Work Time Analysis of Rebar Fabrication Method in Beam Construction. (보 철근공사 조립공법별 작업시간분석)

  • Kim, Ju-Yong;Kim, Min-Ku;Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.8-9
    • /
    • 2019
  • The rebar work is a labor intensive construction work with a high labor cost ratio. It is difficult to manage the productivity, construction time, and safety of rebar work. The problem of productivity decreased in rebar construction is due to a lack of workers according to the aged workers. Partial prefabrication rebar can be an alternative solution to productivity decreased in rebar work. The characteristic of partial prefabrication method is that time consuming component such as stirrup of beam assemble in factory and others assemble in site. Therefore, in this study, the time required for each rebar assembly method is measured and analyzed to confirm the possibility of productivity improvement.

  • PDF

Flexural Behavior of Reinforced Ribs of Shotcrete for Various Configurations of Reinforcements (철근배근형태에 따른 철근보강 숏크리트의 휨파괴 거동특성 연구)

  • Park, Yeon-Jun;Lee, Jung-Ki;Noh, Bong-Kun;You, Kwang-Ho;Lee, Sang-Don
    • Tunnel and Underground Space
    • /
    • v.20 no.3
    • /
    • pp.169-182
    • /
    • 2010
  • H-beam and lattice-girder are the two most commonly used steel supports in domestic tunnels. Reinforced Ribs of Shotcrete(R.R.S.), which is frequently used in Scandinavian countries, is yet to be employed in Korea despite its advantages over H-beam or lattice girder in terms of economy and constructional efficiency. In this study, laboratory tests were conducted to determine the most suitable design of R.R.S in domestic tunnels. Various configuration of steel reinforcements including double layer of steel rebars were tested and compared. Reinforcement with H-beam and lattice girder were also analyzed. Results of this study can be of great use in selecting and designing of tunnel supports when the tunnel is excavated by NATM or Norwegian Method of Tunnelling(NMT).

Analysis of Bar in Coil's Application to Rebar Work (철근공사의 코일철근(Bar in Coil) 적용타당성 분석)

  • Lee, Hyun-Soo;Kim, Jae-Gon;Park, Moon-Seo;Kim, Hyun-Soo;Hwang, Sung-Joo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.106-117
    • /
    • 2012
  • The proportion of rebar factory manufacturing which has been settled down in Korea recently seems to increase because of their strength such as high decreasing rate of rebar loss and manufacturing accuracy and the external factors such as an increase of downtown projects and a decrease of skilled workers. However, factory manufacturing using straight rebars causes a certain amount of rebar loss and an environmental problem including $CO_2$ emissions. To solve these problems, Bar in coil (BIC) has been introduced; however its application is very rare because it has not been produced so far in Korea and manufacturing machines of BIC are very expensive. Also, although BIC's application is expected to expand due to its strengths, few analysis of its application has been conducted. Therefore in this study, analysis of the BIC's characteristics and the influence to the rebar manufacturing industry are conducted for the advancement of rebar work as a basic research. To achieve this, inquiry on the present condition of rebar manufacturing industry in Korea is implemented. Then, the validation of BIC's applications by aspects of industry and the analysis of stakeholders' economical profit and loss are conducted.

A Process Improvement in Building Constructions using Value Stream Analysis - Focused on slab works - (가치흐름 분석을 통한 건설공사의 공정개선방안 - 슬래브 공사를 중심으로 -)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook;Jang Chan-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.527-530
    • /
    • 2002
  • The purpose of this study is to present an improvement of the form work process. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Understanding of non-value adding activities in existing slab form work process 2) Process integration by value stream mapping 3) Effect analysis of time-cost reduction. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction.

  • PDF

A Study on the Algorithm for Framework Materials Calculation of the Reinforced Concrete (철근콘크리트조의 골조물량산출 알고리즘에 관한 연구)

  • Hong Chae-Gon;Kim Tae-Hui;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.359-362
    • /
    • 2002
  • The construction industry from the research about materials calculate automation became accomplished plentifully. Material price calculate with application in the CAD plan is more quicker and accurate than with existing handy work. It gives a many effect in development of the research and estimation program against material calculate production automation with application of the CAD. But material calculate production uses an estimate program from generally a framework construction and the material calculate production work becomes accomplished. A thesis of the material calculate production methodology about a part of materials boundary condition from material calculate production work of framework construction is the actual condition which is insufficient. From the dissertation which it sees standardize the concrete, a concrete form a each part of materials calculate method from framework construction material calculate production. It standardize a part of materials agree with a condition of material calculate methodology which from a each part of materials boundary condition.

  • PDF

A Study of the Development of Apartment's Structural Cost Saving Checklist through the Case Research (사례분석을 통한 공동주택 골조공사의 원가절감 체크리스트 개발에 관한 연구)

  • Lee, Kyeong-Seob;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.65-77
    • /
    • 2010
  • Our nation's housing construction is given much weight over 32% in 2007 and especially apartment is taking over 67%. If we put into construction environment consideration, we are having a trouble with price cap policy and the realestate recession due to the global economic crisis. So in order to get competitive power and supply of cheap apartment, the necessity of cost saving is increasing. This research collected the past constructed apartment project's cost saving examples which were influencing on the construction cost, quality and time. We analyzed collected cost saving datum and assorted these in compliance with classification system. By analysis of correlation among datum with exclusion and integration, we make a propose cost saving Checklist that will be a base data to give a chance to use in working level and other research.

Automatic Climbing System (코어벽체 거푸집 시스템)

  • 문인수
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.5
    • /
    • pp.27-30
    • /
    • 2002
  • ACS(Automatic Climbing System) 거푸집은 당 현장에서 코어 월 철근 콘크리트 공사시 사용되는 대형 거푸집으로써 상대 플로우 잭에 의해 자동으로 1개 층씩 상승되는 시스템으로 안전난간 및 안전발판을 설치하여 추락, 낙하재해에 대비하였으며 외부에 천막을 설치하여 비산먼지, 소음 등을 방지할 수 있도록 설치/운영 중이다. (그림 1)은 ACS 거푸집의 구성을 나타내었다.(중략)

Construction of Reinforced Concrete for Cheju Soccer Field (제주 월드컵 경기장 철근 콘크리트 공사에 대하여)

  • 이재범
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.3
    • /
    • pp.77-81
    • /
    • 2002
  • 경기장의 전체적인 설계 개념은 가장 제주다운 환경, 즉 자연환경을 그대로 유지하면서 가장 친근한 경기장을 표현하고자 (사진 2)와 같은 제주도 전역에 산재되어 있는 358개의 기생화산인 오름을(산굼 부리도 1개의 기행화산임) 형상화하여 표현하였다.(중략)

Case Study on Frame Work of Deck Floor in High Rise Apartments (고층 아파트의 데크층 골조공사 시공사례)

  • 이동환;권오홍
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.6
    • /
    • pp.96-101
    • /
    • 2002
  • 최근 들어 기술ㆍ설계능력의 비약적 발전과 부동산 수요증가에 따른 지가 상승 및 용지 부족으로 인한 부지의 효율적 이용 방안으로 각종 건축물의 대형화, 고층화, 다양화가 되어 고밀도 철근배근의 건축 구조물은 점차 증가하고 있는 실정이다.(중략)