A Study of the Regulations for Calculation of Acceleration Costs on Construction Work (건설공사 공기단축으로 인한 추가비용의 산정규정에 관한 연구)

  • Min, Byeong-UK;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.409-417
    • /
    • 2017
  • The study is concerned with doing research on the plan to prevent the dispute occurring between contract parties regarding the additional cost generated when the construction period is shortened during construction work. After the review of the claim cases and the judgment cases of the court regarding the additional cost caused by the shortened construction period, the representative problem is the incomplete regulations on calculating the additional cost. In the 1st stage of the results of the research on the problem, the procedure handling the additional cost is presented, and the process of planning and approving the shortening of the construction period is gone through in the stage of the procedure to prevent the dispute on the additional cost between contract parties. In the 2nd stage, the plan on enacting and revising the regulations on removing the incomplete problems of the current regulations relating to the calculation of the additional cost. The basis for the advanced contract management is provided by resolving the incomplete problems of the current regulations relating to the shortening of the construction period with the prevention of a dispute and the resultant loss.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.

The estimation of the number of spare parts & the changing time about DSRC Road Side Equipment (단거리전용통신방식 노변기지국의 예비부품수 및 교체시기 산정)

  • Han, Dae-Hui;Lee, Cheong-Won
    • 한국ITS학회:학술대회논문집
    • /
    • v.2007 no.10
    • /
    • pp.196-201
    • /
    • 2007
  • 현재 국내 ITS는 현장장비 유지관리에 대한 연구 및 고장관련 DB가 부족하여 예비부품수 및 교체시기 산정에 대한 규정이 없는 실정이다. 이에 본 연구는 실제 고장이력자료를 갖고 신뢰성 분석을 실시하여 단거리전용통신(DSRC)방식 노변기지국(RSE)의 예비부품수 및 교체시기를 산정하였다. 전체 수집기간동안의 고장자료는 욕조곡선의 형상을 나타내어 우발고장기간의 자료로 신뢰성 분석을 실시하였으나 고장 수명 분포 중 적합되는 분포가 없었다. 따라서, i)장비가동률과 ii)경험적(empirical) 누적분포함수(CDF) 곡선을 이용한 장비의 고장률(건/일)을 감안하여 예비부품수를 산정한 결과 16.22개 이상의 노변기지국(완제품)을 확보하여야 하는 것으로 분석되었다. 하자보수기간(2년)이 지난후 일정기간($2{\sim}3$년)이 지난 시점에서 향후 10년간에 대하여 수리하면서 사용하는 경우와 신품구입시의 총비용을 비교하여 산정한 교체시기는 10.67건/40개월 이상이다. 본 연구 수행결과 첫째, 비모수적 방법으로 적합도 검정을 실시하지 못하였다는 한계와, 둘째, 초기에 고장이 많이 발생하는 장비는 향후에도 고장이 많이 발생한다는 가정에 기반하여 향후 10년의 운영비용을 분석하였으나 이러한 가정을 입증하지는 못하였다. 따라서, 향후엔 본 연구에 사용된 자료가 고장 수명분포도 적합 되지 않은 원인을 분석하는 것과 분석대상 기간 이후의 자료를 추가하여 적합도 검정 및 신뢰성 분석을 실시하는 것이 필요하다.

  • PDF

Development of a graphical user interface and a tool to determine the storage of a rainwater harvesting system using cost-benefit analysis (비용-편익 분석을 이용한 빗물이용시설의 저류 용량 결정 도구 및 사용자 편의 환경 개발)

