• Title/Summary/Keyword: 철도시설운영

Search Result 87, Processing Time 0.028 seconds

An Evaluation of Constitutional Factors of Logistics System under the Consideration of Environmental Changes (환경변화를 고려한 우리나라 물류시스템 분석요소 평가)

  • Yeo, Gi-Tae
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.2
    • /
    • pp.95-114
    • /
    • 2009
  • The aim of this paper is to evaluate weight and priority values for 'inner consisted factors' and 'outer requested factors' of logistics system using the AHP(Analytic Hierarchicy Process) method. As for analysis regarding inner consisted factors, the results were shown as follows: a road transportation (0.312) as first rank; a marine transportation (0.269) as second rank; a railway transportation (0.239) as third rank; an air transportation (0.118) as fourth rank, and a pipeline transportation (0.063) as fifth rank. In terms of analysis regarding outer requested factors, the results were came out as follows: an infrastructure (0.322) as first rank; a performance (0.206) as second rank; an information system (0.151) as third rank; a human resources (0.121) as fourth rank, a business environment (0.075) as fifth rank; a connectivity (0.073) as sixth rank, and a political environment (0.052) as seventh rank.

  • PDF

Development of Performence Reference Model for the Infrastructure Maintenance Management Information Systems based on Government Enterprise Architecture (범정부 EA 기반의 인프라 유지관리 정보시스템의 성과참조모델 개발콘텐츠 기술에 관한 연구)

  • Nah, Hei-sook;Choi, Won-Sik;Jeoung, Seong-Yoon;Seo, Myoung-Bae
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2012.05a
    • /
    • pp.423-424
    • /
    • 2012
  • 기존에 운영되고 있는 공공시설관리 시스템들을 효율적으로 관리하기 위해서는 유지관리 모형이 표준화되어 범정부EA 지원시스템에 목표아키텍처로 등록되고 더 나아가서는 범정부 표준시스템으로 만들어 필요한 기관에 보급할 필요가 있다. 이 연구에서는 도로, 터널, 철도 등 인프라 시설관리 정보시스템을 구축하는데 필수적인 성과참조모델을 범정부EA 관점에서 제시하였다. 제시한 참조모델을 기준으로한 자산관리모형 아키텍처 모습이 GEAP에 등록 관리 된다면 이것을 바탕으로 타 기관에서 향후 정보시스템을 구축할 때 사전에 파악하고 활용하도록 제안 할 수 있을 것이다.

  • PDF

A Study of the Effect of the KTX Mulgeum Station Stop on Railroad Users in Yangsan City (KTX 물금역 정차 확정이 양산시 철도 이용자에게 미치는 영향에 관한 연구)

  • Choi, Yang-Won;Jang, Jae-Suck;Suh, Jeong-Yeal
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.527-536
    • /
    • 2022
  • The purpose of this study is to predict changing traffic environments and related economic effects by reflecting the changed KTDB and socio-economic indicators pertaining to Mulgeum station, a general railway stop, when it is confirmed as a KTX stop. To analyze the data of this study, socioeconomic indicators and the general status of transportation facility operations were investigated with reference to related statistical data, centered on the country overall and on Yangsan city in particular. In addition, we investigated and referenced the railroad facility construction plan and train operation plan, which are national high-level plans related to land development and transportation network construction. Currently, there are only ITX trains (4 times/day) and Mugunghwa trains (29 times/day) that stop at Mulgeum station in Yangsan, meaning that passengers cannot use KTX trains in the Yangsan area. In particular, the need for a KTX stop at Mulgeum station has been continuously raised because train users in the Yangsan area have inconvenient transportation in that they must travel 40 minutes to Ulsan station or 30 minutes to Gupo station to use the KTX. As a result of analyzing railroad transportation demand that will change in the future as the KTX stop at Mulgeum station is confirmed, the number of passengers boarding and arriving at Mulgeum station is predicted to be 1,674 passengers/day by 2025. In addition, the numbers of train passengers that are converted from Ulsan and Gupo stations due to the stop at Mulgeum station are predicted to be 594 passengers/day boarding and 562 passengers/day arriving by 2025. In the future, if Yangsan citizens use the KTX Mulgeum station, the access time to Mulgeum station can be shortened to 22 minutes from 65 minutes, and it is predicted that the inconvenience of transferring between railroads will be resolved, with the waiting time for transfers reduced by up to a maximum of 40 minutes. Therefore, the economic effect of creating a KTX stop at Mulgeum station was analyzed to be B/C=1.823 when general railroad operating costs are not taken into account and B/C=2.127 when general railroad operating costs are considered. In conclusion, when using KTX trains to visit the Seoul Metropolitan Area, it takes 2 hours and 43 minutes to use Mulgeum station without using Ulsan station or Gupo station, which is considered to be very effective for reducing travel times and improving the economic feasibility of this development; it is also expected that Yangsan city will be able to improve accessibility and mobility to the Seoul Metropolitan Area by breaking free from the disgrace of being a remote location given its link to KTX in the future.

