A mean-absolute-deviation based method for optimizing skid sequence in shipyard subassembly

  • Lee, Kyung-Tae;Kwon, Yung-Keun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.12
    • /
    • pp.277-284
    • /
    • 2022
  • In this paper, we proposes a method of optimizing the processing order of skids to minimize the span time in a conveyor environment of the shipbuilding subassembly process. The subassembly process consists of a series of fixed tasks where the required work time is varied according to the skid type. The loading order of skids on a conveyor which determines the span time should be properly optimized and the problem size exponentially increases with the number of skids. In this regard, we propose a novel method called UniDev by defining a measure of the mean-absolute-deviation about the time difference among simultaneously processed tasks and iteratively improving it. Through simulations with various numbers of skids and processes, it was observed that our proposed method can efficiently reduce the overall work time compared with the multi-start and the 2-OPT methods.

Modeling and Simulation Analysis of the Setup Reduction Method in Automobile Painting Process (자동차 도장 공정의 셋업 감소 방법 모델링 및 시뮬레이션 분석)

  • Han, Yong-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.3
    • /
    • pp.147-154
    • /
    • 2009
  • In this study we investigate the problem of reducing color change cost at painting operations in an automobile assembly plant. Changing control logic at conveyor junction points prior to the top coat line has been proposed and analyzed using the discrete event simulation model we developed using AutoMod. We also discussed the project which initiated this research as well as the details of painting operations. Simulation analysis showed that the grouping ratio increases from 1.8 to 2.5 if the proposed control logic change is applied to the plant. Contrary to other approaches such as using dedicated equipment for resequencing, our approach has the merit of less investment cost, no need for additional space consumption. We finally note that the grouping ratio can be further increased if our algorithms is implemented as well as CRS (Color Rescheduling Storage) is installed.

Design of Conveyor Structure for Integrated Post-Process in Multi-Injection Molding Machine Environments (다중 사출설비 환경에서 후가공 공정의 통합운영을 위한 컨베이어 구조 설계에 관한 연구)

  • Kim, Ki Bum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.5
    • /
    • pp.22-27
    • /
    • 2020
  • In this paper, we study the methodology to improve productivity and transportation efficiency simultaneously in the manufacturing environment of injection plants which has multiple injection machines arranged in parallel. In general, the post-processes such as finishing are continuously arranged in the injection machine located in the lower level of the injection plants, and one or two workers in charge of post-processing are always arranged. Therefore injection plants have low productivity due to post-processing and the front of the injection machine is very crowded due to various logistics flows. In this paper, we propose the designing methodology of conveyor structure for integrating the post-processes arranged at each injection machine and transporting the injection products to the integrated post-process automatically. Specifically, we propose the models for computing the number of conveyor units into the integrated processes, and for finding the optimal combinations to connect each machines and the conveyors. The proposed model is for the total productivity improvement, which are productivity and transportation efficiency. By applying the proposed model to companies that produce injection parts used for the home appliances, we verify the applicability and the effect of improving productivity and transportation efficiency, which more than 40%.

A Simulation Study for Evaluation of Alternative Plans and Making the Upper-limit for Improvement in Productivity of Flow-shop with Considering a Work-wait Time (흐름생산 공정에서의 작업 대기시간을 고려한 공정 개선 상한선 도출 : H사의 공정 개선 계획안 시뮬레이션 사례를 중심으로)

  • Song, Young-Joo;Woo, Jong-Hun;Lee, Don-Kun;Shin, Jong-Gye
    • Journal of the Korea Society for Simulation
    • /
    • v.17 no.2
    • /
    • pp.63-74
    • /
    • 2008
  • The design of best efficient production process is common requirements of the production strategy department and the process planning department to maximize the revenue and accomplish target production volumes in the production periods. And they use several general methods for that-line-balancing, removing of the bottle-neck process, facility ramp-up, increasing of the worker's utilization, etc. But, those methods have depended on analytic, static and arithmetic calculations, yet. So, irregular work-waiting time causing the delay time isn't include in extracting production capacity, especially in the line production process. The work-waiting time is changed irregularly along the variation of each machine and very important for calculate real product lead-time and forecasting target production volumes. At this thesis, i'm going to mention the importance of the delay time of conveyor system which can be extracted by discrete-event simulation. And suggest it as a new main variable that must be considered at designing new production system. Then experimented and tested that's effects in the H-company case, conveyor based line production process.

  • PDF

Development of an Unmanned Conveyor Belt Recovery Skimmer for Floating Marine Debris and High Viscosity Oil (무인 컨베이어 벨트식 부유쓰레기 및 고점도유 회수장비 개발 연구)

  • Han, Sang-goo;Lee, Won-ju;Jang, Se-hyun;Choi, Jae-hyuk
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.23 no.2
    • /
    • pp.208-215
    • /
    • 2017
  • When persistent oil, such as crude oil or Bunker C oil, is spilled at sea, viscosity increases through the weathering process. Equipment that can collect this oil when mixed with floating marine debris is very limited. In this study, devices that can be attached to the outside of existing oil skimmers have been applied to the inside of the main body, to develop an unmanned conveyor belt type floating marine debris and high viscosity oil recovery skimmer, which is composed of a conveyor belt, a sweeper with a forced inflow device, and a collection tank equipped with a buoyant body. The resulting skimmer was operated at a speed of 1.2 knots at a distance of 30 m in a sea area test. It was stable when moving laterally in any direction. An oil recovery performance test was conducted using a portable storage tank, and oil was recovered from a minimum of $7.8k{\ell}/h$ to a maximum of $23.3k{\ell}/h$. Moreover, recovery of $7.7k{\ell}/h$ was obtained in a wave water tank test with floating marine debris such as PET bottles and oil mixed. If the equipment developed in this study was used in the field for oil pollution accidents, it could be expected to contribute to improved response capability. We believe our equipment could be used in further studies to improvement the performance of existing portable oil skimmers.

