Requirement Analysis of the System Form for the Bridge Slab (교량 상판(바닥판) 콘크리트 타설용 시스템 거푸집 개발을 위한 요구조건 분석)

  • Kim, Taekoo;Lim, Jeeyoung;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.195-196
    • /
    • 2014
  • Unlike general construction works, bridge construction is mostly done in a high place. The conventional deck form of bridge is installed between precast concrete girders using sleepers, bridging joints and plywoods, and after concrete is poured to the deck, the form materials are removed at high altitudes. When removing the form, it may be dropped on ground, damaging the materials and resulting in economic loss. In addition, safety accidents are likely as the works are performed in a high place, and as the manpower increases, the cost increases. Also, it is difficult to install and remove temporary equipment. Therefore, it is required to develop a system form that allows easier and quicker installation and removal by unskilled workers and ensures safety of workers. In this regard, the study is intended to analyze requirements for the system form for pouring concrete to bridge decks, which can be easily installed and removed. The study result will be used as basic information for development of the system form for pouring concrete to bridge decks.

  • PDF

A Study on Behavior Characteristics of Segmental Retaining Wall (조립식 블럭 옹벽의 거동특성에 관한 연구)

  • Lee, Jundae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.4
    • /
    • pp.15-21
    • /
    • 2008
  • From the practical point of view, general retaining wall systems, such as gravity wall, cantilever wall and reinforced wall, have several problems. As a countermeasure, precast block type retaining wall systems have been developed and used for the various purposes of construction. The retaining wall systems can be applied not only for mechanical purpose but environmentally friendly aspects by changing the shapes of surface plates and planting on the surface plates. On the other hand, the bulging failure was dominant near the center of wall height. Therefore, an individual block has to be estimated for the stability problem related to turnover and the for design of gravity block type wall. On the basis of this result, the optimum section of the wall has to be determined.

  • PDF

The Pullout Behavior of a Large-diameter Batter ]Reaction Piles During Static Pile Load Test for a Large Diameter Socketed Pipe Pile (대구경 말뚝의 정재하시험시 대구경 경사반력말뚝의 인발거동)

  • 김상옥;성인출;박성철;정창규;최용규
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.1
    • /
    • pp.5-16
    • /
    • 2002
  • The pullout behavior of large-diameter steel pipe piles(diameter = 2,500mm, length = 38~40m), which were designed as compression piles but used as reaction piles during a static compression load test on a pile(diameter = 1,000m, length = 40m), was investigated. The steel pipe piles were driven by 20m into a marine deposit and weathered soil layer and then socketed by 10m into underlying weathered and soft rock layers. The sockets and pipe were filled with reinforced concrete. The steel pipe and concrete in the steel pipe zone and concrete and rebars in the socketed zone were fully instrumented to measure strains in each zone. The pullout deformations of the reaction pile heads were measured by LVDTs. Over the course of the study, a maximum uplift deformation of 7mm was measured in the heads of reaction piles when loaded to 10MN, and 1mm of residual uplift deflection was measured. In the reaction piles, about 83% and about 12% of the applied pullout loads were transferred in the weathered rock layer and in the soft rock layer, respectively. Also, at an uplift force of 10MN, shear stresses due to the uplift in the weathered rock layer md soft rock layer were developed as much as 125.3kPa and 61.8kPa, respectively. Thus, the weathered rock layer should be utilized as resisting layer in which frictional farce could be mobilized greatly.

Flexural Behavior of Hybrid Beam of Reduced Story Height (층고 절감을 위한 하이브리드 보의 휨 거동에 관한 실험적 연구)

  • Hong, Sung-Gul;Yang, Dong-Hyun;Jung, Jong-Hyun;Yim, Byung-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.19 no.5
    • /
    • pp.557-567
    • /
    • 2007
  • In underground parking lots of apartment housing, the story height is increased by $300{\sim}400mm$ because of various ducts for HVAC. In order to reduce this story height, this study proposed the 'hybrid beam', which is composed of PC beam with embedded steel beam and insitu concrete. The depth of the hybrid beam is reduced by 300 mm and then the steel beam is embedded over the length of reduced depth to compensate for the loss of strength. Then, we performed the large-scale structural tests on 9 specimens and investigated the flexural behavior of the specimens. The parameters of tests were the shape of steel beam section, the length of the reduced depth, the stage of construction, the effects of slab and shear connectors. The test results showed that the specimens, after the insitu concrete has cured, has the flexural capacity which exceeds the required design capacity regardless of other parameters. On the other hand, the specimens of construction stage do not have sufficient strength. Based on these results, it is thought that the proposed hybrid beam with reduced depth is applicable to the underground parking lots of apartment housing as long as the support is placed at construction stage.

