Preliminary Structural Form Planning for Suspension Bridge According to Force Flow (힘의 흐름을 따르는 현수교의 초기 구조형태계획)

  • Kim, Namhee;Koh, Hyun-Moo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1315-1326
    • /
    • 2013
  • Geometric form of a suspension bridge that uses load-sensitive cables takes on not only resisting loads but also becoming a visually sensible shillouette. This study has proposed a preliminary structural form planning for a suspension bridge following force flow by adopting the two possibilities of the graphic statics. First, the force polygon allows alternative load paths for the same loading condition. Second, a new structural form for the newly developed load path can be constructed using the reciprocal principle that exits between a structure space and the corresponding force polygon. Major structural form parameters that affect both structural and aesthetic aspecs are first identified. The relationships between structural forms and the corresponding force polygons are then investigated for the identified parameters. Upon the investigation, a stepwise process is developed for a preliminary structural form planning for a suspension bridge. The proposed structural form planning method is general that can be easily expanded to generate design alternatives of similar form-active structural systems. It is also expected that this method will be used as an educational tool to explain the interrelationships between structural forms and their force flows.

Reactive Scheduling and Control for Shipbuilding : DAS-REACT (조선의 일정계획 수정 및 통제 : DAS-REACT)

  • 이정승;이재규;최형림
    • Journal of Intelligence and Information Systems
    • /
    • v.2 no.1
    • /
    • pp.59-73
    • /
    • 1996
  • 전체적인 조선 생산일정계획을 수립하기 위해서 계층적 구조를 채택하였다. 이 구조에 의하면 도크의 상위 일정계획 생성기는 탑재 일정계획을 생성하고, 조립공정의 하위 일정계획 생성기는 상위 일정계획 생성기가 요구하는 범위 내에서 각각 세부적인 조립 일정계획을 세우게 된다. 그런데 하위 일정계획 생성기가 아무리 노력하여도 상위 일정계획 생성기로부터의 제약조건을 만족시킬 수 없는 상황이 발생하면, 일정계획 수정기에 통보하여 초기 탑재 일정계획을 수정해야 한다. 하위 일정계획 생성기로부터의 조정요청을 반영하기 위해서 부분 수정을 통해 충격을 최소화시키는 일련의 휴리스틱으로 구성된 알고리즘을 제시하였다. 각각의 휴리스틱은 여유시간 제거, 버퍼 제거, 작업시간 축소, 다단계 여유시간 제거, 과부하 자원 공유블럭 조정, 자원 제약조건 완화 등이고, 흡수되지 않은 일부의 충격은 주변으로 전파된다. 이와같은 방법론을 대우조선의 상황에 적용하여, 조선일정계획 수정 시스템인 DAS-REACT를 개발하였다.

  • PDF

Case studies in software development projects apply EVM(Earned Value Management) (소프트웨어개발 프로젝트에서의 획득가치관리(EVM: Earned Value Management) 적용 사례 연구)

  • Jun, Sung-Chul;Kim, Ja-Hee
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.260-265
    • /
    • 2008
  • 소프트웨어 개발 프로젝트 초기단계에 수립한 일정 및 비용 등의 계획은 수행 중 발생하는 많은 불확실성을 반영하고 있지 않기 때문에 진행되고 있는 프로젝트는 초기에 계획한 일정과 비용에 많은 차이를 보이는 경우가 발생한다. 이에 따라 본 연구에서는 진행 중인 소프트웨어 개발 프로젝트의 상황을 분석하고 예측할 수 있는 방법으로 일정과 비용을 통합 관리할 수 있는 획득가치관리(EVM: Earned Value Management)를 활용하는 방안을 제시하였다. 획득가치관리(EVM)을 적용하기 위해 일정과 비용의 통합관리하기 위해 예상되는 투입 인력과 비용 등을 감안하여 작업분할 구조(WBS)와 연계하여 계획을 수립하고 측정하는 방법을 구축 중인 프로젝트의 사례를 통하여 적용 방안을 제시하였다. 사례 분석한 각각의 프로젝트 진행 단계에 따라 예측한 값이 실제 계획 대비 일정과 비용에 대한 예측 오차 변화 추이를 분석하였으며, 향후 진행되는 프로젝트의 일정 및 비용 등의 계획을 체계적으로 수립하고, 진행되는 프로젝트의 일정 및 비용 등에 대해 분석하고 예측하는데 활용할 수 있도록 연구하였다.

