Evaluation of Structural Stability of Tunnel due to Adjacent Excavation on Urban Transit (도시철도 인접굴착공사에 따른 터널구조물의 구조 안정성 평가)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.503-508
    • /
    • 2020
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, As a result of analyzing the track deformation level of the existing tunnel due to the excavation work adjacent to the urban transit, it was found that the evaluation criteria (allowed values) of conventional railways lines were satisfied. Based on the numerical analysis, it was analyzed that the results of the prediction of the tunnel structural stability of due to the excavation work and the level of the tunnel deformation occurring at the actual site could be approximated as closely as possible.

Analysis of Influences on the Coast Construction Facilities depending on Sea Level Rise (해수면 상승에 따른 연안 건설시설물의 영향 분석)

  • Park, Jun-Young;Bu, Yang-Su;Lee, Dong-Wook
    • Proceedings of the KAIS Fall Conference
    • /
    • 2009.05a
    • /
    • pp.825-828
    • /
    • 2009
  • 기후변화는 기상재해뿐만 아니라 지속적인 해수면 상승의 원인이 되고 있으며, 자연 생태계화 인간의 사회, 경제시스템 전반에 걸쳐 영향을 미치고 있으며, 건설분야도 이와 무관하지 않다. 특히 기후변화는 해수면 상승으로 이어져 사회기반시설인 항구, 연안도로, 철도, 빌딩 등과 연안산업인 석유 및 석유화학공장, 그리고 서비스업인 관광에 대한 위협으로 나타나고 있다. 이러한 해수면 상승은 토지 및 건물의 재산 가치 하락과 해수면 상승에 따른 보호비용 증대, 구조물의 급속한 노후화에 따른 유지관리비용의 증가뿐만 아니라 정치적 제도적 불안 및 사회동요 등을 유발할 수 있다. 우리나라의 경우, 지난 100년간 6대 도시 평균기온이 약 $1.5^{\circ}C$ 상승하였으며, 해수면(제주기준)은 40년간 22cm가 상승하였다. 특히 제주의 경우 매년 5mm씩의 해수면 상승을 보이고 있으며 이는 전 지구 해수면 상승률보다 3배 높은 수치이다. 본 연구는 해수면의 상승에 따른 건설분야의 영향을 분석하기 위한 선도적인 연구로서, 연구의 범위를 제주지역에 국한하였으며, 해수면 상승에 따른 영향 지역을 추출하고, 영향 지역 내 건설시설물 정보를 추출하기 위한 절차를 규명하였다. 본 연구 결과는 유지보수 및 시설물 이설에 따른 공사비 산출의 근거가 될 뿐만 아니라 관련 예산 확보에 대한 근거 자료로 활용될 수 있을 것이다. 향후 관련 지역의 유지보수 및 이설 공사비 정보의 추출 및 DB 구축을 통해 연안 건설 시설물의 이설에 따른 공사비를 예측할 수 있을 것이다.

  • PDF

A Fundamental Study of a Neo-Grouting Technology for the Decreasing of a Ground Disaster in a High Water Pressure Conditions (고수압 조건에서의 지반재해 저감을 위한 최신 그라우팅 시공관리 기술 기초연구)

  • Kim, Jin-Chun;Yoo, Byung-Sun;Kang, Hee-Jin;Kwon, Young-Sam
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.1
    • /
    • pp.9-16
    • /
    • 2014
  • In the high water pressure construction conditions, it is important that the failures and damages occurrence in the neighboring ground and impermeable prevention methods (design and construction) for a inflow of seawater into structures. Grouting construction markets include a subway construction, a railway construction, a mountain tunnel construction, a new & reinforced construction of river & reservoir levee with big budget per every years. but, there are economic loss about design and construction management parts because that management criteria is not accurate but depends on experiences. Even though grouting technology are using vitally in the major constructions of national levels, it is still serious about the low-reliability problems and the no-criteria problems. therefor the purpose of this study is that provides the fundamental research about the neo-grouting technology for the decreasing of ground disaster in a high water pressure conditions.

A Study on Improving Pricing Criteria for Post-Construction Evaluation (건설공사 사후평가 용역대가기준 개선방안)

  • Kim, Seok;Lee, Du-Heon;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.8
    • /
    • pp.661-670
    • /
    • 2016
  • In 2000, post-construction evaluation was introduced for the purposes to evaluate demand, cost, and construction period of public construction projects and to reduce errors of public order agencies. However, pricing guide of post-construction evaluation has not been established, which becomes a cause of quality degradation of post-construction service and conflict occurrence. This study suggests the pricing guide in the form of percentage of construction cost method and cost plus fee method based on data of post-construction evaluation. This study investigates the construction costs and service costs for post-construction evaluation and conducts the comparative analysis of 'percentage of construction cost method' and 'cost plus fee method.' The analysis result shows 'cost plus fee method' is more accuracy than 'percentage of construction cost method.' In particular, cost plus fee method includes various correction coefficients, such as distance, area, and integration, in order to reflect the project characteristics of each infrastructure, and suggests linear construction (roads, railways), nonlinear construction I (housing and industry complex), and nonlinear construction II (airports, seaports, dams, water and sewage).