Development and performance verification of induced drainage method for leakage treatment in existing underground structures (운영중인 지하구조물 누수처리를 위한 유도배수공법 개발 및 성능 검증)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.533-549
    • /
    • 2017
  • In this study, drainage systems were proposed to drain the leakage of groundwater in the existing underground concrete structures. The system consists of drainage board, wire mesh, fixed nail, and mortar with mineral. In order to increase constructability, the drainage board and wire mesh were attached on the surface of cement concrete using the air nailer and fixed nail. The mortar with 30% of blast furnace slag was sprayed on the drainage board and wire mesh using the spray mortar equipment. The field test construction was carried out in a conventional concrete lining tunnel and concrete retaining wall for performance verification of the drainage system in the field. There was no problem with performance degradation in the drainage system for three years after construction. The bond strength tests were performed on the sprayed mortar at 14 days and about 3 years after field test construction. In case of attaching the wire mesh on the drainage board, the bond strengths of the sprayed mortar were 1.04 MPa at 14 days and 1.46 MPa about 3 years. In case of the drainage board without the wire mesh, the bond strengths of the sprayed mortar were 1.13 MPa at 14 days and 0.89 MPa, less than 1 MPa of bond strength criteria, about 3 years.

A study on the slip-up speed of a shaft using heating slip form (히팅슬립폼을 적용한 수직구 구조물의 상승속도에 관한 연구)

  • Ko, Eomsik;Lee, Sanghun;Park, Jongpil;Zi, Goangseup;Kim, Changyong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.811-823
    • /
    • 2019
  • Slip form method is applied to many cases of a shaft these days because it is safer, more economical and faster than cast-in-place method. Slip-up height of the method is approximately 2.5 to 4.0 m/day. If the temperature of concrete is outside the range of 10 to 30℃, the effects of changes in strength or elastic characteristics are significant. Therefore, it is difficult for slip-up speed to be higher than 3 m/day during winter construction. In addition, concrete has heat caused by hydration, which causes temperature cracking of hardened concrete. Therefore, temperature control of concrete curing is necessary for the continuous slip-up of slip form. In this study, the rebound hardness, time of ultrasonic waves propagation, heat of hydration, and external temperature are measured by developing heating panels and test devices for the continuous slip-up. Based on this, heating slip form is manufactured; this was applied to "Kimpo sites" and "Sinwol sites". The compared slip-up speed samples were 1.9 m/day or 0.200 m/hr on average at Gimpo sites (08:00~17:30) and 2.0 m/day or 0.210 m/hr at Sinwol sites.

Lateral Behavior of Abutment Piles in Full Integral Bridge During 7 Days in Response to Hydration Heat and Drying Shrinkage (수화열과 건조수축에 의한 7일간의 완전 일체식 교량 교대 말뚝기초의 횡방향 거동)

  • ;;;;Thomas A. Bolte
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.127-149
    • /
    • 2003
  • The bridge tested was 3 spans 90m-long PSC beam concrete bridge with a stub-type abutment which had a skew of 60$^{\circ}$ about the axis of bridge. A cement concrete was placed at the superstructural slab of the bridge. Inclinometers and straingauges were installed at piles as well. During 7 days-curing of superstructural slab, the pile behavior in response to hydration heat and drying shrinkage of the slab was monitored. Then monitored values were compared with the horizontal movement obtained from the HACOM program and the calculated lateral behavior obtained from the nonlinear p-y curves of pile. As a result, lateral behavior of H-piles by the field measurement occurred due to the influence of hydration heat and drying shrinkage obtained during curing of superstructural concrete. The lateral displacements by hydration heat and drying shrinkage were 2.2mmand 1.4mm respectively. It was observed as well that the inflection point of lateral displacement of pile was shown at 1.3m down from footing base. It means that the horizontal movement of stub abutment did not behave as the fixed head condition of a pile but behave as a similar condition. The measured bending stress did not show the same behavior as the fixed head condition of pile but showed a similar condition. The increment of maximum bending stress obtained from the nonlinear p-y curves of pile was about 300(kgf/$\textrm{km}^2$) and was 2 times larger than measured values regardless of installation places of straingauges. Meanwhile, lateral load, maximum lateral displacement, maximum bending stress and maximum bending moment of pile showed a linear behavior as curing of superstructural concrete slab.

