Verification Method for Quantity Takeoff Results of Concrete Works using Design Drawing Information (도면정보 기반 건축공사 콘크리트 물량산출 성과물 검증방안 개발)

  • Lim, Haejin;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.20-28
    • /
    • 2020
  • In construction project, an error in quantity information immediately leads to an error in the quotation, highly reliable quantity calculation is required for successful performance of a project. But there is a difficulty in the current situation for the person in charge to review all calculation sheets for quantity review as the quotation work has to be performed in a short period of time. Accordingly, it is thought that a review plan is required to secure reliability on calculated results and the review plan should be able to be carried out within insufficient quotation periods. In the present paper, it is intended to present a plan that enables quantity to be reviewed with the minimum number of persons within the shortest period of time through an algorithm of calculating a verification quantity. The suggested algorithm allows the result of quantity calculation work carried out earlier based on 2-dimensional drawing to be compared, not with an accurate quantity, but within an error range.

Development of Parametric BIM Libraries for Civil Structures using National 2D Standard Drawings (국가 표준도를 이용한 토목 구조물 BIM 파라메트릭 라이브러리 구축에 관한 연구)

  • Kim, Cheong-Woon;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.128-138
    • /
    • 2014
  • Development of infrastructure component libraries is a critical requirement for the accelerated adoption of BIM in the civil engineering sector. Libraries reduce the time for BIM model creation, allows accurate quantity take offs, and shared use of standard models in a project. However, such libraries are currently in very short supply in the domestic infrastructure domain. This research introduces library components for retaining walls and box culverts generated from 2D standard drawings made publicly available by MOLIT. Commercial BIM software was used to create the concrete geometry and rebar, and dimensional/volumetric parameters were defined to maximize the reuse and generality of the libraries. Use of the these libraries in a project context demonstrates that they allow accurate and quick quantity take offs, and easier management of geometric information through the use of a single library as to numerous 2D drawings. It also demonstrates the easy modification of the geometries of the components if and when they need to changed. However, the application also showed that some of the rebar components (stirrups and length wise rebars) do not get properly updated when concrete geometries are changed, demonstrating the limits of current software applications. The research provides evidence of the many advantages of using BIM libraries in the civil engineering, thus providing the incentive for further development of standard libraries and promoting the use of BIM in infrastructure projects.

Comparative Study on the Quantity Economic Analysis of Apartment Frames Using SDS Result of Dynamic Centrifuge Test at Pile Foundation (말뚝기초의 동적실험결과를 사용한 아파트 골조의 경제성 비교분석)

  • Kim, Sang-Yeon;Park, Jong-Bae;Park, Yong-Boo
    • Land and Housing Review
    • /
    • v.6 no.3
    • /
    • pp.147-152
    • /
    • 2015
  • Site coefficient and amplification factor of current domestic Seismic Design Code based on American Seismic Code, have no consideration for the domestic ground condition in which the base rock is normally placed within 30m form the surface. By previous studies, the measured spectral acceleration of the result of dynamic centrifugal test and analysis was smaller than the design spectral acceleration for the period over 1.5 sec. Accordingly, in this study structural analysis and design using dynamic centrifugal test result for pile foundation were achieved, and the quantity of concrete and reinforcement of wall frame was compared with each other. Comparison results of cost using KBC the design spectral acceleration of SC, SD site and SDS, the quantity of reinforcement using SDS for SD site was 17~23% smaller than using the design code SD site.

Evaluation of Inelastic Performance of a Reinforced Concrete Shear Wall-Frame System Designed by Resizing Algorithms (재분배 기법 적용에 따른 철근 콘크리트 전단벽-골조 시스템의 비선형 특성 평가)

  • An, Jin-Woo;Choi, Se-Woon;Park, Hyo-Seon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.5
    • /
    • pp.473-480
    • /
    • 2011
  • Recently, the resizing algorithms based on the displacement participation factors have been developed for sizing members to satisfy stiffness criteria. It is proved that this resizing algorithms made for utilizing worker's stiffness design are practical and rational due to the simplicity and convenience of the method. The resizing algorithm can be practically and effectively applied to drift design of buildings. However, the researches on the change of inelastic behavior by the resizing algorithm has been insufficient. To identify the effect on the inelastic behavior of buildings by the resizing method, this study used the reinforced concrete shear wall-frame example. Through the application of the resizing method, the weights of shear wall in the lower class and the weights of columns and beams in the upper class increased respectively. And the initial stiffness of the building increased and the ductility of the buildings had similar with that of the initial structure.

