• Title/Summary/Keyword: 철도통신

Search Result 453, Processing Time 0.024 seconds

Improvement of the Railroad Signalling Equipment using GPS and Wireless Telecommunication (GPS 및 무선통신을 이용한 철도신호설비 기능향상)

  • Choi, Kyu-Hyoung;Choi, Dae-Seob
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.460-462
    • /
    • 2004
  • This paper gives a basic data of improving the performance of railroad signalling equipment by adopting GPS and wireless telecommunication technologies. These approach enable the moving block control of train, which can optimize train operation by reducing the distance between trains and maximize the railroad capacity. These method of detecting train position and controling train movement can also improve the train route control at stations.

  • PDF

Commucation line electric power induction and searching examination of an animal damage around rapid-transit railway (고속철도 주변 통신선로 전력유도 및 동물피해 원인규명)

  • Yeo, Sang-Kun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.91-96
    • /
    • 2006
  • This paper shows quantatively the cause of electric power induction that was occured by flowing current when high speed electric car travels and the investigation of earth potential upswing and animal damage example by rail leakage current.

  • PDF

Fault Location Estimation Algorithm in the Railway High Voltage Distribution Lines Using Flow Technique (반복계산법을 이용한 철도고압배전계통의 고장점표정 알고리즘)

  • Park, Kye-In;Chang, Sang-Hoon;Choi, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.2
    • /
    • pp.71-79
    • /
    • 2008
  • High voltage distribution lines in the electric railway system placed according track with communication lines and signal equipments. Case of the over head lines is occurrence the many fault because lightning, rainstorm, damage from the sea wind and so on. According this fault caused protection device to wrong operation. One line ground fault that occurs most frequently in railway high voltage distribution lines and sort of faults is line short, three line ground breaking of a wire, and so on. For this reason we need precise maintenance for prevent of the faults. The most important is early detection and fast restoration in time of fault for a safety transit. In order to develop an advanced fault location device for 22.9[kV] distribution power network in electric railway system this paper deals with new fault locating algorithm using flow technique which enable to determine the location of the fault accurately. To demonstrate its superiorities, the case studies with the algorithm and the fault analysis using PSCAD/EMTDC (Power System Computer Aided Design/Electro Magnetic Transients DC Analysis Program) were carried out with the models of direct-grounded 22.9[kV] distribution network which is supposed to be the grounding method for electric railway system in Korea.

The Estimation of the Regional Gross Capital Stock in Transport Sector of Korea (교통부문의 지역별 자본스톡 추정)

  • 하헌구;조희덕
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.6
    • /
    • pp.45-56
    • /
    • 2002
  • In this research we estimated regional gross fixed capital stock of transport sector, such as road railroad, airport and seaport during 1968-1997 in Korea. We also compared our estimation results with those of Korea and Japan. As basic analytic method, we used the regional allocation method. To estimate regional gross fixed capital stock of transport sector, we used the basic data on national wealth surveys in 1997, regional land price index and regional facilities index in transport sectors. We used the most reasonable data in the process of estimation after reviewing the collected data In order to get the reasonable capital stock by regions. we chose the allocation index which can minimize the difference between the estimated result and the real regional capital stock in the process to allocate the total gross capital into the regions. Compared our results with those of other researches in Korea, estimates in our research project could be said more accurate than those.

Study on Test methods and Procedures of Hybrid Track Circuit (하이브리드 궤도회로 시험방법 및 절차에 관한 연구)

  • Kwon, Bu-Seok;Jung, Ho-Hung;Lee, Key-Seo;Li, Chang-Long
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.9 no.3
    • /
    • pp.335-342
    • /
    • 2014
  • In this paper We study on test methods and procedures for Hybrid Track Circuit's practicalization. It's possible to apply to HTC's Seoulmetro and high-speed train by proposing test method considering special rail environment and RFID tag and leader, antenna We also present the test methods and procedures for safe and reliable of interface among the Hybrid track circuit devices.

IoT based Urban Underground Utility Monitoring and Management System (사물인터넷(IoT) 기반 도시 지하매설물 모니터링 및 관리시스템 기술)

  • Jun, J.A.;Lee, J.H.;Chin, C.H.;Choi, C.H.;Lee, S.J.;Yum, B.W.;Lee, I.H.
    • Electronics and Telecommunications Trends
    • /
    • v.30 no.5
    • /
    • pp.28-38
    • /
    • 2015
  • 최근 빈번히 발생하고 있는 도심지 내 지반침하의 주된 원인은 지하공간의 난개발, 상하수도 시설의 노후화, 이로 인한 급격한 지하 수위의 변화에 기인한다고 알려져 있으며 이에 대한 실시간 모니터링 및 종합적인 상관성 분석을 통한 사고예방이 시급한 실정이다. 지하공간의 특수성으로 인해 광역 지하공간 정보를 실시간으로 수집하여 모니터링할 수 있는 기술이 부재한 점과 이로 인한 지하공간의 위험도 분석과 과학적 재난대응 시스템 구축에 어려움이 존재한다. 본고에서는 도시 지하공간 내 지하매설물(상하수도)의 상태와 지하공간상황(도시철도구조물, 지하수, 지반변형)을 실시간으로 모니터링하기 위한 도메인별 기술개발 동향에 대해서 정리하고, 수집된 정보의 종합적 분석을 통한 지하공간의 이상 징후를 사전감지, 예측, 대응하기 위해 도전하고 있는 기술적 이슈들을 살펴보고자 한다.