  • Jin, Youngkyu;Seo, Hyowon;Kang, Taeuk;Lee, Sangho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.386-386
    • /
    • 2022
  • 우리나라에서는 '물의 재이용 촉진 및 지원에 관한 법률 시행규칙' 등 다양한 법률에 따라 특정 규모 이상의 시설에 빗물이용시설을 설치하도록 규정하고 있으며, 지자체에서는 빗물이용시설의 이용을 장려하고자 설치비 및 시설 운영비를 지원하고 있다. 현업에서 빗물이용시설의 설계는 간편식을 이용하여 목표 우수이용률 또는 공급보장률을 만족하는 용량으로 결정하고 있다. 또한, 산정된 빗물이용시설의 용량에 대해서만 경제성 분석을 하고 있으며, 경제성 분석에 포함된 수식에 대한 근거가 부족한 실정이다. 본 연구에서는 기 개발된 빗물이용시설 설계 프로그램인 CARAH(capacity design aid for rainwater harvesting)의 추가 기능으로 경제성 분석을 통한 빗물이용시설의 적정 용량 결정 도구 및 사용자 편의 환경 개발 결과를 제시하고자 한다. 본 연구를 통해 개발된 CARAH의 경제성 분석 도구는 빗물이용시설의 용량, 설치비, 유지보수비용, 지자체의 설치비 지원 및 빗물 이용에 따른 요금 감면액 등을 고려하여 빗물이용시설의 비용편익 비율(benefit cost ratio; BCR) 산정 결과를 제시하는 기능이다. 본 연구에서는 개발된 CARAH의 경제성 분석 도구를 이용하여 기 설치된 광교 신도시의 빗물저류조 5호를 대상으로 경제성 분석을 수행하였으며, 경제성을 고려한 적정 저류 용량을 제시하였다. 경제성 분석 기간은 빗물이용시설의 내용 연수인 30년으로 하였으며, 여러 목표 공급보장률에 따른 최소 저류 용량별 BCR 결과를 비교하여 광교 신도시의 빗물저류조 5호의 적정 저류 용량을 결정하였다. 그 결과, 공급보장률이 60%에 해당하는 저류 용량 341 m3의 BCR이 7.28로 가장 경제적인 빗물이용시설의 저류 용량으로 산정되었다.

  • PDF

Improvement of Compensation System in Construction Projects in Response to the Incurrence of Financial Costs (건설공사의 금융비용발생과 배상구조의 개선방안)

  • Lee Kyung-Kook;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.23-30
    • /
    • 2001
  • The Financial Cost in construction industry today is tend to increasing the burden of business management on account of lowered profit due to the mege-competition and decreasing investment of construction, multi-interfacing. system in it's attribute and various unreasonable governeing enactments. It is becoming the most important aspects for the management of construction business on how to preserve the profit from the various risks. The ultimate aims of this study is to pursue the contractual equity between the parties by establishing the fundamentals of framework for the compensation of Financial Charges through the review of the precedent studies and analysis of inquiries. As a result of the study, improvable measures for any practical inequality and/or institutional defects of current public contract system in recovering the Financial Cost incurred to Contractor are delivered as below; (1) $\lceil$Working Rules for Construction Industry Accounting Standards$\rfloor$ shall be amended and supplemented so as the incurred interest to be recognized as an operative cost by live return over the collection period. (2) The long-term phase contract system of which is enforcing contractor to bear the certain losses shall be diminished and/or abolished gradually. (3) The unreasonable legislations on compensation for financial cost in contract conditions shall be improved in response to practical circumstances. (4) The use of Critical-Path Method for Time Management shall be activated together with EVMS. (5) Independent application of Contract Enactments for construction industry shall be adopted.

  • PDF

A Modeling of Web-service for Construction CALS/EC Standard Guideline by using Component Based Development (컴포넌트 기반 개발방법론에 의한 건설 CALS/EC 표준지침 웹서비스의 모델링)

