The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall (커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안)

  • Jung Tae-Sik;Kim chang-duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.71-79
    • /
    • 2005
  • As construction projects have been extremely enormous, complex and special, risk factors have been increased consistently. Therefore, it is very important to identify and cope with the uncertain risk factors in such building constructions for successful project accomplishment. The purpose of this research is to approach practical affairs directly and show detail alternatives of risk factors by extracting the risk factors throughout construction process of curtain wall that is largely influenced on cost, quality, schedule ,safety and following activity. Also, extracting these risk factors make it possible to analyze quantitative risk and decide the priority raking of risk factors. Especially, this research is aimed to provide efficient management of scheduling risk that can make the risk minimize to practical workers who have different degree of knowledge and experience to the construction cite when the risk brings out suddenly.

Hybrid Prototype of Performance and Prescriptive Specifications in Curtain Wall Construction (커튼월 공사의 성능·사양 연계 시방서 프로토타입)

  • Lee, Jun-Ho;Cho, Dong-Hyun;Koo, Kyo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.433-442
    • /
    • 2014
  • The most design criteria and specifications in Korea utilized to ensure appropriate quality are based on process and prescriptive criteria determining materials, measure and methods. It has many problems including a loss of competitiveness resulting from inhibited creativity of the contractors. The performance-based specifications focused on final product are being proposed, but have difficulty in adapting to the architectural field. In this study the hybrid specification prototype for curtain wall construction was suggested. The specification framework was presented through analysis of linkage between the performance and prescriptive specification cases. Based on the survey with practitioners, the performance inspection process and the sample specification were developed by identifying the essential performance test timings. The applicability of the specification prototype was evaluated by interviews with experts. It was found that the prototype was active and a progressive supporting tool which could support to secure phased performance during construction as well as final performance.

A Study on the Economic and the Field Application Feasibility of Unit Curtain Wall Mullion Rail Lift System (유니트 커튼월 멀리온 레일 양중 시스템의 경제성 및 현장 적용 가능성에 관한 연구)

  • Jung, Ui-In;Kim, Hea-Na;Kim, Bong-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.1
    • /
    • pp.41-49
    • /
    • 2021
  • This study was to solve the lift problem of the existing unit curtain wall type by using the vertical material mullion as a rail in curtain wall, which is recently used as an external finishing material for high-rise buildings. It has been shown that the application of the curtain wall mullion's rail can be quantified even at 20m/sec wind speed through the Mock-Up test. Based on the sites selected for comparison of construction methods, it was analyzed that the construction period could be shortened by 48 days, or about 20 percent. It was analyzed that the number of construction workers could be reduced by about 33 percent from the previous nine to six. Based on these results, assuming the installation of curtain wall units of 10,000㎡, it is judged that construction cost can be reduced by 80% or more.

Assessing the Impact of RFID based materials tracking - Focusing on Curtain-Wall Work - (RFID 기반 물류 관리의 적용 효과 분석 - 커튼월 공사를 중심으로 -)

  • Yoon, Su-Won;Chin, Sang-Yoon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.24-35
    • /
    • 2012
  • RFID-based logistics is increasingly adopted in various areas of the construction industry as a technology that can improve effectiveness and efficiency of construction logistics. However, the technology is not widely adopted yet compared to the potential of RFID applications in the construction industry that the existing research has shown. Since the validation and verification of the benefit from RFID applications were biased toward the productivity of managers, more wide aspect of validation and verification is necessary. Therefore, the objective of this paper is to show how much impact the RFID-based logistics management system can have on resource leveling and allocation that have a direct impact on a construction project as well as the managers' productivity improvement that was shown by the existing research. This paper also discusses issues arisen during the test process.

Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction (초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF

Framework on Database Development based on Modular Simulation Model Implementation for Curtain Wall Operations in High-rise Buildings (초고층 커튼월공사 MSM 구성 및 데이터베이스 구축을 위한 프레임워크)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Tae-Hyung;Shin, Young-Keun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.301-302
    • /
    • 2012
  • Recently, high-rise building projects have been in the spotlight in South Korea. Curtain wall construction, as one of important operations in the high-rise building projects is composed of various, entangled and complex unit processes that require a systematic planning to prevent unexpected delays. A schedule simulation technique has been used for deriving more efficient planning and accurate performance measurement. However, the simulation technique has difficulty in collecting actual data and in applying data fluctuations during construction. Thus, this paper suggests a concept model of Modular Simulation Model(MSM) that overcomes such limitations of traditional simulation technique based on curtain wall operations.