Shear Capacity of Precast Concrete Triple Ribs Slab (프리캐스트 콘크리트 트리플 리브 슬래브의 전단성능)

  • Hwang, Seung-Bum;Seo, Soo-Yeon;Lee, Kang-Cheol;Lee, Seok-Hyun
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.4
    • /
    • pp.489-496
    • /
    • 2016
  • Recently, a concern about hollow core precast concrete (PC) slab has been increased as a method to improve the construction ability by reducing the self weight of structures during the construction. Hollow core slab which is known as a typical PC slab in domestic construction of PC building has a problem to put shear reinforcements in the web of element during the production of element in the factory. With regard to this point, recently, tripple ribs slab (TRS) which can be said as a new type of half PC slab system was developed. In TRS, it is possible to place shear reinforcements in PC element during the production of the element in the factory. This paper presents the shear test result of TRS which was done by one point loading test under simple support condition. Test parameters are the presence of cast-in-place (CIP) concrete and the contribution of lattice bars. From the test, it was found that the TRS has sufficient shear capacity to resist the design load and its strength can be predicted by the code equations for general beam. It is recommended to ignore the strength of lattice bar in the calculation of shear strength during the construction since its contribution is too low to be considered when CIP is not casted.

Experimental Study on Properties of Temperature History Using Heating Sheet and Insulation Form at Low Temperature (발열시트 및 단열재를 사용한 거푸집 내부 콘크리트의 저온환경하 온도이력 특성에 관한 실험적 연구)

  • Choi, Si-Hyun;Lee, Han-Seung;Choi, Hyun-Kuk
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.4
    • /
    • pp.132-139
    • /
    • 2017
  • In this study, in order to prevent the frost damage of the concrete, the characteristics of the form using heating sheet utilizing the chemical reaction of quicklime and the insulation were evaluated through experiments at low temperature. In the case of form at $-10^{\circ}C$, the form with attached heating sheet showed a temperature history of more than $10^{\circ}C$ higher than that of wood form at the early of concreting due to heat of the quicklime in the heating sheet. In the case of the insulated form, the concrete was kept at a high temperature by preserving the hydration heat. When the heating sheet and the isopink(extruded polystyrene) were attached together on the form, the effect was the same as that of the vacuum insulation. The compressive strength of the form with vacuum insulation and form with isopink, heating sheet as measured about 5 MPa at age 3. The experimental in Mongolia, as with the pervious results, the form with the heating sheet and the insulation showed the highest temperature history over $25^{\circ}C$ for 48 hours. Therefore, it was confirmed that the heating sheet and insulation are attached to the form, which helps the concrete strength development at low temperature by heat generation and the insulation effect.

Evaluation of Flexural Behavior of Hollow Prestressed Concrete Pile for Continuous Pile Wall (주열식 벽체용 중공 프리스트레스트 콘크리트 파일의 휨거동 평가)

  • Lee, Young-Geun;Jang, Min-Jun;Yoon, Soon-Jong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.3
    • /
    • pp.20-27
    • /
    • 2014
  • In the construction site, various earth retaining systems are developed and applied to maintain stability of excavated area and structures. Among the methods, the underground continuous wall and the column-type diaphragm wall methods are especially used in construction site nearby buildings or roads. However, these methods have some disadvantages such as the difficulty of quality control and long curing time because these methods need to cast fresh concrete at the construction site. In addition, these methods are usually applied to the site for the temporary purpose. In this paper, we suggest precast hollow prestressed concrete pile for continuous pile wall system. To investigate the structural behavior of suggested pile, which is the main member of the suggested system, tests pertaining to the structural behavior and prestressing force applied in the pile are conducted. From the test results, it was found that the prestressing force measured is sufficient compared with the value obtained by the design equation and the cracking moment measured is 34% higher than the design value. In addition to the above, this precast hollow prestressed concrete pile has an additional safety margin that the maximum moment is 59.2% higher than the cracking moment which is one of the serviceability limits for the design of the system.