• Title/Summary/Keyword: 초기확률

Search Result 444, Processing Time 0.035 seconds

Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk (CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안)

  • Hyun, Chang-Taek;Go, Gun-Ho;Jin, Zhengxun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.295-303
    • /
    • 2018
  • In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.

Repair Cost Analysis for Chloride Ingress on RC Wall Considering Log and Normal Distribution of Service Life (로그 및 정규분포 수명함수를 고려한 콘크리트 벽체의 염해 보수비용 산정)

  • Yoon, Yong-Sik;Kwon, Seung-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.2
    • /
    • pp.10-19
    • /
    • 2019
  • Management plan with repairing is essential for RC structures exposed to chloride attack since durability problems occur with extended service life. Conventionally deterministic method is adopted for evaluation of service life and repair cost, however more reasonable repair cost can be obtained through continuous repair cost from probabilistic maintenance technique. Unlike the previous researches considering only normal distribution of life time, PLTFs (Probabilistic Life Time Function) which can be capable of handling log and normal distributions are attempted for initial and repair service life, and repair cost is evaluated for OPC and GGBFS concrete. PLTF with log distributions in initial service life is more effective to save repair cost since it is more dominant after average than normal distribution. Repair cost in GGBFS concrete decreases to 30% of OPC concrete due to longer initial service life and lower repairing event. The proposed PLTF from the work can handle not only normal distributions but also log distributions for initial and repair service life, so that it can provide more reasonable repair cost evaluation.

Probability-Based LCCO2 Evaluation for Undergroung Structture with Repairing Timings Exposed to Carbonation (탄산화에 노출된 지하구조물의 보수횟수에 따른 LCCO2 평가)

  • Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.3
    • /
    • pp.239-246
    • /
    • 2017
  • RC(Reinforced Concrete) structures can keep their performance during intended service life through initial service life and extension of the life through repairs. In the deterministic repairing method, cost and the related $CO_2$ emission increase with step-shaped escalation, however continuous results can be obtained through probabilistic repairing technique, and this is capable of reducing $CO_2$ emission through $CO_2$ absorption. In the work, repairing timing and $CO_2$ emission/absorption are evaluated based on the different methods like deterministic and probabilistic manner. The probabilistic technique considering $CO_2$ absorption with carbonation progress is evaluated to be very effective to reduction of $CO_2$ emission through extension of initial and additional service life due to repairs. When the variations of the service life from initial construction and repair material can be determined, the proposed technique can contribute to reduction of cost and $CO_2$ with decreasing repairing number.

Stability Analysis of Embankment Overtopping by Initial Fluctuating Water Level (초기 변동수위를 고려한 제방 월류에 따른 안정성 분석)

  • Kim, Jin-Young;Kim, Tae-Heon;Kim, You-Seong;Kim, Jae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.8
    • /
    • pp.51-62
    • /
    • 2015
  • It is not possible to provide resonable evidence for embankment (or dam) overtopping in geotechnical engineering, and conventional analysis by hydrologic design has not provided the evidence for the overflow. However, hydrologic design analysis using Copula function demonstrates the possibility that dam overflow occurs when estimating rainfall probability with rainfall data for 40 years based on fluctuating water level of a dam. Hydrologic dam risk analysis depends on complex hydrologic analyses in that probabilistic relationship needs to be established to quantify various uncertainties associated with modeling process and inputs. The systematic approaches to uncertainty analysis for hydrologic risk analysis have not been addressed yet. In this paper, the initial level of a dam for stability of a dam is generally determined by normal pool level or limiting the level of the flood, but overflow of probability and instability of a dam depend on the sensitivity analysis of the initial level of a dam. In order to estimate the initial level, Copula function and HEC-5 rainfall-runoff model are used to estimate posterior distributions of the model parameters. For geotechnical engineering, slope stability analysis was performed to investigate the difference between rapid drawdown and overtopping of a dam. As a result, the slope instability in overtopping of a dam was more dangerous than that of rapid drawdown condition.

