• Title/Summary/Keyword: 철도 도상 자갈

Search Result 91, Processing Time 0.029 seconds

A Study on Effect of Vibration Reduction with Ballast Mat of Ballasted Track in Tunnel (터널내 자갈도상제도의 자갈도상매트 시공 후 진동 저감 효과에 대한 연구)

  • You, Chung-Jun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.167-174
    • /
    • 2009
  • Due to the travelling of the train with high speed the period of maintenance activities of the ballasted track is coming to be short, and more from the residential area of the ballasted track tunnel circumference the civil appeal is increasing with railroad vibration problem. To reduce the vibration problem and a maintenance cost establishes the ballast mat in the tunnel within part segment. In this study, to estimate the vibration reduction effect of the ballast mat we have done a comparative analysis with the vibration field test by the transit train by at the ballasted track with ballast mat and the standard ballasted track without vibration protection in tunnel.

Study of the Performance of a Dry Cleaning Method for Polluted Ballast Gravel of Railroad Fields (철도부지 오염도상자갈의 건식 정화 기술 성능 연구)

  • Cho, Youngmin;Park, Duckshin;Kwon, Tae-Soon;Lee, Jae-Young
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.6
    • /
    • pp.552-557
    • /
    • 2015
  • Ballast gravel in a railroad field is often polluted by grease and heavy metals. In this paper, the performances of a dry cleaning method for polluted ballast gravel in which pollutants on the gravel surface can be physically removed was extensively studied. A polluted ballast cleaning device able to shoot emery blasting media onto the surface using compressed air was prepared. Polluted ballast gravel was put into this device for cleaning, with the treatment time varied from 1 to 10 min. The cleaning efficiency of the total petroleum hydrocarbons and heavy metals were studied. The total petroleum hydrocarbon removal efficiency was 70-80% for gravels sampled from a locomotive waiting line, while it was 40-60% for gravels sampled from a turnout area. The heavy metal removal efficiency exceeded 90% for copper and lead, while it was 65-80% for nickel and zinc. This system was found to be effective for the remediation of polluted ballast gravels.

Aggregate Criterion for Paved Track Considering Recycling of Railway Ballast (도상자갈 재활용을 고려한 포장궤도용 골재 기준)

  • Lee, Il-Wha
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.481-487
    • /
    • 2009
  • On the paved track, the railway ballast is used as aggregate for the filling layer using the pre-packed concrete method. The condition of ballast as the paved track aggregate ensure that the compressive strength, particle distribution size for the pouring and surface clearance to increase the adhesive strength with mortar. It is profitable to recycle the existing railway ballast as a economical supply. In order to increase recycling characteristic, it is necessary to apply the similar criterion which does not exceed the conventional railway ballast criterion. Consequently, this paper was to investigate physical characteristics of existing ballast, particle size distribution, compressive and flexural strength, bearing capacity and filling capacity to prepare the aggregate's recycling. As a result, optimized aggregate criterion is suggested.

An Estimate of Ballast Track Condition on Dynamic Behavior of Railway Bridge (철도교량의 동적거동 특성을 고려한 자갈도상궤도의 상태추정에 관한 연구)

  • Kweon, Oh-Soon;Choi, Jung-Youl;Kang, Myoung-Seok;Lee, Hee-Up;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.480-493
    • /
    • 2007
  • Many railway-advanced countries are using the various types of track to reduce the track maintenance and repair cost according to the improvement of velocity. It spends on much maintenance and repair cost for ballast track due to abrasion of ballast, track irregularity and unisotropical ballast-support stiffness. The ballast track on railway bridge is accelerating the deterioration of ballast according to interaction of railway bridge and track. As continuing the deterioration, it is caused dynamic loads. Due to these effects, it increases negative loads of track and bridge. However, when designing the railway bridge, the effect of ballast track was applicate only dead load, so elastic behavior effect of ballast track is not influenced. Therefore, this paper presumes the stiffness of ballast track on railway bridge considering dynamic behavior of railway bridge, it was evaluated that effect on dynamic behaviors of railway bridge according to ballast track stiffness.

