• Title/Summary/Keyword: 체결응력

Search Result 160, Processing Time 0.021 seconds

Construction Monitoring for Steel Truss Bridge Widening Works (강 트러스교 확장공사시 시공중 계측)

  • Lee, Chang Soo;Jang, Jeong Hwan;Yi, Jang Seok;Kim, Nam Hong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.2
    • /
    • pp.103-112
    • /
    • 2005
  • This study examines the stability of Sungsu bridge which was issued nine years ago because of its collapse accident and now is on the progress of extension work in each construction stage by construction monitoring system. From this study, the measured value in each construction stage of anchorage truss and suspended truss shows the agreement with the analytical values up to 60~110 percents, and the elements' stresses emanating from the pre-loading stage, are also similar to the analytical value. Regarding these results, it is expected that each member has enough stiffness and the construction condition is satisfactory. In addition, it is expected that the transverse members and sway bracing bolts integrate completely the existing truss and new attached truss as a one body from the result of the vibration test to find out the integration rates.

Mechanical Performance Evaluation of Rolling Thread Steel Rebar Connection with Taper type Coupler (변단면 전조 가공 철근이음 연결방법의 성능 평가)

  • Jeong, Jin-Hwan;Kim, In-Tae;Kim, Tae-Jin;Lee, Myung-Jin;Ahn, Jin-Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.2
    • /
    • pp.40-51
    • /
    • 2015
  • In reinforced concrete structure, rebar connection method should be considered because of its structural role to resist the tensile stress and its structural load transmission with concrete in the concrete structure. Lapped splice and mechanical sleeve type connector have been traditionally used to connect rebar in the concrete structures. In this study, to examine the mechanical and failure behaviors of rebar bar connected by taper type coupler in the concrete member depending on connection type and condition, tensile tests of steel rebar with taper type coupler and flexible loading tests of concrete beams were conducted. Its tensile strength and flexible strength of the rebar connected by taper type coupler were compared and evaluated by mechanical behaviors of rebar. From this study, steel rebar connected by taper type coupler showed it has similar mechanical performance comparing with unconnected rebar, thus taper type coupler can be used in the rebar fabrication of reinforced concrete structure.

The Displacement Limit at the End of an Approach Slab for a Railway Bridge with Ballastless Track (콘크리트궤도 부설 교량의 접속슬래브 단부 처짐한도에 관한 연구)

  • Choi, Jin-Yu;Yang, Shin-Chu
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.2
    • /
    • pp.195-202
    • /
    • 2008
  • The transition area between a bridge and an earthwork is one of the weakest area of track because of the track geometry deterioration caused unequal settlement of backfill of abutment. In case of a ballastless track, the approach slab could be installed to prevent such a phenomenon. But, if there is occurred the inclined displacement on the approach slab by a settlement of the foundation or formation, the track is also under the inclined displacement. And this defect causes reducing the running stability of a vehicle, the riding comfort of passengers, and increasing the track deteriorations by excessive impact force acting on the track. In this study, parametric studies were performed to investigate the displacement limit on the approach slab to avoid such problems. The length and the amount of unequal settlement of approach slab were adopted as parameter for numerical analysis considering vehicle-track interaction. Car body accelerations, variations of wheel force, stresses in rail, and uplift forces induced on fastener clip were investigated. From the result, resonable settlement limit on the end of an approach slab according to slab length was suggested.

Train-Structure Dynamic Interaction Analysis of The Bridge Transition Considering Track Irregularity (궤도틀림을 고려한 교대접속부의 열차상호동적거동해석)

  • Choi, Chan-Yong;Kim, Hun-Ki;Chung, Keun-Young;Yang, Sang-Beom
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.9
    • /
    • pp.29-38
    • /
    • 2015
  • In this study, track dynamic interaction characteristics caused by the vehicle running through transitional section such as bridge abutments were studied using the finite element analysis program. The geometric condition of track was generated by trigonometric function and allowable maximum track irregularity is determined by KORAIL track maintenance criteria. The sub-infrastructure under rail fastener system was modelled by 3D solid elements. To reduce computational cost only half track line is numerically considered and the roller boundary condition was applied to each side of model. In this study, the vehicle-track dynamic interaction analysis was carried out for standard Korean transition section of concrete track and the dynamic behaviors were investigated. The dynamic characteristics considered are wheel load variation, vertical acceleration at body, and maximum Mises stress at each part of transitional section.

Optimal Design of Slipper Metal for Power Transmission in Aluminum Hot Rolling Process (알루미늄 열간 압연공정의 동력전달용 슬리퍼 메탈에 대한 형상 최적설계)

  • Lee, Hyun-Seung;Lee, Young-Shin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.10
    • /
    • pp.1437-1442
    • /
    • 2010
  • A slipper metal is used for power transmission in the aluminum hot rolling process. The slipper metal connects a spindle with a coupling. Therefore, if the slipper metal is seriously damaged, the spindle and the coupling will crash into each other. Therefore, preventing the destruction of the slipper metal is essential for ensuring a long mechanical life cycle. In this study, the structural analysis and optimal design of the slipper metal was carried out by finite element method for life extension of the slipper metal. To verify the interference of spindle assembly with modified slipper metal, a kinematics simulation was performed by applying various combinations of dynamic boundary conditions. As a result of structural analysis and optimal design of the slipper metal, the maximum stress of the modified slipper metal was lower than that of the initial model by 22%.