  • PDF

Preliminary Form Design of Cable Structure using Computer Graphics (컴퓨터 그래픽스를 이용한 케이블 구조의 초기형태 설계)

  • Kim, Nam-Hee;Koh, Hyun-Moo;Hong, Sung-Gul
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.375-382
    • /
    • 2011
  • Nowadays computer graphic softwares have opened a lot of potential by providing parametric modeling and generative algorithms which are useful not only to describe various geometrical shapes but also to implement a designer's intent in terms of modules systematically. This study has proposed a way of developing a module for generating preliminary structural configuration using such potential computer graphics. Especially parametric modeling and generative algorithm are utilized to define various design alternatives, and moreover use of dynamic graphics enables designers to generate a structural form on one side and a force flow diagram correspondingly provided on the other. This ultimately leads to rational preliminary design of a structural form considering its force flow.

A Study of Operation of Kanban System by using Function of Kanban numbers (Kanban 함수를 이용한 Kanban 시스템의 운영에 대한 연구)

  • 이상복;강석호
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.2
    • /
    • pp.11-22
    • /
    • 1995
  • kanban 시스템의 초기 Kanban 갯수 결정문제는 Kanban 시스템의 최적 운영 문네 준 하나이다. 생산 공정 구조가 일반 형태를 같는 Kanban 시스템에서는 초기 최적 Kanban 갯수 결정 문제는 수학적으로는 정수계획법으로 모델화 되기 때문에 발견적 해법으로는 가능해만 제시해 줄 수 있다. 실제 Kanban 시스템을 사용하는 현장에서는 대부분 경험적으로 초기 Kanban 갯수를 결정한다. 본 논문에서는 현장 경험을 이용하여 각 생산 단계 사이에 생산걍, 재고, 고갈이 Kanban 갯수에 따라 관계성을 찾을 수 있다면, 일반 생산 형태를 갖는 Kanban 시스템에 Kanban 갯수함수를 적용하여 초기 Kanban 갯수 결정하는 개법을 제시했다.

  • PDF

A Production Planning System for Assembly Process of Offshore Structure Modules (해양구조물의 모듈조립공정을 위한 생산계획법)

  • Jeong-Je Kim;So-Heum Park
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.29 no.1
    • /
    • pp.173-190
    • /
    • 1992
  • Considerable number of offshore platforms have been built in Korean shipyards ever since 1976. Unlike for the cases of building ships, however, negligible efforts have been made to establish planning methodology for building onshore platforms. Severe congestion has been shown in the processes of assemblying modules of platforms. The module which is the upper part of a platform is a steel structure accommodating various types of outfittings and machinaries. The production planned without proper consideration on allocating work loads by trade used to show severe interferences among trades of workers and resulted in delayed completion. In this paper, a method of planning module assembly in consideration of leveling work loads by trade is discussed. A system of planning has been formulated and tested on a exampled case of producing a mix of 72 modules. The test showed a possibility of saving 31% of manpower and trimming 11% of through put time.

  • PDF

A Study on the Standardization of the Urban Planning Information System (도시계획정보시스템 표준화를 위한 방향설정에 관한 연구)

  • Kim, In-Hyun;Oh, Kyu-Shik
    • Spatial Information Research
    • /
    • v.18 no.5
    • /
    • pp.75-81
    • /
    • 2010
  • The Urban Planning Information System is the core system in urban planning field which should operate at the national level of network, and requires a close inspection from the initial level of development. Therefore, this study analyzes international standards, domestic laws, preceding plans, as well as the standard system established in 2008, in order to identify the problems and propose directions for the future direction of the Urban Planning Information System. Suggestions from this study can be summarized as follows: (1) to take initiatives to create standards for the development of the Urban Planning Information System, followed by the establishment as international standards, (2) to have the system developed as an open structure, and (3) to comply w ith the preceding plans of related national GIS system to enable integration.

Settlement system requirement analysis of electricity market (전력거래시장에서 정산을 위한 시스템 요구사항 분석)

  • Kim, Mi-Sung;Kim, Min-Bae
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.421-422
    • /
    • 2008
  • 우리나라는 정부의 전력산업 구조 개편 계획에 따라 2001년부터 전력거래시장을 도입하였고 초기 단계 전력거래시장을 운영하기 위한 "발전경쟁(CBP : Cost Based Pool)시스템"을 국내기술로 개발하였다. 전력산업 구조 개편 잠정중단으로 발전경쟁시장이 장기화되어, 99년도 개발당시 초기단계(2$\sim$3년간)에만 사용할 예정이었던 CBP 시스템이 지속적으로 운영 되어왔다. 발전경쟁시장이 장기화됨에 따라 회원사의 수가 시장 초기 10개사에서 2008년 8월 기준 226개사로 증가하였고, 전력거래량 규모도 13조원에서 21조원으로 확대되었다. 시장의 변화에 파라 전력시장의 운영규칙 또한 여러 차례 개선되었다. IT기술도 급격히 발달하여 이에 따라 CBP 시스템도 변화하여 왔다 본 논문에서는 발전경쟁시장에서 정산시스템의 현재 역할과 기능 및 요구사항을 살펴보기로 한다.

