Method of Demand Forecasting for Demand Controller (최대수요전력 관리 장치의 최대수요전력 예측 방법에 관한 연구)

  • Kwon, Yong-Hun;Kim, Ho-Jin;Kong, In-Yeup
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2012.05a
    • /
    • pp.833-836
    • /
    • 2012
  • Demand Controller is a load control device that monitor the current power consumption and calculate the forecast power to not exceed the power set by consumer. Accurate demand forecasting is important because of controlling the load use the way that sound a warning and then blocking the load when if forecasted demand exceed the power set by consumer. When if consumer with fluctuating power consumption use the existing forecasting method, management of demand control has the disadvantage of not stable. In this paper, examine the existing forecasting method and the exponential smoothing method, and then propose the forecasting method using Kalman Filter algorithm.

  • PDF

A Study on the Temperature Adjusting Method of Maximum Demand of Electricity (최대전력수요의 기온보정방법 및 활용에 대한 연구)

  • Park, Jong-In;Kim, Kwang-In
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.616-617
    • /
    • 2011
  • 최대전력수요를 분석함에 있어 발생 당시의 기온 실적이 반영된 실적 최대전력만을 사용함으로 다양한 통계적 착시현상이 나타나고 있다. 평균적인 기상 상태에서의 최대전력수요를 측정하기 어려워 신뢰성있는 예측수요를 도출하기에도 많은 한계가 발생한다. 따라서 역사적 기온데이터에 기반한 정상적인 기온분포를 "표준기온분포"로 새롭게 정의하고, 이를 반영한 최대전력수요를 "기온보정 최대전력 수요"로 규정함으로써, 기존의 통계적 착시현상을 배제하고, 정확도 높은 최대전력 수요 예측치를 도출하여, 안정적 전력수급에 큰 기여가 있을 것으로 기대한다. 또한 본 연구에서는 기온보정 최대전력을 도출하기 위해 공적분 및 오차수정이론을 반영하여 모형화하였고, 엄격한 통계적 방법론을 이용하여 관련 모형을 검증하였다.

  • PDF

Technical Research of Peak Power Reduction (최대수요전력저감 기술연구)

  • Seo, Seokchan;Kwon, Kyoungmin;Choi, Jaeho
    • Proceedings of the KIPE Conference
    • /
    • 2013.07a
    • /
    • pp.9-11
    • /
    • 2013
  • 현재 국내/외에 걸쳐 전력의 사용량이 증가되는 가운데 집중적으로 부하전력이 사용되는 최대전력사용에 따른 문제가 대두되고 있다. 실제 이러한 최대전력에 의한 사고로 정전사태가 이러나는 사례가 속출하고 있으며, 이에 따라 정부에서는 최대전력을 저감하기 위한 노력이 다각적으로 진행되고 있다. 본 논문에서는 이러한 최대수요 전력을 억제하기 위한 최대수요전력저감 장치의 여러 운용모드를 제안하고, 이를 실증하여 시험함으로서 본 논문에서 제안 하고자 하는 운용모드와 제어 알고리즘의 타당성을 검증하였다.

  • PDF

An analysis on the Maximum Electric Load Outlook for Island Areas (도서지역 최대 전력수요 전망 분석)

  • Jung, Hyun-Woo;Seo, In-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.489-490
    • /
    • 2015
  • 본 논문은 도서지역 전력수요 특성을 분석하고, 전력수요와 관련 있는 인자들과의 상관성 분석을 통한 도서지역의 최대 전력수요 예측 방안을 제시하였다. 과거 선행연구와의 예측 결과 비교를 통하여 예측 방안의 우수성을 검증하였고, 이를 바탕으로 도서지역 최대 전력수요 전망을 분석하였다.

  • PDF

Development of Intelligent Demand Controller (지능형 최대수요전력관리장치의 개발)

  • 김병진;정을기;한운동;전희종
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.14 no.5
    • /
    • pp.50-55
    • /
    • 2000
  • In this paper, the intelligent demand control system was introduced. This system was composed of Intelligent demand controller, RTU(Remote Terminal Unit) and HMI(Human Machine Interface) program.The main features of developed system meter recommended by KEPCO. Secondly, the developed demand controller had a measurement function, so system could be simplified. Thirdly, network function was implemented to control a distanced loads. With program, the users who was not trained could operate system. Additionally, management based Web was considered to monitor and manage the system remotely. The system performance was proved in a several experiments.

