도시철도 건설현황 o '74. 8. 15 : 지하철 1호선 개통('71. 4. 12 착공) 3년 7개월간 지하철건설 중단 o '78. 3. 9 ∼ '84. 5. 22 : 지하철 2호선 건설 o '80. 2. 29∼'85. 10. 18 : 지하철 3,4호선 건설 4년 2개월간 지하철건설 중단(중략)
In pursuit of the Trans-Korea Railway (TKR) project connecting the Korean peninsular by a rail link, it is critical that the two railway systems in ROK and DPRK are comparable in criteria and standards. Yet, there is substantial divergence of the construction criteria between the two sides, which hinders from conducting the TKR project as well as the railway modernization of DPRK. In this regard, study and comparison of the criteria are a prerequisite for mitigating the hinderance. This study investigated the laws and regulations relating to the railway technologies and construction and in particular conducted a comparative analysis of both railway systems with a focus on railway facilities such as track, structures, electric power and signaling. The results of this study will provide a useful information for the improvement of existing lines and the construction of new lines in DPRK.
Rail로 세상을 연결하여 국민의 행복을 창조하기 위해 노력하는 한국철도시설공단(이사장 강영일)은 수서~평택 간 수도권 고속철도사업을 올해 안으로 완수하기 위해 노력하고 있다. 한국철도시설공단이 추진하는 수도권고속철도(수서~평택) 건설사업은 서울 강남의 수서역에서 출발하여 동탄역을 거쳐, 평택역에서 현재 운영 중인 경부고속철도와 접속하는 노선으로 총 3조7천억원이 투입됐다. 지난 2011년 착공하여 올해 말까지 완공할 계획으로, 대부분의 구간을 지하로 건설한다. 수도권고속철도가 건설되면 KTX 수서역 동탄역이 신설되어 서울 강남 강동권 및 경기 동남부 지역까지 KTX 수혜범위가 확대되고 수서에서 부산까지 2시간 2분, 목포까지 1시간 52분으로 운행시간이 크게 단축되어 이용객 증가는 물론 지역균형발전과 성장동력 확보에 기여할 것으로 예상된다. 본지는 수서역사와 율현터널 현장에서 한국철도시설공단 수도권고속철도건설단 건축설비부 신승섭 차장(기계설비 감독관)과 율현터널(제1공구) 기계설비를 시공 중인 (주)세화이엔지[대표 박현수] 윤한식 현장소장, 수서역사 기계설비를 시공 중인 (주)초록이노텍[대표 양기준] 홍승훈 현장소장, (주)서한종합건축사사무소 홍형창 기계부장(감리단)을 만나보았다.
In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.
Modern surveying techniques have been progressed to get the absolute position of a single coordinate system at any point on the earth with the advent of the Global Navigation Satellite System and One-stop digital equipment. In addition, as the speed of the railway has been increasingly faster, in determining the location of major facilities including the center of tracks, it is required to the sophisticated precision. The surveying of railway construction has applied the technical supports and procedures in accordance with the current requirements. In this study, the applicable guidelines of surveying on practical issues and alternatives would be examined, analyzed, and presented by using the empirical data of pilot areas in the process of design, construction, and the maintenance of railway.
오늘날 고성능의 소형 센서 및 무선통신 기술의 발달로 유비쿼터스 컴퓨팅의 실현이 가능하게 되었다. 미래의 스마트한 디바이스뿐만 아니라 무선통신이 가능한 USN(Ubiquito us Sensor network) 기술은 주변 현황을 인식하고 필요한 정보를 처리하여 현장건설 등에 피이드백 시킴으로써 보다 나은 건설 진행과정에 관한 파악과 설계변경 및 계획 등에 필요한 정보를 제공할 수 있다. 본 연구는 TinyOS 기반에서 운용되는 무선 통신에 의한 USN 기술과 그래픽 기반의 LabView 프로그래밍 기술을 융합하여 정보를 처리할 수 있는 일련의 인터페이스 방법을 구현하였다. 송수신된 데이터 처리 결과는 TinyOS 기반으로 동작하는 PC에 그래프 등으로 나타나도록 하였으며, 무선통신용 USN 기술과 융합된 그래픽 처리 기반의 마이크로프로세서 시스템의 장점과 편리성으로 건설현장의 진행과정파악 및 변경 등에 필요한 정보를 제공하며 건설현장 정보의 피이드백을 가능하도록 하였다. 그 결과, 철도건설 현장관리에서의 USN과 구조물의 정밀진단 및 관리에 매우 유용함을 입증하였다.
The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
/
v.28
no.6
/
pp.463-475
/
1999
산업과 생활수준의 향상에 따라서 도로나 철도 등의 기간산업에 대한 고속화 및 대용량화가 요구되고 있다. 특히 철도에 있어서는 선형의 직선화 및 복선화계획이 진행되면서 터널건설이 증가하고 장대터널이 요구되고 있는 실정이다. 이에 따라 철도터널의 환기 및 방재 시스템의 설계기법에 관심이 고조되고 있으나 현재의 국내 철도 터널은 대부분 오래 전에 건설된 것이며 또한 환기설비를 요구할 만큼의 장대터널이 없기 때문에 이를 고려하지 않고 있다. 그래서 국내의 철도터널 환기설계 기술은 미약한 상태로 현재 발주되는 대부분의 공사를 외국의 용역사의 설계에 의존하고 있는 실정이다.
김천시 및 경부고속도로를 통과하는 8-2공구는 고속철도구간 중 최고 난공사 구간중의 하나로서 (주)대우건설컨소시엄에 의해서 수행되었는데 건설초기 원가 절감과 공기완수라는 목표를 두고 전면적인 설계검토를 착수하였다. 교량구간이 전체 연장중 절반이 넘는 9.6km이므로 교량에서 대안 설계가 중점적으로 검토되었고 이에 따라 PSM(Precast Span Method)공법이 적용되었다. (토목학회지1999. 6.) PSM공법은 25m 경간이므로 도로, 철도등을 통과하는 구간에는 한계가 있어 50m 경간의 강합성교량을 적용하였다. (중략)
Property development along railway lines is a critical issue at present. Because various railway lines exist in most large cities, there are numerous properties and open spaces to be developed for communities associated with these lines. The active development of railway properties can be a means to resolve housing shortage problems in cities. In this first part of this paper, noise and vibration levels of an artificial area of land and apartment complex are measured and evaluated to derive a design strategy for vibration reduction purposes.
Virtual construction methodology enables to construct project facility from design phase to construction phase in 3D virtual environment. It is a technique that can solve problems of construction in virtual construction process. This study suggests some methodologies of virtual construction and developed a system for a railway station in Honam express railway project based on suggested methodologies. This study developed layout review and layer simulation functions. Those functions can improve the effectiveness of 3D simulation and the virtual construction system can be used as a verification tool for construction process of various construction projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.