• Title/Summary/Keyword: 콘크리트충진강관

Search Result 6, Processing Time 0.038 seconds

Bond Behavior of Thin-Walled Rectangular Profiled Steel Sheet Concrete Short Columns (절곡된 단면을 갖는 얇은 판요소 콘크리트 충전 각형강관 기둥의 부착거동)

  • Yun, Hyun-Do;Park, Wan-Shin;Han, Byung-Chan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.1
    • /
    • pp.233-241
    • /
    • 2005
  • The paper is presented experimental study results on bond stress between profiled steel and concrete in Profiled SPC(Profiled Steel Plate Concrete) rectangular steel tubes through an experimental program in which 13 pull-out specimens were tested. Advantages and class of composite members and current problems of construction work are noted, past research of PSSC is described. An experimental study is described and evaluated. The bond capacity is interrelated with slip at the steel concrete interface. The factors influencing the mechanism of bond stress transfer were the cross section shape, length/diameter, diameter/thickness and environmental parameters (temperature, moisture). The results of experimental program indicated that the force transfer could be characterized into two regions The first region was governed by bond with no relative slip between the profiled steel and concrete. The second region occurs after the chemical debonding. Bond stress transfer in this region was governed by frictional resistance between profiled steel and concrete and cross section shapes. The important factors influencing the magnitude of frictional resistance are the profiled steel shapes, length/diameter and environmental parameters. (temperature, moisture)

An Experimental Study on the Axial Stiffness of the Concrete Filled Rectangular Steel Tube Columns (콘크리트충전 각형강관 기둥의 축강성에 관한 실험연구)

  • Cha, Hee-Youn;Song, Hyung-Soo;Min, Chang-Shik
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.145-148
    • /
    • 2008
  • AISC-LRFD, ACI 318 and Korean design specifications for concrete filled rectangular steel tube columns do not consider the increasing of axial stiffness such as the elastic modulus and the yield strength due to the confinement effect. AISC-LRFD and ACI 318, however, shows different basic philosophy and equations for computing the elastic modulus and the strength of CFT columns. Through this experimental study, nine rectangular CFT column specimens were made by varying thickness steel tube and concrete strength, the axial stiffness were compared. The comparison between the design specifications and the test results shows different values on the yield strength of the CFT columns. Even though, yield strength of the CFT columns are very similar between AISC-LRFD and Korean design specifications.

  • PDF

Seismic Performance Evaluation of SRC Column by Quasi-Static Test (준정적 실험에 의한 SRC 합성교각의 내진성능 평가)

  • Han, Jung-Hoon;Park, Chang-Kyu;Shim, Chang-Su;Chung, Young-Soo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.10 no.4 s.50
    • /
    • pp.85-94
    • /
    • 2006
  • In the design of bridge piers in seismic area, the ductility requirement is the most important factor. In order to enhance the seismic performance of RC columns, it is necessary to make the ductility of columns larger by covering RC columns with steel tubes or confining RC columns by arranging transverse reinforcements such as hoop ties closely. Using core steel composite columns is useful as one of the reinforcing RC columns. In this paper, quasi-static tests on concrete encased composite columns with single core steel or multiple steel elements were performed to investigate the seismic performance of the composite columns. Eight concrete-encased composite specimens were fabricated. The cross-sections of these specimens are composed of concrete-encased H-shaped structural steel columns and a concrete-encased circular tube with partial in-filled concrete. Test parameters were the amount of the transverse reinforcements, type and number of encased steel member. Through the tests, it was evaluated the ductility of SRC composite specimens. It has become clear from the test results that encased steel elements makes the deformation capacity of the columns to be larger. The displacement ductility and lateral strength of specimen with concrete-encased circular tube were indicated the biggest value.

Failure behavior analysis of a penetration type pile head stiffener (관통형 말뚝두부 보강의 파괴거동해석)

  • Park, Jun-Hwa;Moon, Keun-Ho;Lee, Gye-Hee
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.446-449
    • /
    • 2009
  • 본 연구에서는 강관말뚝과 기초와의 연결시 보강에 사용되는 관통형 말뚝두부보강에 대한 파괴거동을 파악하기 위한 구조해석을 수행하였다. 구조물의 관공부에 대한 해석에서 철근의 인장파괴시 발생하는 관통부의 응력을 검토하고 철근의 파괴형상과 실험에서 얻어진 철근의 파괴형상을 비교하였다. 대상구조물의 전체적인 파괴거동은 인장, 압축, 전단, 휨모멘트에 대하여 파괴가 발생할 때까지 변위를 증가시키고 이때 발생하는 반력과 구조물의 파괴거동을 파악하였다. 이 때 강재의 비선형 거동 및 충진콘크리트의 비선형및 균열거동이 고려되었다. 해석의 결과로 대상구조물의 파괴거동 및 극한하중 저항능력이 평가되었다.

  • PDF

Case Study on the Tunnel Collapse at the Shallow Depth (NATM터널 저토피 구간에서의 막장붕락 사례연구)

  • Baek Ki-Hyun;Roh Jong-Ryun;Kim Yong-Il;Cho Sang-Kook;Hwang Nag-Youn
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.102-110
    • /
    • 2005
  • ○ ○ tunnel that is located at Iksan - Jangsu freeway ○ ○, has collapsed during construction at the valley with shallow depth. Although, the site investigations, such as TSP, drilling exploration and so of indicated the presence of discontinuities in this section. The RMR was upgraded and the construction were carried out because that not only actual rock qualities were relatively good during construction but also the tunnel foe was stabilized. However, the tunnel was collapsed at the same time blasting of full face, and surface and underground water was infiltrated due to the settlement of the upper part of the tunnel face. To restore the collapsed section, 3-d tunnel stability analysis was performed and suitable reinforcement methods were chosen. The cavity of the upper tunnel face was stabilized by means of UAM and ALC injection. And the settlement was restored using L.W grouting method.

Advanced C.I.P Method to Use the Steel-Casing with Inner Joint (조인트 부착 강관 케이싱을 이용한 개량형 C.I.P 공법)

  • Jang, Seoyong;Choi, Jaesoon;Song, Byungwoong;Choi, Yoonyoung;Yoon, Joongsan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.2
    • /
    • pp.95-102
    • /
    • 2012
  • In this study, practical verifications for an advanced C.I.P(Cast in Place Pile) construction method were carried out. The structural characteristics of the method is to attach an angular joint in the steel-casing. This joint plays an important role in boring vertically, connected pile to pile, and protects the permeation of the ground water. For verifications, experimental research and numerical analysis were performed. In the experimental research, two model-tests were set up with the real scale steel-casing. One is to examine the leakage in the joint of piles and the other is to compare earth pressures in the front and the joint, respectively. In addition, 3 point bending test and compressive loading test were carried out and numerical analysis was performed to simulate the loading test. As a result of model-tests, the leakage in the pile joints was not shown up to 300 KPa of water pressure and stress concentration in the joint is out of the question. From the results of bending and compressive test, it was found that the new advanced C.I.P method is more convenient and superior than the conventional method.