  • PDF

A Study on the Crushing Characteristic of the Ballast Gravel at High-Speed Railroad (고속선 도상자갈의 파쇄특성에 관한 연구)

  • Lee, Choon-Kil;Kim, Nam-Hong;Woo, Byoung-Koo;Lee, Sung-Uk
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.4
    • /
    • pp.384-389
    • /
    • 2008
  • The ballast, one of track components, plays an essential role as intermedium in transmitting train load to subgrade safely, and the deterioration of ballast directly effects the growth of track irregularity. In this study, we determined the main factor of ballast deterioration was miniature of ballast gravel caused MTT (Multiple Tie Tamper) works and accumulated traffic loads. To estimate the deterioration characteristics of ballast, we carried out field test (Chap.2) through track construction for test and the model test (Chap.3) simulating the actual operation environment, have done a comparative analysis with the sample's result (crushing rate) of high-speed railroad running actually.

Evaluation of the Influence Factors on the Ballast Settlement by using the Discrete Element Method (개별요소법을 이용한 도상자갈 침하 영향인자 평가)

  • Kim, Ki Jae;Lee, Sung Jin;Jang, Seung Yup;Hwang, Sung Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.715-722
    • /
    • 2016
  • Most of the domestic railroad tracks are ballast track and repetitive maintenance is required in this track. Therefore, it is necessary to optimize maintenance process for maintenance cost reduction and more effective maintenance. For this, it is important to develop a reasonable settlement progressive model of ballast layer. However, the behavior of ballast is different to that of soils, since ballast is composed of large coarse gravel. Thus, in this study, we carried out numerical analysis by using the discrete element method (PFC 2D) for better understanding of ballast settlement and development of reasonable settlement progressive model. And, we evaluated the settlement of ballast according to particles shape, porosity and loading conditions.

Numerical Analysis of ballastbed stress distribution depending on the grain size distribution (도상자갈 입도분포에 따른 도상응력분포에 관한 수치해석적 연구)

  • Kim, Dae-Sang
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.85-91
    • /
    • 2003
  • 본 연구에서는 원과 선분을 이용하여 복잡한 형상의 입자를 표현할 수 있는 2차원 개별요소법(DEM) 알고리즘에 3종류(균등분포, 정규분포, 대수정규분포)의 입도분포를 구현할 수 있도록 하였다. 개발된 프로그램을 이용하여 다양한 반지름을 갖는 원형요소를 구현하고 도상자갈을 원하는 입도분포로 모델링할 수 있었다. 그리고 우선적으로 균등분포에 대하여 변위제어 하중 재하 방식에 의하여 도상으로부터 노반으로 전달되는 응력을 파악하였다.

  • PDF

Experimental Study on Characteristics of Track Settlement Depending on Components of Ballast Track (자갈도상 궤도 구성품에 따른 궤도 침하 특성에 대한 실험적 연구)

  • Kim, Man-Cheol;Bae, Young-Hoon;Lee, Si-Yong;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.498-505
    • /
    • 2016
  • As a basic study to develop maintenance-effective optimal ballast track in preparation for upgrading a conventional line to a high speed railway, a full-scale test that combined the components of ballast track was conducted and the characteristic of track settlement was analyzed. As a result of the full-scale test, reduction in maintenance via an increase of the elasticity of only the pad was insignificant; however, the effect increased significantly with increasing of the weight of the sleeper or with increasing of the weight of the sleeper and the thickness of the ballast together with use of a pad with high resiliency. An optimal type of ballast track, in line with upgrading the speed of a conventional line, shall be developed through cost efficiency analysis considering the maintenance cost depending on the track settlement as well as the initial construction cost.

Building of Large Triaxial Testing Apparatus and Static Triaxial Testing for Railway Ballast (대형삼축압축시험장비 구축과 도상자갈의 정적압축시험 평가)

  • Lee, Sung-Jin;Kim, Yun-Ki;Lee, Il-Wha;Lee, Jun-S.;Park, Jae-Jun
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.84-91
    • /
    • 2010
  • We built multi-purpose large triaxial testing system that can test and evaluate various geotechnical design parameters such as shear strength, deformation modulus and stress-strain behaviour for large diameter granular materials, which are the most commonly used construction materials in the railway, road embankments. The details of the built testing system and the results obtained from static triaxial test carried out for gneiss ballast material are discussed within the scope of this paper. Ballast is hardly saturated and is confined at low overburden pressure, since the depth is shallow and the permeability is very high. Herein we ascertained that the confining pressure can effectively be controlled by vacuum. The rational trend could be checked up through triaxial test results such as shear strength, deformation, and particle breakage. And the shear strength envelope could be non-linearly represented with the parent rock strength, confining pressure of the triaxial test and proper parameters.