New approximations of the ruin probability in a continuous time surplus process (보험상품 파산확률의 새로운 근사방법)

  • Kwon, Cheonga;Choi, Seung Kyoung;Lee, Eui Yong
    • Journal of the Korean Data and Information Science Society
    • /
    • v.25 no.1
    • /
    • pp.1-10
    • /
    • 2014
  • In this paper, we study approximations of the ruin probability in a continuous time surplus process. First, we introduce the well-known approximation formulas of the ruin probability such as Cram$\acute{e}$r, Tijms' and De Vylder's methods. We, then, suggest new approximation formulas of two types, which improve the existing approximation formulas. One is Cram$\acute{e}$r and Tijms' type which makes use of the moment generating function of distribution of a claim size and the other is De Vylder's type which makes use of the surplus process with exponential claims. Finally, we compare, by illustrating numerical examples, the newly suggested approximation formulas with the existing approximation formulas of the ruin probability.

An Efficient Traning of Multilayer Neural Newtorks Using Stochastic Approximation and Conjugate Gradient Method (확률적 근사법과 공액기울기법을 이용한 다층신경망의 효율적인 학습)

  • 조용현
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.8 no.5
    • /
    • pp.98-106
    • /
    • 1998
  • This paper proposes an efficient learning algorithm for improving the training performance of the neural network. The proposed method improves the training performance by applying the backpropagation algorithm of a global optimization method which is a hybrid of a stochastic approximation and a conjugate gradient method. The approximate initial point for f a ~gtl obal optimization is estimated first by applying the stochastic approximation, and then the conjugate gradient method, which is the fast gradient descent method, is applied for a high speed optimization. The proposed method has been applied to the parity checking and the pattern classification, and the simulation results show that the performance of the proposed method is superior to those of the conventional backpropagation and the backpropagation algorithm which is a hyhrid of the stochastic approximation and steepest descent method.

  • PDF

Improved Cache-hot Page Allocation Technique for Reducing Page Initialization Latency of Linux Based Systems (리눅스 기반 시스템의 페이지 초기화 지연 단축을 위한 향상된 캐시-핫 페이지 할당 기법)

  • Yang, Seokwoo;Noh, Sunhyeon;Hong, Seongsoo
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2019.01a
    • /
    • pp.415-418
    • /
    • 2019
  • 최근 사용자 대화형(user-interactive) 응용들은 OS에게 많은 양의 메모리를 빈번하게 요구한다는 특징을 보인다. 응용의 메모리 할당 요청이 발생하면 OS는 할당할 페이지의 초기화 작업을 필수적으로 수행하는데, 빈번하게 발생하는 페이지 초기화 작업이 응용의 성능을 저하시키고 있다. 기존 리눅스 기반 시스템은 페이지 초기화 지연을 단축하기 위해 CPU의 캐시에 매핑되어 있어서 초기 값을 빠르게 쓸 수 있는 페이지인 캐시-핫(cache-hot) 페이지를 우선적으로 할당한다. 하지만 기존 리눅스는 각 코어별로 캐시-핫 페이지를 인식하고 관리하며, 다른 코어가 관리하는 캐시-핫 페이지에는 접근할 수 없다. 이러한 정책 때문에 다른 코어가 공유 캐시(shared cache)에 매핑된 캐시-핫 페이지를 관리하고 있더라도, 이를 할당받지 못하고 캐시-콜드(cache-cold) 페이지를 할당받는 경우가 발생한다. 본 논문에서는 공유 캐시에 매핑된 것으로 추정되는 캐시-핫 페이지를 별도로 인식하고 공유 캐시에 매핑된 것으로 추정되는 캐시-핫 페이지를 모든 코어가 활용할 수 있게 하여, 응용이 캐시-핫 페이지를 할당받을 확률을 기존 기법보다 높이는 향상된 캐시-핫 페이지 할당 기법을 제안한다. 제안된 기법은 페이지 할당 요청이 발생하면 먼저 각 코어의 사유 캐시에 매핑된 것으로 추정되는 캐시-핫 페이지를 우선적으로 할당하고, 할당에 실패하면 공유 캐시에 매핑된 것으로 추정되는 캐시-핫 페이지를 할당한다. 이를 통해 캐시-핫 페이지를 할당받을 확률을 기존 기법보다 높이고, 결과적으로 평균 페이지 초기화 지연을 단축한다. 제안된 기법을 리눅스 커널 4.18.10버전 기반 환경에서 구현하여 실험한 결과, 평균 페이지 초기화 지연이 기존 리눅스 시스템과 비교하여 약 7% 단축되었다.