  • PDF

Approximate Model for Peak Demand Power Computation in Metro Railway with DC Rectifiers (DC정류기를 갖는 도시철도의 최대수요전력 산출 근사모델)

  • Kim, Han-Su;Kwon, Oh-Kyu
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.5
    • /
    • pp.372-378
    • /
    • 2013
  • This paper presents an approximate model for computing the peak demand power in a metro railway system. The peak demand of substations can be calculated using the current vector iteration method. But the existing method requires many repeated calculations to determine the peak demand power, which makes it difficult to apply to the real-time peak power control problem. In this paper, we assume that none of the conditions vary except source impedance and make an approximate model for rapid calculation based on changes in the impedance of the power substation. The proposed model result is approximately the same as the existing model, which is demonstrated through simulation.

The Relationship between Daily Peak Load and Weather Conditions Using Stepwise Multiple Regression (Stepwise 다중회귀분석을 이용한 최대전력수요와 기상과의 상관관계 분석)

  • Cha, Jiwon;Lee, Donggun;Kim, Hyeonjin;Joo, Sung-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.475-476
    • /
    • 2015
  • 전력수요는 다양한 외부요인으로부터 영향을 받으므로 전력수요 예측 시 각 요인과의 상관관계를 고려할 필요가 있다. 본 논문은 Stepwise 다중회귀분석법을 이용한 일일 최대전력수요 예측 방법을 제시하였다. 사례연구에서는 2014년 평일 전력수요데이터를 이용하여 제안된 예측방법을 적용하고 그 결과를 평가하였다.

  • PDF

A Design of Demand Response Program in Consideration of Seasonal Peak Load (계절별 최대전력수요를 고려한 수요관리 프로그램 설계)

  • Lee, Jong-Uk;Wi, Young-Min;Lee, Jae-Hee;Joo, Sung-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.272-273
    • /
    • 2011
  • 본 논문에서는 하계와 동계 각 기간별 최대전력수요와 온도를 이용한 수요관리 프로그램 적용일와 적용시간을 추정하는 방법을 제안하였다. 사례연구에서는 국내 전력수요 데이터를 바탕으로 제안된 방법을 2011년~2012년에 적용하여 수요관리 적용일과 적용시간을 추정하였다.

  • PDF

Daily Peak Load Forecasting for Electricity Demand by Time series Models (시계열 모형을 이용한 일별 최대 전력 수요 예측 연구)

  • Lee, Jeong-Soon;Sohn, H.G.;Kim, S.
    • The Korean Journal of Applied Statistics
    • /
    • v.26 no.2
    • /
    • pp.349-360
    • /
    • 2013
  • Forecasting the daily peak load for electricity demand is an important issue for future power plants and power management. We first introduce several time series models to predict the peak load for electricity demand and then compare the performance of models under the RMSE(root mean squared error) and MAPE(mean absolute percentage error) criteria.

A Study on the Concentration of Generation in In-Chun area and the Effect of SVC Installation (인천지역 발전설비 집중 현상과 순동무효전력설비(SVC) 설치효과 분석)

  • Kim, H.P.;Lee, J.S.;Han, K.N.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.44-45
    • /
    • 2006
  • 투자에 비해 자본회수 기간이 길고 설비건설에 많은 자본과 장기간이 소요되는 전력산업은 미래의 전력수요 성장에 대한 정확한 예측과 합리적인 설비계획 수립을 통한 설비확충이 매우 중요하다. 우리나라는 지리적 특수성으로 인하여 독립된 형태의 전력계통으로 구성되어 있어 타 국가와 전력융통이 불가능해 자급자족을 위한 충분한 전력공급능력 확보가 필요하다. 전력수요는 서울 인천 경기도의 수도권에 43%(2005년 최대수요기준)가 집중되어 있고 발전소는 중 남부에 편재되어 있어 지역간 전력 수급불균형의 문제가 크다. 특히, 비수도권에서 유입되는 북상조류가 수도권 전력수요의 약 50%(2005년 최대수요기준)를 담당하고 있다. 또한 현재 수도권의 경우, 인천지역에 발전설비가 집중되어 있으며 이러한 인천지역 집중 현상은 수도권 발전설비 유인 정책에 따라 미래에 보다 더 가속화 될 것으로 예상되어, 또 다른 어려움을 야기 시키고 있다. 따라서 이러한 문제점에 대한 분석 및 대책을 검토하였다.

  • PDF