• Title/Summary/Keyword: 최적화 프로세스

Search Result 340, Processing Time 0.028 seconds

Optimization of Polyphenol Extraction Process from Native Soybean using Ultrasound (자생 희귀콩인 납떼기콩으로부터 초음파를 이용한 폴리페놀 성분의 추출 공정 최적화)

  • Kang, Hye Jung;Park, Junseong
    • Journal of the Society of Cosmetic Scientists of Korea
    • /
    • v.48 no.3
    • /
    • pp.255-264
    • /
    • 2022
  • The active ingredients of Napttegi Kong(GML, Glycine max landrace), a type of native rare soybeans, were identified, and an ultrasonic extraction method was introduced as an eco-friendly extraction method. Through the component analysis of the Napttegi Kong extract, the epicatechin, which was not found in conventional soybeans, was identified. For effective extraction using ultrasonic, the main extraction conditions were optimized using the response surface analysis method. Through the Box-Behnken design process, 15 experiments were conducted with the extraction temperature, the ratio of extraction solvent/solution, and extraction time as key independent variables. A quadratic regression equation for the two dependent variables, epicatechin content and total isoflavone content, was derived, and the coefficients of determination were found to be high as R2 = 0.9939 and R2 = 0.9844, respectively, confirming that the correlation showed high significance. The extraction conditions satisfying the maximum expectations of these two dependent variables were predicted. to be 40.4℃ of extraction temperature, 19.3 times of extraction solvent/solution, and 91 sec of extraction time. The expected value and the actual experimental value of the epikatechin content and the total isoflavone content were similar, so it was confirmed that this experimental method is a highly reliable optimization model.

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF

A Study on the Introduction and Operation of Stage-Gate Process for Performance Management in National R&D Projects -Focused on the National Strategic Smart City Program- (국가연구개발사업의 성과 관리를 위한 Stage-Gate 프로세스 도입 및 운영에 관한 연구 -스마트시티 혁신성장동력 프로젝트 적용 사례를 중심으로-)

  • Lim, Se-Mi;Kim, Seong-Sig
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.226-232
    • /
    • 2020
  • The Stage-Gate is a market-oriented model that aims to launch new products on the market. Therefore, it can be appropriately introduced and applied to the operation and management of NSSCP, which is undergoing demonstration projects for Daegu and Siheung. In addition, smart cities have the characteristics of convergence and complex among various innovative technologies. When the Stage-Gate is introduced, the performance can be managed centering on the outcomes for each research institution. Therefore, the NSSCP is applying the Stage-Gate for the first time among national R&D projects to improve the quality of the research results and to demonstrate and commercialize them successfully. This paper reviews the operation results of the 1st and 2nd years when the State-Gate was introduced and analyzes the opinions of an R&D management agency, research institutes, and gate reviewers to present the supplementary and improvements for applying to the evaluation process for the next year. When operating the Stage-Gate by optimizing the situation for each project and being wary of inefficiencies caused by the rigid operation, it is expected that flexible evaluation for each outcome will be possible according to the convergence characteristics of smart cities.

A Performance and Change Management Based Method for Developing e-Government Enterprise Architecture (전자정부 엔터프라이즈 아키텍처 도입을 위한 성과 및 변화관리 기반의 개발 방법)

  • Seo, Kyeong-Seog;Ahn, Sang-Im;Chong, Ki-Won
    • The Journal of Society for e-Business Studies
    • /
    • v.11 no.4
    • /
    • pp.1-20
    • /
    • 2006
  • Many government offices have been proceeding a development of Enterprise Architecture(EA) according to apply Government-wide Enterprise Architecture'. Each office and working-level officials have had a hard time because of no guides related to a EA development method such as the Framework, Standards, Principle, Reference Model, Etc. This paper propose a method for developing e-Government Enterprise Architecture considered a characteristic of public institutes through analyzing existing cases. The method for development e-Government EA includes the EA Performance Management Model to monitor objectively each office's long-term business promotion because the e-Government EA development is a job of long duration and cooperation with many institutes. This method also combines the EA Change Management Activities for the officials to improve general knowledge about EA's idea and EA's value, etc. We show the EA case study of the Ministry of Government Administration and Home Affairs to demonstrate feasibility of our approach. As a result, public offices will carry out their BPR(Business Process Re-engineering) and ISP(Information Strategy Planning) more efficiently based on this EA development method.

