• Title/Summary/Keyword: 최적 교체주기

Search Result 53, Processing Time 0.028 seconds

A Research on the Determining Model of the Optimizing Maintenance Interval in TBM for the Preventive Maintenance of Facilities (설비예방보전을 위한 TBM의 최적보전주기 설정모델 연구)

  • Kwon Oh-Woon;Lee Hong-Chul
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.105-117
    • /
    • 2003
  • The purpose of this research aimed at performing the easy design. and also the easy on-the-job application or the maintenance interval determination methodology by presenting the determining model or the optimizing maintenance interval in TBM for the preventive maintenance or facility TBM(time-based maintenance) as the preventive maintenance requires the adequate determination or the maintenance interval. The maintenance interval or TBM shall be applied differently for the each interval such as He patrol inspection, maintenance, overhaul inspection. exchange. And it is based on the composition level of equipment. The already informed theories or interval determination methodology for the patrol inspection. repair. and overhaul inspection are difficult for adopting because or the several restriction problems in applying the maintenance schemes as the theory So, the model for determining the optimizing exchange interval or part, maintenance interval of auxiliary machine, unit equipment etc. was presented to apply in the maintenance easily and appropriately.

  • PDF

A Numerical Study on the Thermal Stimulation of Continuous Moxibustion (연속 뜸의 열 자극에 대한 수치해석)

  • Yang, So-Ra;Kang, Ho-Young;Jeon, Byoung-Jin;Choi, Hyoung-Gwon
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.35 no.9
    • /
    • pp.915-922
    • /
    • 2011
  • In this paper, the unsteady incompressible Navier-Stokes equation coupled with energy equation was solved in order to investigate the thermal stimulation of continuous moxibustion using a commercial code (ANSYS-Fluent). In the simulations, various periods were selected for the continuous moxibustion, which was done by burning multiple disks successively. It has been found that the depth of the effective stimulation zone increases only when the replacing temperature is equal or larger than body temperature whereas the increase rate of the effective stimulation depth decreases as the number of disc increases. Further, it has been shown that the optimal period, for which the duration time of the effective stimulation zone is maximum, exists.

집중 감시제어 설비의 신뢰성에 관한 연구

  • 이상복;박영택;장병태;장문섭
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2004.04a
    • /
    • pp.548-555
    • /
    • 2004
  • 현재 변전소의 감시 및 제어 설비로 활용되고 있는 집중감시제어반은 24시간 상시 운전상태로 운영되기 때문에 컴퓨터의 CPU 및 메인보드, 하드디스크 등의 노후화로 인해 개개의 특성 및 기능이 저하되고 있다. 도입된 지 10년 가까이 지난 집중감시제어반에 대한 효율적 교체가 불가피하게 되었다. 이에 대한 최적 교체주기에 대한 합리적인 결정을 하기 위해서 신뢰분포함수와 평균사용일수(MTTF)를 구하였다.

  • PDF

IRRAS를 사용한 최적 허용정지시간 및 점검주기 평가체계 개발

  • 양희창;정창현;제무성;신원기
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.455-460
    • /
    • 1996
  • 원자력발전소의 기기들에 대한 허용정지시간과 점검주기는 운영기술지침서(Technical Specification)에 명시되어 있는데 점검주기가 짧은 기기의 잦은 점검은 손상부품의 교체를 통하여 발전소의 불이용도를 감소시키는 효과가 있는 반면 점검원의 부담을 늘려 보수시 인적오류의 증가로 인한 불이용도 증가의 가능성이 있다. 본연구에서는 기기의 허용정지 시간과 점검주기를 변화시켜 계통의 불이강도를 IRRAS 5.0을 이용하여 허용정지시간과 점검주기의 변화가 계통의 불이용도에 미치는 영향을 분석하는 평가체계를 개발하고 영광 3,4호기 보조급수계통에 적용하였다.

  • PDF

Replacement Model Following the Expiration of NFRRW (비 재생무료교체-수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • The Korean Journal of Applied Statistics
    • /
    • v.23 no.6
    • /
    • pp.1147-1156
    • /
    • 2010
  • This paper proposes a replacement policy following the expiration of a non-renewing free replacement-repair Warranty(NFFRW). The non-renewing free replacement-repair warranty is defined and then the maintenance model following the expiration of the NFRRW is studied from the user's point of view. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. All maintenance costs of the system incurred after the expiration of the warranty are paid by the user. Given the cost structures during the life cycle of the system, we determine the optimal maintenance period following the expiration of a NFRRW. Finally, the numerical examples are presented for illustrative purposes.

A Study for Determining Optimal Economic Life of the Domestic Financial Information Systems Based on Data (데이터를 기반으로 한 국내 금융권 정보시스템의 최적 경제수명주기 모델에 대한 연구)

  • Park, Sungsik;Hahm, Yukun;Lee, Seojun
    • Informatization Policy
    • /
    • v.19 no.2
    • /
    • pp.85-105
    • /
    • 2012
  • So far, the importance of informatization, as well as investment into it, has been growing steadily. Due to the uncertainties and risks in adopting information technologies, systematic decision-making is definitely needed in investing in a large scale information system. Based on the existing theories about the economic life span of information systems and in consideration of the actual cost involved in the adoption and operation of the systems by the financial institutions in Korea, this study presents the optimal economic life span for all types of information systems in terms of the economic cost and generalizes the optimal life span. The ultimate purpose of this study is to develop a model that could be used in anticipating the timing of economic replacement of the information system of the same type and making decisions on IT investment.