  • PDF

A Study on the Elastic Restoration Characteristics According to Environmental Resistance Condition of Structural Sealing Finishing Materials (구조용 실링마감재의 내환경 조건에 따른 탄성복원 특성 연구)

  • Jang, Pil-Sung;Kang, Dong-Won;Hong, Soon-Gu;Kim, Young-Geun;Kim, Sung-Rae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.6-12
    • /
    • 2018
  • Recently, The use of the curtain wall method is increasing in construction. The curtain wall construction is widely applied to the exterior wall of the building for shortening construction period and economical efficiency. However, the replacement of deterioration of the weather resistance and structural behavior of the sealing material connecting the curtain wall method and the glass frame is necessary for introduction of the stable curtain wall method and quality improvement in accordance with KS F 4910 standard. In this study, the elastic restoring force test was performed in the external environment. In this study, the deterioration of the sealant was evaluated for structural sealants. In Korea, studies on the variable displacement behavior of structural sealants are lacked. In this study, the reproduced results in laboratory conditions are compared with the deteriorating conditions exposed to the external environment, and they are reflected in the design of sealing materials in the future. According to the results of the study, it was confirmed that the existing structure sealant meets the quality standard of KS F 4910, but in the conditions performed in this study, adhesion failure of the specimen and cracking of the surface occurred. Especially, in the weather resistance test, it is necessary to evaluate the long-term durability performance of the structural sealant used in the curtain wall method by checking the insoluble state of all the test pieces. Therefore, in order to apply a conventional structural sealant to the site, it is necessary to introduce another durability performance evaluation.

Implementing Activity-based LCA Model for Carbon Dioxide Emission Analysis and Allocation of Environment Cost (세부 공정별 CO2 배출 분석 및 환경비용 원가배분을 위한 Activity-based LCA 모델의 도입 - 커튼월 공사를 중심으로 -)

  • Lim, Ji-Youn;Yi, June-Seong;Shin, Seung-Woo;Son, Jeong-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.78-88
    • /
    • 2012
  • As worldwide efforts to reduce global warming gases, the construction Industry is endeavoring to diminish carbon dioxides emissions. Especially, by introducing the LCA methodology to the industry, A variety of related studies to measure the emission of carbon dioxides have been conducted. However, when the conventional LCA methodology is applied to the construction projects, some limitations have been reported. To overcome the restrictions derived from the industry characteristics, this research suggested the Activity-based LCA model by applying the Activity-based Costing (ABC), which breaks down the whole life cycles into more detailed stages. By implementing the newly developed model, forecasting accuracy of $CO_2$ emission was elevated, and the critical control points on carbon dioxides were established. Through the case study of aluminium curtain-wall system, this research verified the usefulness of the Activity-based LCA.

법령과 고시 ① - '고무발포단열재' 공사용 자재 직접구매 품목 제외

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.306
    • /
    • pp.87-93
    • /
    • 2016
  • 중소기업청은 지난 해 12월 30일 '중소기업자간 경쟁제품 지정내역 및 공사용 자재 직접구매 대상품목'을 개정하고 올해 1월 1일부터 3년(2018.12.31)간 적용에 들어갔다. 개정된 공사용 자재 직접구매 대상품목 중 그동안 대한기계설비건설협회(회장 이상일)가 지정 제외를 위해 총력을 기울였던 고무발포단열재가 기존 공사용자재 직접구매 대상품목 중에서 유일하게 제외됐다. 새로 개정된 공사용 자재 직접구매 대상품목은 고무발포단열재, 애자, 공기살균기, 플라스틱포대 등 4개 품목이 빠지고 신규 지정을 신청한 12개 품목 중 8개(커튼, 차양, 볼라드, 잡석, 데이터 포트장치, 디지털영상 정보 안내시스템, 막구조물, 포설형 탄성 포장재)만 채택돼 총 127개 품목으로 확정됐다. 고무발포단열재가 공사용 자재 직접구매 대상품목에서 제외됨으로써 앞으로 기계설비건설업계의 매출 신장과 생산성 향상에 크게 기여할 것으로 기대되고 있다.

  • PDF

A Conceptual Model Study For J.I.T(Just In Time) Construction Managemaent On High-rise Building-Concerned On Resource Life Cycle Of Concrete Construction- (고층건축공사 적시생산을 위한 관리모델 사례 -콘크리트 자재의 Life Cycle을 중심으로-)

  • Song Young-Suk;Lim Hyung-Chul;Choi Yun-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.127-134
    • /
    • 2001
  • Effectiveness of Just in time managing system can be obtained by removing unexpected lead-time and maintaining consistency on the physical transportation of construction resource. Construction resource management is essential on checking on load data from production of shop to field, and it is based on building resource life cycle information. In this study, production, transportation, and assembly disciplines of concrete construction should real time communications exchanging information related to shop-field with each other, Establishing information support system is an important initial step for promoting active cooperations among these resource life cycle on data flow. To achieve this, on suitable using management point, we suggest a concrete construction control model.