A lab-scale screw conveyor system for EPB shield TBM: system development and applicability assessment (토압식 쉴드 TBM 스크류 컨베이어 축소 모형 시험 장비: 장비 개발과 적용성 평가)

  • Suhyeong Lee;Hangseok Choi;Kibeom Kwon;Dongjoon Lee;Byeonghyun Hwang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.5
    • /
    • pp.533-549
    • /
    • 2024
  • Soil conditioning is a critical process when tunneling with an earth pressure balance (EPB) shield tunnel boring machine (TBM) to enhance performance. To determine the optimal additive injection conditions, it is important to understand the rheological properties of conditioned soil, which is typically assessed using a rheometer. However, a rheometer cannot simulate the actual process of muck discharge in a TBM. Therefore, in this study, a scaled-down model of an 8-meter-class EPB shield TBM chamber and screw conveyor, reduced by a factor of 1:20, was fabricated and its applicability was evaluated through laboratory experiments. A lab-scale model experiment was conducted on artificial sandy soil using foam and polymer as additives. The experimental results confirmed that screw torque was consistent with trends observed in previous laboratory pressurized vane shear test data, establishing a positive proportional relationship between screw torque and yield stress. The muck discharge efficiency according to foam injection ratio (FIR) showed similar values overall, but decreased slightly at 60% of FIR and when the polymer was added. In addition, the pressure distribution generated along the chamber and screw conveyor was assessed in a manner similar to the actual EPB TBM. This study demonstrates that the lab-scale screw conveyor model can be used to evaluate the shear properties and muck discharge efficiency.

효율적 인력물자 운반용 적.히화대의 개발 및 활용

  • 황춘수;장통일;임현교
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.05a
    • /
    • pp.313-316
    • /
    • 2002
  • 인력물자운반 중 들어올리기 작업은 순간적인 근력의 발휘를 필요로 하기 때문에 위험도 크고, 또한 관심도 높다 최근 군에서는 이와 같은 인력물자운반시의 안전사고의 발생을 감소시키고, 보다 효율적인 물자 운반을 위하여 지게차, 컨베이어 등의 도구가 활용되고 있다. 그러나, 경량물은 대부분 손으로 들어올리거나 내리는 실정이다.(중략)

  • PDF

Issue Reporter : 특별안전보건감독 결과 발표

  • 대한산업보건협회
    • 월간산업보건
    • /
    • s.370
    • /
    • pp.26-28
    • /
    • 2019
  • 고용노동부(장관 이재갑)는 지난해 12월 10일 한국서부발전(주) 태안발전소에서 20대 하청업체 비정규직 노동자(고(故) 김용균)의 컨베이어 협착 사망사고와 관련하여 태안발전소 사업장 전반에 대한 '특별안전보건감독'과 함께 유사 동종사고 예방을 위하여 발전 5사 본사 및 전국 12개 석탄발전소에 대한 '긴급안전점검'을 실시하고 그 결과를 발표하였다.

  • PDF

Study on Recycling of Refractory Materials from High-Temperature Melting Furnace by Color Sorting Technology (색상선별(色相選別) 기술(技術)을 이용(利用)한 고온(高溫) 용융노(熔融爐) 이화재(而火材) 재활용(再活用)에 관(關)한 연구(硏究))

  • Seo, Kang-Il;Lee, Deok-Hee;Choi, Woo-Zin;Jang, Jung-Hoon;Park, Eun-Kyu;Oh, Young-Gil
    • Resources Recycling
    • /
    • v.20 no.1
    • /
    • pp.28-36
    • /
    • 2011
  • More than 50% of refractory materials generated from high-temperature melting furnace was not carbonized and could be recycled by adopting proper separation process. In the present work, the separation of refractory materials has studied by adopting color sorting technology to promote the recycling of waste refractory. Purity of the refractory materials was obtained with at 97.2%, color temperature of sorter light source 6,500K, which gives less interference of surrounding light source. Purity and separation efficiency were improved as size is setting bigger and lower conveyer belt speed. It is revealed that optimum conditions were color temperature 6,500K, conveyer belt speed 1,000 mm/sec, particle size -20 mm, etc. To improve purity and separation efficiency on below 10mm size, the resolution of should be fixed camera and it narrow recognition range. As a result of the study, color sorting technology could be used for separation of waste refractory materials and will contribute to promote the waste recycling.

Reduction of the air consumption in the air conveyor with the air slit (공기 슬릿 구조를 이용한 공기 부상 컨베이어의 공기 소모량 감소)

  • 이학구;이대길
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.231-236
    • /
    • 2004
  • The area of flat glass panel displays such as LCD (Liquid crystal display) and PDP (Plasma display panel) has been increased more than 2 $\times$ 2 m$^2$ for productivity improvement. However, such a large panel area incurs large panel deflection during panel transfer using robots or AGV (Automated guided vehicle) systems. Therefore, electronic industries are making an effort to find an alternative transfer system for the large glass panels with small deflection. The air conveyor with porous pads is one plausible solution, but it becomes expensive because the large porous pads cost much and air consumption increases as the panel area increases. In this work, a simple air slit levitating conveyor was devised to lower the equipment cost and to reduce the air consumption of system. The air flow model between the LCD glass panel and conveyor was constructed and its validity was verified by experiments. To minimize the air consumption, the conveyor dimensions were optimized, and the air consumptions between the air conveyors with the air slit and that with the porous pad were compared.

  • PDF