A finite element stress analysis on the supporting bone and abutment screw by tightening torque of dental implant abutment screw (치과용 임플란트 지대주나사의 조임체결력에 따른 지지골과 지대주나사의 유한요소법 응력 분석)

  • Lee, Myung-Kon
    • Journal of Technologic Dentistry
    • /
    • v.42 no.2
    • /
    • pp.99-105
    • /
    • 2020
  • Purpose: A study analysed the stress distribution of abutment screw and supporting bone of fixture by the tightening torque force of the abutment screw within clinical treatment situation for the stability of the dental implant prosthesis. Methods: The finite element analysis was targeted to the mandibular molar crown model, and the implant was internal type 4.0 mm diameter, 10.0 mm length fixture and abutment screw and supporting bone. The occlusal surface was modeled in 4 cusps and loaded 100 N to the buccal cusps. The connection between the abutment and the fixture was achieved by combining three abutment tightening torque forces of 20, 25, and 30 Ncm. Results: The results showed that the maximum stress value of the supporting bone was found in the buccal cortical bone region of the fixture in all models. The von Mises stress value of each model showed 184.5 MPa at the 20 Ncm model, 195.3 MPa in the 25 Ncm model, and 216.5 MPa in the 30 Ncm model. The contact stress between the abutment and the abutment screw showed the stress value in the 20 Ncm model was 201.2 MPa, and the 245.5 MPa in the 25 Ncm model and 314.0 MPa in the 30 Ncm model. Conclusion: The increase of tightening force within the clinical range of the abutment screw of the implant dental prosthesis was found to have no problem with the stability of the supporting bone and the abutment screw.

Pullout Resistance of Geosynthetic Strip with Rounded Band Anchor (수동저항부가 형성된 띠형 섬유보강재의 인발저항 특성)

  • Lee, Kwang-Wu;Cho, Sam-Deok;Han, Jung-Geun;Hong, Ki-Kwon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.10 no.3
    • /
    • pp.43-51
    • /
    • 2011
  • This paper describes the results of pullout tests in the laboratory, which are conducted to assess the pullout performance of recently developed geosynthetic strip reinforcement with rounded band anchor. The geosynthetic strip can be used as reinforcements in reinforced soil wall with concrete block facing. The pullout resistance of the geosynthetic strip with rounded band anchor is mobilized by the combination of the interface friction between soil-reinforcement surface and the passive soil resistance caused by the rounded band anchor. Therefore, both the friction resistance and the passive resistance have to be considered in design. From the pullout test results, when the rounded band anchor are formed in the end part of the geosynthetic strip, pullout strength increases about from 10% to 65%. The passive resistance can be evaluated based on the pullout test results.

A Fundamental Study on Leak Detection System for Water Supply Valve Using Smart Bolt (상수도 밸브 누수 탐지용 스마트 볼트 적용의 기초 연구)

  • Park, Chul;Kim, Young-seok;Jung, Hae-Wook;Choi, Sang-sik;Lee, Yong-Beom
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.144-154
    • /
    • 2020
  • Purpose: This paper is a fundamental study on the applicability of the smart bolt developed for monitoring system to detect the leakage of water supply valve. Method: A leak detection experiments were conducted using the smart bolt having embedded strain sensors and accelerometer. The smart bolt used in study meets the allowable criteria of torque and tensile stress for water supply system, and it can be applied to a joint of the water supply valve by behaving well within the allowable limits. Result: As a result of the simulated leak tests, a leak signal at the valve leak point was detected in a band of 60Hz, and the main pipe leaking point was observed to produce a leak signal having much higher frequency than that of the valve leak point. This seems to result in a total coupled vibration under unconfined conditions of the pipes. Conclusion: The smart bolts appeared applicable to detecting a leaking signal from the water supply valve.

An Optimization Design of the Insertion Part for Preventing the Screw Thread from Loosening (나사 풀림 방지를 위한 삽입 부품의 설계 최적화)

  • Park, Sangkun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2356-2363
    • /
    • 2015
  • This study deals the optimization design with the simulation based design of a coil spring inserted into the lock nut for preventing the screw thread from loosening at the bolted joint when the high-strength steel bolt with the property class of 10.9 is used and the screw torque of 640 to 800 (Nm) is applied. In this study, structural analysis of assembly composed of bolt, nut and coil spring is carried out to evaluate its safety factors on the basis of the equivalent stress with commercial finite element analysis software. And the design strategy to extract the design improvement from these simulation results is established. An iterative process performed with the proposed design strategy is also proposed for improving the performance of the existing design. At the proposed procedure, the feasible design parameters using response surface method are found, and then these parameters are verified to be optimal or not by comparing with the response values and the simulation results obtained from the feasible parameters.

Seismic Performance Evaluation of Beam-Column Connection for Panel Zone Strength (패널존의 강도비에 따른 기둥-보 접합부의 내진성능 평가)

  • Kim, Sung-Young;Shin, Chang-Hoon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.1 s.24
    • /
    • pp.11-20
    • /
    • 2007
  • The study proposes the method to cancel the scallop to avoid fracture of the circumstance of the scallop at H shape column-to-beam connection and reinforce at beam flange two faces with the cover plates and rib. A total of four specimens were tested to enhance seismic performance of building structure by reducing the frequency of stress concentration and preventing the brittle fracture of scallop. For this purpose, four full-scale test specimens were made and loaded with quasi-static reversed cyclic loading. The main analytical parameters are panel-zone-strength ratio, yield strengths, initial stiffness, total plastic rotation, contribution of each element to total plastic rotation and energy dissipation capability. For the specimens tested under repeated loading, the experimental result was satisfied with seismic performance requirement as the Special Moment Frames (SMF). The analysis results show that all of the test specimens were found to have good performance to 4% story drift and satisfied the criteria for the plastic roation capacity of SMFs that is 0.03 rad. according to the 1997 AISC seismic provision.