /
    • 제2권4호
    • /
    • pp.59-65
    • /
    • 2009
  • 현재 대부분 사용되고 있는 반발경도법을 이용한 강도 추정식을 서울의 대표적인 지하구조물에 적용할 경우 준공년도에 따른 재령계수의 적용이 부적합한 것으로 판단됨에 따라 본 연구에서는 최근 8년간 수행된 서울지하철 정밀안전진단결과를 이용하여 코어의 일축압축강도와 동일위치에서 실시된 반발경도 시험결과와의 상관관계에 준공년도를 고려하여 공용중인 박스 및 터널구조물에 대한 합리적인 강도평가 추정식을 제시하였다.

  • PDF

콘크리트 터널 라이닝 균열검사 시스템 개발에 관한 연구 (Development of Inspection System for Crack on the Lining of Concrete Tunnel)

  • 고봉수;손영갑;신동익;김병화;한창수
    • 제어로봇시스템학회논문지
    • /
    • 제10권1호
    • /
    • pp.66-72
    • /
    • 2004
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors, who observe cracks with their naked eyes and record them. But manual inspection is slow, and measured crack data is subjective. Therefore, this study proposes inspection system fur measuring cracks in tunnel lining and providing objective crack data to be used in safety assessment. The system consists of On-vehicle system and Laboratory system. On-Vehicle system acquires image data with line CCD camera on scanning along the tunnel lining. Laboratory system extracts crack information from the acquired image using image processing. Measured crack information is crack thickness, length and orientation. To improve accuracy of crack recognition, the geometric properties and patterns of cracks in concrete structure were applied to image processing. The proposed system was verified with experiments in both laboratory environment and field environment such as subway tunnel.

터널 콘크리트 라이닝의 구조적 특성평가를 위한 탄성파 기법, MiSA의 개발 (MiSA (Method of Integrated Spectral Analysis) to Evaluate Structural Integrity of Tunnel Concrete Lining)

  • 김기봉;추진호;조성호;조미라
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.49-56
    • /
    • 2001
  • The techniques to make assessment of the structural integrity of underground structures include Infrared thermagraphy, GPR using the reflection of the electromagnetic wave, ultrasonic test, seismic methods using the propagation of elastic wave, and etc These methods have pros and cons in the assessment of the structural integrity in the complex environment of the underground structure, so that a single method alone is not enough to evaluate parameters required for the assessment. In this study, a new seismic method was proposed to improve the existing methods and to provide an additional information like stiffness of concrete. The proposed method combines the advantages of the modified impact-echo test and the SASW method. To verify the validity of the proposed method, a large scale model of a tunnel concrete liner was built and the proposed method was applied to the center of the model and also to the corner of the model which has several distinct reflection boundaries.

  • PDF

NATM 터널 콘크리트라이닝 암반하중 산정방법 고찰 (A Study on the Rock Loads of NATM Tunnel Concrete Lining)

  • 천병식;박태수;신영완
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.89-96
    • /
    • 2001
  • A concrete lining of NATM tunnel is the final product of a process that involves planning and evaluation of user needs, geotechnical investigations, analysis of ground-lining interaction, construction, and observations and modifications during construction. The designer must consider the lining in context of the many function, construction, and geotechnical requirements. Also, the loss of supporting capacity of shotcrete lining due to poor rock qualities and shotcrete erosion must be considered. The values, shapes, and estimating methods of rock load and water pressure are very different with every designers. Estimating methods of rock loads used in the design of NATM tunnel concrete lining are investigated. Numerical analyses are done in various conditions. And the rock loads estimated from radial stress and plastic zone are compared respectively.

  • PDF

비젼센서를 이용한 콘크리트 터널 라이닝 균열검사 시스템의 개발 (Development of Vision-Based Inspection System for Detecting Crack on the Lining of Concrete Tunnel)

  • 고봉수;조남규
    • 한국정밀공학회지
    • /
    • 제20권12호
    • /
    • pp.96-104
    • /
    • 2003
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors who observe cracks with their eyes. A manual inspection is, however, slow and subjective. This paper, therefore, proposes vision-based inspection system for measuring cracks in the tunnel lining that inspects cracks fast and objective. The system is consisted of an on-vehicle system and a lab system. An on-vehicle system acquires image data with line CCD camera. A lab system extracts crack then inform their thickness, length and orientation by using image processing. To improve accuracy of crack recognition the geometric properties of a crack was applied to image processing. The proposed system were verified with experiments in both laboratory and field environment.