The Study for an Improved Methodology of Rail Investment Rating System (철도투자평가체계 개선방안의 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Jin, Hak-Ki
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2192-2204
    • /
    • 2011
  • Recently, The government is actively transit road-oriented Traffic System to the eco-friendly and high-efficiency railroad-oriented transportation system for the sustainable green growth. The second plan of Nationwide Railway Network which has been officially announced rearrange to integration, multi-core, open architecture country by the railway network and integrate to the one mega city that rink an important city in one hour 30 minute. But the railroad industry is disadvantageous when it compares with the road industry on the ground that railroad industry peculiarities(a cost-benefit analysis, an environment value, etc) have not reflected in the (preliminary) feasibility study for SOC industry. The government establish Improved methodology of Rail Investment Rating System and improved preliminary feasibility study in railroad project by introduction many content(analysis periods, rate of discount, the benefits of shortening of transit hours, the estimation of traffic accident reduction benefits, investment cost of vehicle substitution and operation and maintenance cost of high speed rail) about the Improved methodology of Rail Investment Rating System. This study is intended to consideration the key content that was included in the Improved methodology of Rail Investment Rating System. In addition, the points to be considered for additional study have been reviewed in this study. We hope we will carry out make a reasonable and objective Rail Investment Rating System and to perform the railway industry of the virtuous cycle such improvement plans are reflected at a hereafter railroad section.

  • PDF

A Study on the Improvement Plan for the Revitalization of Commercial Facilities in Railway Station Building - Focused on Ecute of Commercial Facilities of Railway Station Building in Japan - (철도 역내 상업시설의 이용 활성화를 위한 개선방안 모색 - 일본의 역내 상업시설 'ecute'에 관한 고찰을 중심으로 -)

  • Moon, Suh-hyun
    • Korean Institute of Interior Design Journal
    • /
    • v.26 no.3
    • /
    • pp.101-112
    • /
    • 2017
  • Based on an analysis of the characteristics of "Ecute" of the East Japan Railway Company (JR East) that planned the world's first large scale commercial facilities inside a ticket gate (paid-area including waiting room and platforms), the present study proposes a brand development of commercial facilities inside aged railway stations, where only basic railway business have been provided focusing on passenger transportation, by renewing the definition of railway commercial facilities and presenting a detailed planning and the direction of the operation system. A list of practical tasks that can be carried out in academia, planning and operation / management to facilitate the revitalization of the use of commercial facilities inside railway stations are as follows: 1) the setting of a wide scope for the revitalization of railway commercial facilities around the railway station focusing on private-funded stations in addition to existing stations; a setup of the direct scope of commercial development in the practical railway operation for passengers and stations in terms of external research, and a corresponding shift in thinking in terms of internal research 2) development of under used spaces such as the transfer area (Gongdeok Seoul Wangsimri Station are first target stations where more than four subway lines intersect) 3) brand establishment through improvement strategies for image and symbolism specialized for railway stations 4) rent of suitable business stores and layout of commercial facilities by analysis of passenger move pattern 5) development of commercial facilities which can attract customers by displaying various products, as well as finding a way to develop them in to a base facility that connects to local infrastructures 6) providing advertisement and management system for continual maintenance, and 7) brand specialization through unique storytelling and design plan that stimulates sensibility. The above study results can be utilized as a starting point for design brand awareness about commercial facilities in railway stations in Korea, which can be developed further to improve station image and passenger convenience, as well as to increase the revenue of railway businesses.

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF

A study on Marketing Analysis and Role Sharing for Busan Port (부산항의 마케팅 분석 및 주체별 역할에 관한 연구)

  • 허윤수;정태원
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.6
    • /
    • pp.17-30
    • /
    • 2002
  • 부산항은 컨테이너터미널 운영사별로 마케팅 전략 수립 및 마케팅 활동이 개별적으로 이루어질 뿐 항만 관련 유관기관(부산시, 부산지방해양수산청, 한국컨테이너부두공단, 부산본부세관)의 조화된 항만 마케팅 전략 및 역할이 수립되지 않은 상태이다. 따라서 본 연구에서는 부산항 활성화를 위한 각 주체별 활동 현황을 조사하고, 항만 이용자인 선사 및 포워더를 대상으로 마케팅 믹스(Mix, 4P: Product, Place, Price, Promotion)에 대한 설문조사를 토대로 부산항 마케팅 분석을 실시한다 이를 바탕으로 부산항이 동북아 중심항만으로 성장하는데 필요로 하는 부산항 관련 각 주체별 마케팅 관계 그리고 역할을 제시한다. IPA(Importance-Performance Analysis) 분석 결과를 살펴보면 전체 고객을 대상으로 평가했을 때 가격 믹스와 촉진믹스는 가장 중요도가 높은 것으로 분석되었으며 특히, 촉진믹스는 중요도는 매우 높으나 만족도가 낮은 것으로 분석되었다. 그러므로 마케팅 전략 수립 시 촉진 부문에도 높은 비중을 두어 선사들에게 공격적인 마케팅 활동이 요구된다고 할 수 있다. 부산항 관련 각 주체별 마케팅 역할에서 부산광역시는 부산지방해양수산청과 함께 촉진믹스에 중점을 두어야하고, 부산지방해양수산청은 촉진믹스 외에 가격믹스에서 항만 요율의 적절성과 경로믹스인 철도 수송 망의 확보가 시급한 것으로 나타났다. 한국컨테이너부두공단은 촉진믹스 외에 가격믹스에서 항만시설 사용료의 체계적인 개편이 요구되고, 터미널 운영사는 제품믹스 서비스인 공컨테이너의 효율적인 재고관리 업무서비스와 가격믹스에서 하역요율의 탄력적인 제공이 필요하다.