  • PDF

Design of AVTMR system and Evaluation of RAM (Reliability, Availability, Maintainability) (AVTMR 시스템의 설계 및 RAM 평가)

  • 김현기;이기서
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.12B
    • /
    • pp.2016-2024
    • /
    • 2000
  • 본 논문에서는 결함의 영향을 받지 않고 동작할 수 있는 AVTMR(All Voting Triple Modular Redundancy) 시스템을 개발하였으며, MILSPEC-217F에 기반을 둔 고장율을 계산하여 AVTMR과 SS(Single System) 시스템을 비교 및 평가하였다. 설계된 시스템은 MC68000을 기반으로 한 3중화된 다수결 보터(Triplicated Majority Voter)를 이용하여 시스템을 개발하였다. 본 논문에서는 시스템의 신뢰도(Reliability), 가용도(Avaliability), 유지보수도(Maintainability)를 마코브 모델(Markov model)로 평가하였으며, 또한 시스템의 MTTF(Mean Time to Failure)를 계산하여 시스템의 수명을 구하였고, 설계된 AVTMR 시스템이 SS(Single System)보다 전체 시스템 평가에서 우수한 특성을 가진다는 것을 시뮬레이션을 통해 알 수 있었다. 또한, AVTMR 시스템은 결함을 허용(Fault tolerant)하는 시스템 특성을 가지기 때문에, 인간의 생명과 관련된 철도 시스템, 선박 시스템이나 항공기 시스템에 적용될 수 있다.

  • PDF

Development of earth resistivity measurement by depth and autoanalysis device (지하심도별 대지고유저항 측정 및 자동분석 장치 개발)

  • Han, Myung-kwan;Kim, Young-ki;Lee, Myoung-rae;Byun, Ji-woong;Kim, Min-sung
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.412-413
    • /
    • 2015
  • 대지고유저항은 전력 및 통신설비의 접지설계 또는 송배전선로 및 전기철도의 전자기 유도전압을 예측계산하기위한 필수적인 요소로서 실측 후 분석결과에 의해서 정의되므로 대지고유저항 측정 및 분석결과의 정확도는 접지설계 및 유도전압 계산의 정확도와 연관성이 높다. 따라서 전기안전 및 통신품질의 고도화를 위하여 대지고유저항 측정 및 분석이 중요하다. 현장에서 측정분석이 가능하고 간편하게 측정할 수 있는 국산 측정기를 개발하게 되었다.

  • PDF

A Study on the EMU Maintenance System using Wireless Communication (전동차 유지보수를 위한 무선통신기술 활용방안에 대한 연구)

  • Ahn, Tae-Ki;Park, Kee-Jun;Lee, Ho-Yong;Kim, Gil-Dong;Han, Seok-Yun
    • Proceedings of the KIEE Conference
    • /
    • 2003.04a
    • /
    • pp.423-425
    • /
    • 2003
  • 철도차량의 유지보수 분야에서 시간, 인력 등의 낭비요소를 제거하기 위한 효율적인 유지보수 업무를 수행할 수 있는 정보화시스템의 도입이 요구되고 있다. 그러나, 정보화시스템을 구축한 후 잘못된 정보의 입력, 이중 작업 등이 발생하면 또다른 시간적, 인적손실을 발생시킬 수 있다. 이를 방지하기 위하여 차상정보 수집을 위한 시스템에 무선통신기술을 적용하여 기초정보수집에 소요되는 인적, 시간적 손실을 최소화 하고 전동차 검 수고에서 전동차를 검수할 때 작업조회에서 작업결과 등록, 부품신청/조회 등에 무선단말기를 이용함으로써 효율적인 유지보수 작업이 될 수 있도록 한다.

  • PDF

Design of LED Driving SMPS for Large Traffic Signal Lamp (대형 교통신호용 LED 구동 SMPS 설계)

  • Shin, Hyun-Yong
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.4 no.2
    • /
    • pp.123-129
    • /
    • 2009
  • In this study, SMPS to drive LED traffic signal light for the railroad and airport was designed and its electrical characteristics was measured. The output voltage, output current and its power efficiencies to the input voltage 8~12VAC and 8~16VDC were 6VDC, 1.85ADC and >70%, respectively. Also the power factors of the SMPS were above 0.75 in the AC input voltage range.

  • PDF