  • PDF

Development of Performance Evaluation System for The Ex-Core Instrumentation Detector of Nuclear Power Plant (원전 노외 핵계측 검출기 성능진단 시스템 구현)

  • Goo, Choi-Yong;Gyu, Jung-Chang;Ki, Lee-Jae
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1678_1679
    • /
    • 2009
  • 원전에 설치되어 있는 노외 핵계측 검출기는 설계수명과 품질보증 수명의 차이가 크기 때문에 적절한 검출기 교체 프로그램의 수립이 어렵다. 따라서 본 논문에서는 노외 핵계측검출기에 대한 노화 진행정도 판단 및 최적 교체주기 수립을 위한 원전 노외 핵계측 검출기 성능진단 시스템 및 분석기술에 대해 고찰하였다.

  • PDF

Estimation of Fatigue Crack Growth using Gamma Process Model (감마과정 모델을 적용한 피로균열 진전거동의 예측)

  • Park, Sung Ho;Kim, Jae Hoon
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.38 no.11
    • /
    • pp.1245-1256
    • /
    • 2014
  • The physical nature of fatigue shows the considerable amount of scatter from intrinsic and extrinsic factors. In this study, some degradation models, such as the gamma process model, were reviewed in terms of uncertainties associated with the continuous, gradual, and monotonic nature of fatigue crack growth. Statistically varying fatigue crack growth data obtained from Lu and Meeker were used as an example to demonstrate the use of the gamma process model. This model can describe the condition and lifetime as statistical distribution curves whose shapes vary with cycles. From the skewness of the statistical distribution curves, it was confirmed that the median is suitable for being considered as the expected life. The use of the gamma process model enables the optimum replacement period and percentile life to be employed as criteria for preventive maintenance policy.

A Study on a Method for Composing a Portfolio for REITs Investment Using Markowitz's Portfolio Model (마코위츠 포트폴리오 모형을 사용한 리츠 투자 포트폴리오 구성방법에 관한 연구)

  • Lee, Chi-Joo;Lee, Ghang;Won, Jong-Sung;Ham, Sung-Ili
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.54-63
    • /
    • 2010
  • Domestic construction companies suffer from the difficulty in financing in the wake of economic slump at home and abroad. In the periods of this economic slump, which hit the nation REITs, the facilitator of fluid financing and the stimulating of construction economic, has increasingly been expanded since its introduction in 2001. But, REITs relatively falls behinds any other nations, in terms of its growth speed and marketing volume. The purpose of this research thesis is to suggest the method for composing a portfolio using Markowitz portfolio selection models for stimulating REITs. Main contents are as follows. First, the thesis made the comparative analysis on profit increase in REITs investment in application of models by Markowitz and REITs derivatives from 2007/07/03 to 2008/07/21 during investment analysis periods. The result showed that total profits by Markowitz model amounted to about 10 percent higher than average profits of REITs derivatives. Second, this thesis made the analysis on sensitivity of data-gathering and portfolio change periods of the existing profits, in order to measure the both periods and yield optimum profits. The six month data-collecting periods of profits accounted for some 16% higher profits than profits of REITs derivatives. In case when the two week periods of portfolio change accounted for some 11% higher profits than profits of REITs derivatives.

A Study on the Determination of Optimal Preventive Maintenance Periods using Simulation (시뮬레이션을 이용한 최적예방정비주기 결정에 관한 연구)

  • 윤익근;하종만;김호연;김동혁
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.590-597
    • /
    • 2002
  • LNG고압펌프계통은 천연가스 고압 송출에 있어 가용도가 매우 중요한 계통이다. 본 연구에서는 현재 적용되고 있는 예방(계획)정비주기를 가용성 측면에서 재검토했다. 확률적인 운전대수와 운전 및 보전 형태에 연관된 여러제약이 고려할 때 계통 불가용도를 정량화하기 위하여 시뮬레이션 기법을 적용했다. 중도 절단된 형태의 펌프 수명 데이터를 분석해 욕조형의 고장율 함수를 도출했으며 보수시간 데이터를 분석해 확률분포모수를 구했다. 또한 주요 펌프부대설비에 대해서는 상수형의 고장율과 보전율을 도출했다. 분석된 확률모수를 작성된 시뮬레이션 모형에 입력하고 과거의 운전대수 시나리오를 설정해 실험한 결과와 실제 보수 및 운전 자료를 비교해 모형의 유효성을 보였다. 그리고 차후 예상되는 운전요구대수 시나리오를 기정하고 각 예방정비주기별로 반복 실험하여 계통의 불가용도를 보이고 적합한 예방정비주기를 도출했으며 펌프부품 교체비용의 기대 절감액을 보였다.

  • PDF