  • PDF

월성 2,3,4호기 확률론적 안전성 평가의 인간오류에 대한 민감도분석

  • 강대일;양준언;박진희;황미정;김명기
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.05a
    • /
    • pp.520-526
    • /
    • 1997
  • WASH-1400[1]이 발간된 이후 수행되어왔던 많은 확률론적 안전성 평가 결과를 보면 노심손상빈도를 나타내는 사고경위 중 많은 부분이 인간행위와 관련이 있는 것으로 밝혀져 확률론적 안전성 평가에서 인간행위를 다루는 것은 매우 중요하게 되었다. 그러나 인간신뢰도분석은 인간행위의 다변성(variability)으로 인해 인간행위의 모델링이 어렵고 데이타가 부족해 뚜렷한 방법론이 없어 분석시 분석자의 주관성이 개입될 여지가 있고 분석결과에는 많은 불확실성을 포함하고 있다. 노심손상빈도를 나타내는 사고경위에는 다수 인간행위가 있는 포함돼있는 단절집합을 얻게되는데 이러한 인간행위들 사이에는 기기의 공통원인 고장처럼 의존성이 존재한다. 이러한 의존성의 평가방법 또한 뚜렷하게 설정되어 있지 않은 형편이다. 이에 본 논문에서는 월성 2,3,4호기 확률론적 안전성 평가 모델에 고려되어있는 인간행위들의 인간오류 확률 값과 의존성 수준의 변화에 대한 민감도분석을 수행하였다. 분석결과 초기사건 이후의 인간행위가 노심손상빈도 변화에 크게 기여하는 것이 밝혀졌고, 다수 인간행위들 사이의 의존성 수준변화가 노심손상빈도 변화에 큰 영향을 준다는 것이 밝혀졌다.

  • PDF

Stability of CWR Tracks according to the Characteristics of the Probability Distribution of the Neutral Temperature (중립온도의 확률분포 특성에 따른 CWR 궤도의 안정성)

  • Bae, Hyun-Ung;Choi, Jin-Yu;Kim, Myoung-Su;Lee, Chin-Ok;Lim, Nam-Hyoung
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.489-492
    • /
    • 2011
  • 장대레일 궤도의 부동구간에서 발생되는 과도한 축력은 혹서기 궤도의 좌굴을 유발시켜 주행하는 열차의 안정성을 위협할 수 있다. 궤도 제원을 제외한 압축응력과 관련된 레일온도 인자, 궤도 강성과 관련된 도상저항력, 궤도의 초기결함인 궤도틀림과 같은 인자들은 기후조건, 궤도 운영조건, 유지관리조건 등에 의해 임의적으로 변동되는 불확실성이 높은 궤도 매개변수이다. 그러므로 장대레일 궤도의 좌굴은 불확실성이 높은 현상임을 알 수 있다. 따라서 궤도 매개변수들의 불확실성 및 임의성을 합리적으로 고려하기 위해서는 확률론적 접근방법의 적용이 필수적이라 할 수 있다. 본 논문에서는 기존 본 연구진에 의해 개발된 장대레일 궤도의 좌굴확률 평가시스템을 이용하여 장대레일 축력을 산정하기 위한 필수요소인 중립온도의 확률분포 특성에 따른 좌굴 안정성을 분석하였다.

  • PDF

Optimal Replacement Model for Minimal Repairs (수리를 최소로 하는 최적교체모델)

  • Tae-Geun Park;Dong-Soon Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.1
    • /
    • pp.79-84
    • /
    • 2003
  • 종래의 연구들은 주로 시간이 경과함에 따라 수리비용과 고장시간 간격이 고정된 상태에서 최적교환시각(T)을 구하는 조건을 발견하는데 중점을 두었으나, 대부분의 시스템은 시간이 경과할수록 고장시간간격이 좁아지고 수리비용은 증가하는 것이 일반적이다. 본 논문에서는 위의 두 조건을 만족하는 보다 현실적인 모델을 구축하였으며, 또 일정시간 내에 2개의 시스템이 존재할 때 어느 조건 하에서 시스템이 확률적으로 우월한가를 분석하는 연구를 수행하였다. 즉, 시스템은 시간이 경과함에 따라 확률 P[N=k]로서 완전수리를, 1-P[N=k]로서 소수리를 행하는 모델을 고려하였다. 여기서 N은 연속된 완전수리 사이의 소수리의 수를 나타낸다. 또한 초기고장에 있어서 수리에 의해 새로운 시스템이 되는 확률이 높고, 고장횟수가 증가함에 따라 완전수리가 행해지는 확률이 낮아지는, 보다 현실에 가까운 모델을 구축하였다. 모델을 일반화하기 위해 수리비용은 확률변수로 가정하였다.