A Study on the Integrated Management System for Rebar Information in Building Construction (건설공사 철근정보관리 개선방안에 관한 연구)

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.99-106
    • /
    • 2005
  • With labor shortage and high-wage, the construction cost is rising and the construction-business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. Therefore, in this study, to improve many problems found in calculating rebar quantity for capital expenditure programming which is considered the beginning stage of rebar work. and to improve problems such as no grasping of rebar loss due to lack of systematic management in order/purchase stage and construction management stage, a rebar information-management-system was found and preyed. The relation database was designed for the rebar information management system by analyzing work process of a rebar manufacturing plant, as the rebar information that is necessary in a rebar manufacturing plant if similar to that of a purchasing department of general construction company. The Proposed rebar information management system was implemented in two large rebar production plants. The implementation of the proposed system showed that the system increased work efficiency, reduced the management manpower, and improved the project-integrated management

A Study on the Application of BIM for Reinforcement Concrete Structural Work (철근 콘크리트 공사에서의 BIM 적용 연구)

  • Ahn, Jae-Hong;Lim, Nam-Gi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.158-166
    • /
    • 2018
  • The application of the BIM for architectural and structural work accompanied many trials-and-errors on project based on BIM by this time Ten years have passed since BIM issued, but it is not activated. This study suggests ways to activate BIM for architectural and structural work. The reason for choosing the structure construction is as follows. Construction cost is a high proportion of structural construction cost. On the other hand, the number of related materials is small, and the first in the 3D modeling process is structure modeling. And build BIM-based Structural Database by quantity take-off. This study shows the applicability of BIM through practical cases. This study is expected to provide suggestion for the successful implementation of BIM-based projects.

Economic Analysis of a 5-Story RC OMRF Retrofitted with Modified Epoxy Mortar for Improving Seismic Performance (변성에폭시 모르터로 내진보강한 5층 철근콘크리트 보통모멘트골조의 경제성 분석)

  • Kang, Suk-Bong;Kwak, Jongman;Shin, Dongwoo;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.3
    • /
    • pp.207-215
    • /
    • 2014
  • As a reinforcement material for RC members, the modified epoxy mortar has been reported one of the superior materials since the material can improve the load capacity and the seismic performance of the RC members. However, there were few experimental studies and analytical research for improving seismic performance with the material. This study is to propose an effective reinforcement plan for RC Ordinary Moment Resisting Frame (OMRF) with the evaluation of seismic performance and economic analysis. For the objective, first, the load-deflection curve of a simple beam specimen was compared with the analytical results. Second, a 5-story RC OMRF structure was designed only for gravity load and the alternatives for seismic reinforcement were suggested. Third, pushover analysis was executed for evaluation of design coefficients and seismic performance of the structures. Finally, an effective reinforcement plan was suggested based on the results of quantity take-off and economic analysis. The findings of this study can be utilized as the basic data when the modified epoxy mortar is applied to practice for improving the seismic performance of RC members.

Hollow Reinforced Concrete Bridge Column Systems with Reinforcement Details for Material Quantity Reduction: I. Development and Verification (물량저감 철근상세를 갖는 중공 철근콘크리트 교각 시스템: I. 개발 및 검증)

  • Kim, Tae-Hoon;Lee, Jae-Hoon;Shin, Hyun-Mock
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.18 no.1
    • /
    • pp.1-8
    • /
    • 2014
  • The purpose of this study was to investigate the performance of hollow reinforced concrete bridge column systems with reinforcement details for material quantity reduction. The proposed reinforcement details have economic feasibility and rationality and make construction periods shorter. A model of hollow reinforced concrete bridge columns was tested under a constant axial load and a quasi-static cyclically reversed horizontal load. As a result, proposed reinforcement details for material quantity reduction were equal to existing reinforcement details in terms of required performance. The companion paper presents the experimental and analytical study for the performance assessment of hollow reinforced concrete bridge column systems with reinforcement details for material quantity reduction.

Development of Hollow Reinforced Concrete Bridge Column Sections with Reinforcement Details for Material Quantity Reduction (물량저감 철근상세를 갖는 중공 철근콘크리트 교각단면의 개발)

  • Kim, Tae-Hoon;Lee, Jae-Hoon;Shin, Hyun-Mock
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.17 no.3
    • /
    • pp.107-115
    • /
    • 2013
  • The purpose of this study was to investigate the performance of hollow reinforced concrete bridge column sections with reinforcement details for material quantity reduction. The proposed reinforcement details has have economic feasibility and rationality and makes construction periods shorter. A model of column sections with reinforcement details for material quantity reduction was tested under quasistatic monotonic loading. As a result, the proposed reinforcement details for material quantity reduction was were equal to existing reinforcement details in terms of the required performance. In the a subsequent paper, the an experimental and analytical study will be performed for the performance assessment of hollow reinforced concrete bridge column sections with reinforcement details for material quantity reduction will be performed.

Reinforced-Concrete Works Productivity and Influence Factor Analysis on Nuclear-Power-Plant Project (원자력발전소 건설현장의 철근콘크리트 공종 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-Ho;Kim, Kyoung-Uk;Ahn, Young-Chul;Oh, Jae-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.314-321
    • /
    • 2014
  • Nuclear power plant projects are being increased all over the world. The construction of nuclear power plants needs huge money and time, which makes conducting a detailed analysis of productivity through the whole process. Reinforced-concrete works productivity field data was collected for more than one year and analyzed from a nuclear-power-plant project in Korea. The productivities of formwork, rebar-work, and concrete pouring were $0.54m^2/man{\cdot}day$, $0.06ton/man{\cdot}day$, $1.98m^3/man{\cdot}day$, respectively. Moreover, it is revealed that 'Day of the Week' is a driver of the formwork activity and 'Overtime' is for all of the three. The results will be a great interest of industry personnel estimating time and cost of a new nuclear power plant.