  • 이상호;정용환;김소운
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.78-83
    • /
    • 2003
  • 본 연구에서는 건설CALS/EC 기반의 정보화 추진을 위한 정보시스템을 개발할 때 적용되는 기존의 소프트웨어 개발방법론의 문제점을 분석하고, 표준화되지 않은 개발방법론의 적용으로 시스템 개발에 비효율적인 비용을 투자하는 문제점과 특성상 입찰, 구매, 계약 등 분야별로 상이한 기능의 업무에 따라 구축되는 건설산업 정보화에 있어서 상호간에 데이터 및 프로세스를 원활히 통합하지 못하므로 인하여 발생되는 개발의 중복성, 정보 활용의 비효율성 등의 문제점을 개선하고자 하였다. 이를 위하여 최근 새로이 부각되고 있는 방법론인 컴포넌트 기반 개발방법론(CBD: Component-Based Development)을 사용하여 건선CALS/EC 표준지침 웹서비스를 위한 시스템의 업무프로세스를 모델링하여 사용자가 쉽게 재사용가능하고 타업무분야에 확대 가능한 방향을 제시하였다. 본 연구를 위하여 기존의 소프트웨어 개발 방법론의 적용상 문제점 분석을 통하여 컴포넌트 기반 개발방법론의 필요성을 증명하고 비즈니스 컴포넌트 프레임워크를 사용하여 건설 CALS/EC 표준지침 웹서비스의 업무프로세스에 적용할 기술적인 방법론을 고찰하고 업무에 효과적으로 적용할 수 있는 업무프로세스 컴포넌트를 제시하였다. 본 연구에서 도출된 컴포넌트 모델은 향후 타업무분야의 시스템을 개발할 때 사용자요구분석 단계부터 별도의 재 작업이 없이 사용될 수 있으며 시스템을 구현할 때 개발 모듈의 중복방지와 용이한 비즈니스로직의 변경 등이 가능하며, 추가의 업무 프로세스나 연관된 다른 분야의 업무프로세스의 반영 및 추가 시 컴포넌트의 활동모델을 쉽게 수정하여 정의함으로써 쉽게 시스템의 기능을 확장할 수 있다.LE 산정에 관한 지속적인 실험적 연구가 이루어져야 하겠다. 증가할 것이다. 또한 부분육을 이용한 완전제품, 적색육제품, 유기농이나 별미식 제품과 같은 형태의 다양한 포장육 제품이 도입 될 것으로 생각되어진다.e in vitro SPF test method will be able to be used as an alternative method for in vivo SPF in case of lotion and cream. replica. A statistically significant improvement of Star Fruit Leaf Extract BG30-treated site was seen in decreased wrinkles. Star Fruit Leaf Extract BG30 results in clinically visible improvement in wrinkling when used topically for 5 weeks. 또한 관계마케팅, CRM 등의 이론적 배경이 되고 있는 신뢰와 결속의 중요성이 재확인하는 결과도 의의라고 할 수 있다. 그리고 신뢰는 양사 간의 상호관계에서 조성될 수 있는 특성을 가진 반면, 결속은 계약관계 초기단계에서 성문화하고 규정화 할 수 있는 변수의 성격이 강하다고 할 수가 있다. 본 연구는 복잡한 기업간 관계를 지나치게 협력적 측면에서만 규명했기 때문에 많은 측면을 간과할 가능성이 있다. 또한 방법론적으로 일방향의 시각만을 고려했고, 횡단적 조사를 통하고 국내의 한 서비스제공업체와 관련이 있는 컨텐츠 공급파트너만의 시각을 검증했기 때문에 해석에서 유의할 필요가 있다. 또한 타당성확보 노력을 기하였지만 측정도구