인공진동의 크기가 양생콘크리트의 강도와 물성에 미치는 영향 (Effects of Artificial Vibrations on Strength and Physical Properties of Curing Concrete)

  • 임한욱;정동호;이상은
    • 터널과지하공간
    • /
    • 제4권1호
    • /
    • pp.31-37
    • /
    • 1994
  • The effects of blasting and ground vibratons on curing concrete have not been well studied. As a results unrealistic and costly ground vibration constraints have been placed on blasting and piling when it occurs in the vicinity of curing concrete. To study the effects of ground vibrations, a shaking table was made to produce peak particle velocities in the nearly same frequency range as found in construction blasting. Concrete blocks of 33.3X27.7X16.2cm were molded and placed on the shaking table. Different sets of concrete blocks were subjected to peak vibrations of 0.25, 0.5, 1.0, 5.0 and 10cm/sec. The impulses were applied at two hour intervals for thirty seconds. Along with unvibrated concrete blocks, the vibrated concrete samples with 60.3mm in diameters were measured for elastic moduli, sonic velocity, tensile and uniaxial compressive strength. Test results showed that the vibrations in curing concrete generally have effects on the uniaxial compressive strength or physical properties of the concrete.

  • PDF

수로 압력터널의 콘크리트Lining 해석 (Analysis of the Concrete Lining for Water Pressure Tunnel)

  • 김승권;임정열;공천석;안주옥
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.27-33
    • /
    • 2001
  • Objective of this study is to investigate the structural behavior of the concrete lining in water pressure tunnel. In many cases, the concrete lining of water pressure tunnel has not considered as a major structure comparing to the other structures, resulting in use of conservative analysis and design. For the detailed analysis of concrete lining of water pressure tunnel, factors such as rock pressure and water pressure have to be considered. In this study, analysis of concrete lining was performed by using beam element method, shell element method and solid element method. Analysis results showed that the tensile stress at crown of concrete lining is greatly affected by the stability of concrete lining and the tensile stress for the concrete lining has to be evaluated for the section where maximum moment is occurred.

  • PDF

터널 콘크리트 구조물 균열에 에폭시 주입의 표준화에 대한 기초적 연구 (A basic study on the standardization of epoxy injection in cracks of tunnel concrete structures)

  • 백종명;장석재
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.1235-1240
    • /
    • 2005
  • In this status no inspection standard of quality in repair of present concrete structure has a problem to repair for simple experience. In this paper for this problem improvement, it made an analysis of relation to injection quantity of crack width, injection time of crack width, injection pressure of crack width, injection pressure and time, injection quantity of structural size, injection quantity of structural individual crack position, injection time about crack width. and structural thickness. The data gained in analysis result be judged that it will help in systematic quality control about concrete structural repair.

  • PDF

철근콘크리트 기둥 발파해체를 위한 방호재 특성에 대한 실험적 연구 (Experimental Study on the Characteristics of Protection Materials for Explosive Demolition of Reinforced Concrete Column)

  • 류창하;박용원;김양균
    • 터널과지하공간
    • /
    • 제6권3호
    • /
    • pp.260-266
    • /
    • 1996
  • Safety concern is one of the most important parameters in the design of explosive building demolition. Laboratory experiments were performed to investigate the failure behaviour of concrete columns and the effects of protection materials. Fourteen reinforced columns with two sizes were constructed and the effects of protection materials were tested for two kinds of materials: non woven fabrics and wire net. The results showed that control of gas effects is a key to the control of flying chips. It was recommended to use both wire net and non woven fabrics as primary and secondary protection materials. Such protection method was successfully applied to the explosive demolition of 16 and 17-strory apartment buildings.and the results of a simulation on a model tunneling workings using diesel equipments are introduced. In case of typical model of tunneling face, the gas concentration of human height is about one third of roof concentration and right side half of the tunnel shows better environment than left half. NOx concentration of workings can be estimated about 0.45ppm which is much lower than permissible level(5 ppm).

  • PDF