Economic Feasibility of An Extra Stop Need at Kimpo Metro Station of AREX Express Trains (공항철도 직통열차 김포공항역 추가 정차에 따른 타당성 분석)

  • Kim, Dong-Hwan;Lim, Kwangkyun;Kim, Sigon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.5
    • /
    • pp.1547-1552
    • /
    • 2014
  • AREX (Incheon Airport Railway Express) operates trains between Seoul and Incheon Airport. One type of trains stops on every 10 stations, and another only on the two end-stations which called an Express train. The passengers traveled on express trains are very small since there are only two stops, Seoul and Incheon Airport Stations. The passengers of express trains will be more attracted if the express train stops on the intermediate stops (Gimpo station) since Line #9 and Line #5 are connected to from Gangnam. An on-board survey was conducted to predict the potential demand in case the express train stops at the Gimpo station. Further the costs required to improve platforms of the station were estimated to figure out the economic feasibility against the demand increases. It analyzed 938 increases for the case of intermediate stopping on the same travel time condition and 1,299 increases for the case of extra stop with decreased travel time. The study concluded the latter case appears desirable in the stance of long-term while both cases are economically feasible.

The Creation of Ttukseom Pleasure Ground and Its Transformation to a Park (뚝섬유원지의 생성과 공원화)

  • Kim, Jeoung-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.1
    • /
    • pp.127-142
    • /
    • 2018
  • Ttukseom was once a suburban area that had a government horse ranch for national use and a naenogpo (area of royal farm land). During the Japanese colonial period, a pleasure ground was built at Ttukseom, and after independence, it has been used as a park through the process of urbanization. This study examines the creation of the Ttukseom Pleasure Ground and the process through which the pleasure ground were transformed to a park. This study also explores its landscape and cultural aspects. In the 1930s, Gyeongseonggwedo (京城軌道), a private railway company, built a pleasure ground at Ttukseom to attract passengers, according to the business model of Japanese railway companies, in which recreational areas were developed near railway routes. Mass media portrayed this area as a "rural landscape" in contrast to the city. The Ttukseom Pleasure Ground emerged as a popular summer resort for Gyeongseong citizens. At the same time, it was managed by Gyeongseongbu (京城府). The city of Seoul began to manage the Ttukseom Pleasure Ground following independence, and development plans for Ttukseom as a pleasure ground or a park were continuously drafted but never implemented. Even after Korea's independence, the operation and use of the pleasure ground did not change significantly from the colonial era. In the late 1980s, the Ttukseom Pleasure Ground became the Ttukseom Han River Citizen's Park, and the sandy beach of the Han River was removed. Nonetheless, the previous facilities and major activities such as an open-air swimming pool, camp ground, and areas for boat recreation remained as major park programs. When the urbanization of Ttukseom was completed, its idyllic image disappeared and it became a park instead of a pleasure ground. Since parks expand their programs, it can be concluded that by providing those kinds of programs, the Ttukseom Pleasure Ground transformed to a park.

The Study of Propulsion and Brake System for TTX(Tilting Train eXpress) (TTX 차량 견인제동력 산정에 관한 연구)

  • Lee, Su-Gil;Han, Seong-Ho;Han, Young-Jae;Song, Yong-Soo;Lee, Eun-Kyu;Lee, Young-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2004.04a
    • /
    • pp.281-283
    • /
    • 2004
  • 인구가 증가하면서 인간의 생활활동 범위가 증가되었고 이에 따라 운송시스템에 대한 수요가 크게 증대되고 있다. 그러나 물류 이동에 필요한 여러 가지 제반 시설은 이를 충족시키지 못하고 있으며, 이로 인하여 현재 국내의 물류수송효율은 최악의 상황에 직면해있다. 이로써 대용량의 수송능력을 담당하는 철도차량 운송 시스템에 대한 수요가 급증하게 되었다 따라서 이에 대비하고자 많은 신규 노선을 계획하고, 이와 함께 신설되는 노선에 대해서는 시스템 운영 효율의 극대화를 위해 노선별로 고속전철과 지하철, 경전철, 틸팅차량, 그리고 자기부상열차 시스템 등 여러 가지 방식이 검토 중이 있으며 차량에 가장 적합한 추진시스템을 설계하는 것이 차량의 성능에 크게 향상시킬 수 있다.

  • PDF