  • PDF

연금충당부채 및 연금비용 회계정보 공시에 관한 연구 : 사학연기금을 중심으로

  • Seong, Ju-Ho
    • Journal of Teachers' Pension
    • /
    • v.3
    • /
    • pp.69-105
    • /
    • 2018
  • 저출산과 고령화 이슈는 우리사회의 경제적 문제뿐만 아니라 공적연금의 재정지속가능성 여부와도 맞물려 있다. 실제로 우리나라 모든 공적연금은 사회보험역설(social insurance paradox)이 지속되기 힘든 새로운 도전에 직면하였다. 즉, 재정지속가능성은 제도 내적 연금개혁 혹은 제도 외적 재정지원이 없다면 항시적 수지불균형 상태가 누적될 것으로 예측된다. 이에 정부는 직접 고용과 관련된 공무원연금과 군인연금에 대해서만 연금충당부채를 산출하도록 규정하고 있다. 발생주의회계를 채택한 국제회계기준(종업원급여)을 참조하여 연금충당부채 산출을 위한 연금회계준칙(2011.8.3. 제정; 2011.1.1. 시행) 그리고 '연금회계 평가 및 공시 지침(2011.8.3. 고시 : 이하 편의상 연금회계지침이라 함)'을 신설하였다. 사학연금에 적용성 여부 논의에 앞서, 이들의 산출방법상의 문제점을 먼저 살펴보았다. 첫째, 공적연금은 공통적으로 세대 간 합의에 의해 운영되는 사회계약에 해당하므로 제도의 연속성을 전제로 한다. 하지만 연금회계준칙 및 지침은 제도의 청산을 전제로 현재 가입자(연금 미수령자, 연금 수령자)에 대해서 연금충당부채를 산출하는 폐쇄형측정(closed group valuation)을 채택하고 있다. 즉, 폐쇄형은 제도의 연속성 속성을 반영하고 있지 못하고 있어 기본 전제와 모순된다. 둘째, 공무원연금과 군인연금은 이미 기금 소진(최소한의 유동성기금만 보유함)이 되었고 정부의 보전금에 의해 수지 균형이 유지되는 순수부과방식 체계로 전환되었다. 따라서 연금충당부채는 해당 적립기금의 과소 여부를 판정하는 재정상태 기준 값에 해당하므로 기금소진이 진행된 현 상황에서는 산출의 목적, 필요성을 찾기가 힘들다. 부언하면, 제도 외적 재정지원(보전금)에 의한 수지균형방식이라면 발생주의회계보다는 현금주의회계가 회계의 목적적합성이 높다. 마지막으로 연금충당부채 산출에 있어 가장 민감한 할인율 설정 권한을 기재부장관에게 위임한 내용은 산출의 객관성, 일관성을 확보하기 힘들다고 판단된다. 이를 해소하기 위한 방안으로 본 연구에서는 5년마다 실시하고 있는 장기재정계산에서 예측된 명목 기금투자수익률을 연도별로 적용할 것을 권고하고 있다. 현행 정부회계기준을 사학연금제도에 그대로 적용하기에는 상당한 무리가 있다. 그 이유와 공시방안에 대해 살펴본다. 현재 사학연금은 기금소진 이슈로부터 상당부분 벗어나기 위해 2015년 연금개혁을 단행한 바가 있고 이를 통해 상당기간 부분적립방식 체계가 유지될 것이다. 물론 제도 외적 재정지원은 사학연금법 제53조의7에서 정부지원의 가능성만을 열어 놓은 상태이므로 미래기금소진의 가능성은 상존한다고 볼 수 있다. 먼 미래에는 순수부과방식 체계로 전환될 개연성이 높다. 이러한 재정의 양면성을 본 연구에서는 이중재정방식(dual financing system)이라고 한다. 이러한 속성을 고려하여 연금충당부채(연금채무라는 표현이 적합할 것으로 사료됨)를 산출하고 공시하여야 한다. 그 주요 연구 결과는 다음과 같이 요약된다. 먼저 현행 부분적립방식의 재정상태 검증을 위해 연금채무를 산정할 필요성이 있다. 이를 위해 본 연구에서는 기발생주의(예측단위방식 적용)에 근거한 폐쇄형 측정I(제도 종료를 전제로 현 가입자의 잠재연금채무(IPD) 산출에 초점을 둠) 그리고 미래발생주의(가입연령방식 적용)에 근거한 폐쇄형 측정II(추가적으로 현 가입자의 일정기간 급여 및 기여 발생 허용)을 제안하고 있다. 이를 통해 미적립채무의 규모 그리고 이를 해소하기 위한 상각부담률을 산출할 수 있다. 최종적으로 미래 가입자들까지 포함하고 기금소진 가능성까지 고려하는 개방형측정(open group valuation)을 다루고 있다. 단, 본 연구에서는 공무원연금처럼 기금부족분에 대해서 향후 정부보전금이 있다는 가정 하에 공시 방법을 제시하고 있다. 요약하면, 현행 사학연금제도는 현재와 미래의 재정 양면성을 모두 고려하여 연금채무 및 미적립채무를 공시하여야 한다. 부언하면, 현재 부분적립방식 재정상태를 반영하는 연금채무는 발생주의회계를 적용하고 미래에 도래할 순수부과방식 재정상태는 현금주의회계를 적용할 것을 최종 결론으로 도출하고 있다. 마지막으로 본 연구의 한계는 정부보전금의 가능성에 대한 법률적 해석과 병행하여 책임준비금 범위의 안정적 확대를 전제로 한 공시 논의 그리고 보전금의 책임한도 범위에 따른 공시 논의 등은 다루고 있지 않다는 점이다. 이러한 논의 사항은 향후 연구과제로 두고자 한다.