  • PDF

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

A Design and Implementation of Mobile Logistics Information System (모바일 물류정보시스템 설계 및 구현)

  • Lee, Won-Joo;Lee, Sang-Jun;Lim, Heon-Yong;Kim, Chang-Hyeon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.7
    • /
    • pp.139-146
    • /
    • 2012
  • In this paper, we implement an m-LIS(Mobile-Logistics Information System) for an effective logistics management in consideration of logistics process and work environment. The m-LIS could perform the entire business process every minute and promote the work efficiency by tying up with ERP and POS system. Moreover, this system could enhance the management level of service and supply chain. Due to the reason that the existing logistics business was not computerized and automated, most of operation was accomplished by means of workers experience and convention. This problem brought about both the ineffective management and logistics quality deterioration by weakening the control power of the logistics site. In order to solve this problem, we put focus on providing the real-time operation monitoring environment on the spot, the satisfaction of the efficiency on the spot, and the optimized system by building up the logistics information system. Furthermore, we attest that the new logistics system could properly cope with the increase of the quantity of goods transported owing to stable logistics information support and the market expansion and growth caused by the firm interface between the new ERP and its related system.

An Empirical Study on the Effect of Market and Technology Orientation on the Innovation Performance of Global Firms (글로벌 기업의 시장지향성과 기술지향성이 기술혁신성과에 미치는 영향의 실증연구)

  • Hwang, Sang Don;Lee, Seong Hwan;Lee, Woon Seek
    • International Area Studies Review
    • /
    • v.22 no.4
    • /
    • pp.145-166
    • /
    • 2018
  • This study is due to global competition, the wall between regions is disappearing, customer needs are diversified, and market and technology are rapidly changing. Future growth engines, the importance of convergence capabilities for industrial competitiveness is being emphasized more. Therefore, companies should seek innovative means to increase the efficiency of the company by establishing optimized global management environment and establishing direction and strategy for utilization of convergence technology by improving industrial competitiveness. Firms must adopt and utilize related new technologies by strengthening their convergence capabilities through dynamic capabilities that are internal resource bases for new product development and process innovation. Globalize markets and technologies can expect higher innovation performance when aligning strategic direction with formalized technology competencies held by the firm and incorporating the convergence capabilities needed for technological innovation into processes. The study focuses on the effects of market and technology orientation on technological innovation performance, whether dynamic and convergence capabilities affect technological innovation performance, and dynamic and convergence capabilities to mediate between market and technology orientation. For the study, we surveyed 51.4% of global and multinational corporations that are internationally active or headquartered overseas. Based on the previous studies, hypotheses were established and the collected data were analyzed through utilization path analysis and Sobel test.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.

MPI-OpenMP Hybrid Parallelization for Multibody Peridynamic Simulations (다물체 페리다이나믹 해석을 위한 MPI-OpenMP 혼합 병렬화)

  • Lee, Seungwoo;Ha, Youn Doh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.3
    • /
    • pp.171-178
    • /
    • 2020
  • In this study, we develop MPI-OpenMP hybrid parallelization for multibody peridynamic simulations. Peridynamics is suitable for analyzing complicated dynamic fractures and various discontinuities. However, compared with a conventional finite element method, nonlocal interactions in peridynamics cost more time and memory. In multibody peridynamic analysis, the costs increase due to the additional interactions that occur when computing the nonlocal contact and ghost interlayer models between adjacent bodies. The costs become excessive when further refinement and smaller time steps are required in cases of high-velocity impact fracturing or similar instances. Thus, high computational efficiency and performance can be achieved by parallelization and optimization of multibody peridynamic simulations. The analytical code is developed using an Intel Fortran MPI compiler and OpenMP in NURION of the KISTI HPC center and parallelized through MPI-OpenMP hybrid parallelization. Further parallelization is conducted by hybridizing with OpenMP threads in each MPI process. We also try to minimize communication operations by model-based decomposition of MPI processes. The numerical results for the impact fracturing of multiple bodies show that the computing performance improves significantly with MPI-OpenMP hybrid parallelization.

Design of Collaborative Production & Supply Planning System based on ebXML (신발산업의 협업적 생산 및 공급계획시스템 설계)

  • Choi, Hyung-Rim;Hyun, Seung-Yong;Lim, Ho-Seob;Yoo, Dong-Yeol
    • Information Systems Review
    • /
    • v.8 no.1
    • /
    • pp.1-24
    • /
    • 2006
  • Now, the Korean footwear industry needs the concrete enhancement of its competitive edge for regaining of its previous well known reputation. For this purpose, this study emphasizes the cooperation between the members through the supply chain of Korean footwear industry, as a c-SCM(Collaborative Supply Chain Management) by aid of information system. The key issue will be how well to coordinate operations flow not only through internal process stages, but also through entire external supply chain stages. In other words, the target goal must be the system optimization through the entire supply chain beyond the local optimization of internal supply chain process. We, at first, analyze the traditional structure of supply chain in Korean footwear industry and find out critical problems, and then, we develop the collaborative information framework in conjunction with several collaborative process modules. The suggested collaborative production & supply planning system was designed for sharing information and it is based on ebXML(electronic business eXtensible Markup Language) framework. In this way, the enhancement of the efficiency and competitiveness can be expected through the synergy effect of coordination of information and material flow, the reduction of lead times, and production costs.