Geo-Morphological Study of Sand Dune for Railway Project in UAE (UAE 내 철도프로젝트 수행을 위한 사막 사구의 지형학적 특성 연구)

  • Moon, Joon-Shik;Kim, Jae-Young;Lee, Seung-Bok
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.9
    • /
    • pp.17-22
    • /
    • 2012
  • Wind blown sand is expected to disrupt the operation of the railway as the presented railway project in this paper consists of large earthworks in extreme topography of the mega dune fields. For successful railway construction in sand dune area, effective mitigation measure is the most important factor to protect the track from wind blown sand. The effective mitigation measure requires an integrated consideration of the earthworks geometry and the direct control measures such as fence system. Basically there's no perfect measure protecting railway track from wind blown sand, and it would be more economical and effective to develop robust, deliberate maintenance program for track and direct control measure on the basis of geo-morphological study. The purpose of this study is to identify the large scale geo-morphological terrains and specific sand dune morphology in the project area in UAE and estimate the direction and migration rate for sand dunes with the local variations in prevailing wind directions by undertaking literature review, and aerial photographs, satellite images, and ground studies.

Damage Status of Turnout System with Wooden Sleeper of Concrete Track on Urban Transit (도시철도 콘크리트궤도 목침목 분기기의 손상현황)

  • Choi, Jung-Youl;Han, Kyung-Sung;Bong, Jae-Gun;Jang, Cheol-Ju;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.379-385
    • /
    • 2019
  • The purpose of this study is to investigate the damage status of wood sleepers on concrete track of urban transit at different locations and to analyze the causes of damages. In addition, the turnout maintenance history during the service period of about 24 years was analyzed in conjunction with the train passing tonnage and that was to compare the current repair history. The most frequent damage components were rail, tie plate, spike and wooden sleeper. And, the damage caused by the defect of the rail fastening system such as spike and tie plate according to the deformation of the wooden sleeper was analyzed as the main type of damage. As a result, the damage of track components of turnout system was on the increase because they are directly affected by the train passing tonnage. The supplementary points of the check sheet for current turnout maintenance were derived and the improvement proposal was suggested based on the research results.

Development of the Track System for a LIM Type Maglev (LIM 방식 자기부상철도의 궤도시스템 개발)

  • Yeo, In-Ho;Kim, Dong-Seok;Jang, Seung-Yup;Hwang, Sung-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.800-805
    • /
    • 2009
  • This paper proposes the track system with twin block sleeper for a LIM type maglev railroad. Because a LIM type maglev railroad is expected to be constructed in inner city, social costs can be required under construction. Accordingly, superstructure using precast plate was adopted and twin block sleeper which can be constructed together with precast plate was developed to reduce the construction period. To examine the structural safety of the proposed track system with twin block sleeper, the finite element analyses and the laboratory experiments were performed. Also, the workability of the proposed track system was investigated through the construction simulation test and construction experience in test bed.

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

현장탐방 - (주)성보엔지니어링 경상북도 본청 및 의회청사 기계설비공사

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.289
    • /
    • pp.64-71
    • /
    • 2014
  • 경상북도는 경상도 개도 700주년인 2014년 완공을 목표로 새로운 도청 청사를 경북 안동시 풍천면과 예천군 호명면 일원에 건설 중에 있다. 경북도청 이전사업은 지난 1981년 대구시가 직할시로 승격 분리되면서 경북도민의 자긍심을 세우기 위해 신비의 가야문화, 천년의 신라문화, 지조의 유교문화가 융합된 민족문화의 본산지이자 한국의 정신 및 문화수도를 계승하는 한편 새로운 천년을 준비하기 위한 사업으로 추진되었다. 이에 따라 경상북도는 지난 2008년 안동시 풍천면과 예천군 호명면 일원을 도청 이전 예정지로 정하고 기본계획 수립 및 설계 시공을 일괄발주(턴키)하여 2011년 2월 (주)대우건설 컨소시엄[대우건설 지분 50%, 풍림산업, 세원건설(구미), 우석종합건설(경주), 동일건설(문경), 주일건설(경산), (주)진영종합건설(포항) 등 6개 업체의 50% 참여지분]을 실시설계 적격자로 선정, 2011년 10월 첫 삽을 떴다. 경상북도는 오는 2027년까지 경북도청 행정타운을 중심으로 3단계에 걸쳐 주거, 산업, 교육, 레저 및 문화단지 등 10만명의 인구가 거주할 신도시를 건립할 계획이다. 또한 이 지역은 지리적으로 세계문화유산이자 한국 정신문화의 수도인 안동 하회마을과 가깝고 한국적 우아함을 느낄 수 있는 지역이자 중앙고속도로, 고속국도 및 철도 등이 관통하고 있어 도내 주변도시와의 연계성이 높아서 경북지역의 신성장 거점도시로 성장할 전망이다.