  • PDF

A Technical Report on the Design and Construction of Hybrid Tension Roof Structure of Incheon Munhak Stadium (인천문학경기장 지붕구조의 설계와 시공)

  • Seok Hwangbo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.194-201
    • /
    • 2003
  • 대공간 구조시스템은 일반적으로 자중을 최소화하고 부재내력의 효과적인 사용이 매우중요하다. 따라서 준공후의 외력에 대한 구조적 거동에 대한 파악도 중요하지만 시공중의 거동에 대한 파악도 매우 중요하다. 특히 케이블 막구조의 경우 시각초기에 구조물이 불안정하지만 케이블에 장력이 도입되면서 점차적으로 구조물의 강성이 높아져 구조물이 안정화를 이루게 피므로 시공과정 해석 즉 안정화 이행과정해석이 시공계획을 설정하는 부분에서 매우 중요한 요소가 된다. 본고에서는 케이블 막구조의 실례로써 최근 완공된 인천문학 경기장 지붕구조를 대상으로 시공과정과 안정화 이행과정해석에 대한 소개를 한다. 인천문학경기장 지붕구조는 케이블에 장력을 도입하는 과정에서 발생되는 변형과 내력을 흡수하고 하부구조에 대한 영향을 최소화하기 위하여 마스크 지점의 회전과 이동이 가능한 특수공법을 채택하였으며 시공과정해석(안정화이행과정해석)을 통하여 제시된 단계별 목표장력 및 변위에 따라 시공과정이 계획되고 제어되었다. 특히 외국의 기술로 설계된 자료를 근거로 일방적으로 공사를 수행한 다른 구조물과는 다르게 국내의 기술력에 바탕한 구조 해석 등을 통하여 검증하여 최종 시공방법을 결정하였고 이러한 과정을 통하여 대공간 구조에 대한 기술력을 확보하고 확인할 수 있었으며, 그 결과 향후에는 국내의 기술력으로 이와 같은 대규모의 케이블 막구조의 설계와 시공이 가능할 것이라고 판단된다.

  • PDF

熔接構造論 I

  • 엄기원
    • Journal of Welding and Joining
    • /
    • v.9 no.4
    • /
    • pp.1-8
    • /
    • 1991
  • 용접구조물을 그의 사용목적에 적합하게 제작하려면 그의 구조설계와 사용재료의 적절한 선택과 사용성능을 충분히 확보하게 끔 제작과정과 품질보증을 할 수 있는 것이 필요하다. 즉 용접성 (Weldability)을 만족하게 하는 것이다. 구조물의 제작에 있어서 배려하여야 할 것은 구조의 사 용성능의 확보와 안전성인 것이다. 사용성능이란 구조의 강도, 기능 그리고 미관이나 끝내기의 외관적 성능등이다. 우리들의 생활공간에 존재하는 구조물이 한번 파손이나 파괴의 사고가 발 생하면 치명적인 것이 된다. 용접설계 생산과 제작의 기술적인 준비로써 용접구조물을 대상으로 용접가공에 중점을 두어 사용되는 말이다. 용접설계는 구조물과 제품의 용접제작과정을 완전히 지시하고 용접이음에 요구되는 사용성능이 확보 되게 끔 부재배치와 치수등이 선정되고 제작과 검사등의 실제 작업성을 충분하게 고려한 제작계획을 세우는 것을 말한다. 이와 같이 된 용접 설계를 바탕으로 용접기술자가 최적한 용접재료의 용접조건등을 결정한다. 즉 설계와 용접시공은 서로 밀접한 관계를 갖고 있어야 한다. 특히 용접설계의 비교적 초기단계에 속하는 것은 제품 기본계획과 강도해석 그리고 구조설계의 과정에 반드시 용접기술자의 관여가 필요한 것이다. 그리고 설계의 최적화를 위하여는 많은 정보 특히 경험적인 정보와 구조 해석적인 정보가 잘 처리되어야 한다. 오늘날의 CAD의 도입이란 전산기의 처리기술과 graphic기술을 묘미 있게 이 용한 것이라 할 수 있다. 용접구조물의 용접성을 논술하려면 다음과 같이 구분하는 것이 바람 직하다. 1. 용접구조물의 허용강도 2. 동접구조용의 강의 선택 3. 용접시공조건 4. 용접설계 이중 용접 제작과정을 표 1에 나타내었다. 구조물의 용접설계 요구조건으로써, 1)손상, 2)탄성 파손, 3)항복응력, 4)기계적인 불안정성, 5)파괴와 붕괴등을 고려하여야 하며 구조용 강의 선택은 1. 강도(strength) 2.연성(ductility) 3.인성(toughness)을 고려하여 구조물의 설계에 충분히 만 족해야 한다.

  • PDF