A Study on the Development of Checklist for Safety Management of Frequently occured Accident Process in Steel Structural Work (철골공사 재해다발공정의 안전관리를 위한 체크리스트 개발에 관한 연구)

  • Hong Hyun-Seok;Yeo Seong-Jin;Jeong Young-Heun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.552-555
    • /
    • 2004
  • As the scale of building construction is larger and more complex, accident is increasing on the steel structure work process. But Safety-Inspection has been carried out through many other checklists in the workplace, it hasn't been used actively. Because checklist wasn't written at the level of specific work and applied scope is Insufficient. So, we must grasp accidental cause about detailed work for making safety management checklist accurately. For this study, we are confining a range to steel structure work of all the building construction. We will classify steel structure process into the detailed work for preventing accident. And we will grasp accidental cause about detailed work for developing the checklist in the future.

  • PDF

A Work Process Model for a Quality Management in Steel Frame Work (철골공사의 품질관리 업무 프로세스 모델 개발)

  • Kim, Jong-Seong;Kim, Hyoung-Joong;Byun, Eun-Jung;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.150-158
    • /
    • 2007
  • As higher and bigger buildings, steel structure is so for a basic building structure. Quality management of the steel frame work is started from pre plan phase. And classification and relation of works is very important in quality management. The purpose of this study is developing a quality management model for the better quality management in a steel frame work. This model consider a interrelationship of works and $input^{\circ}{\S}utput$ information, and based on the actual condition of current quality management.

A Study on the Productivity Analysis of Deck Plate Installation Work in Steel Structure Construction (철골조 데크플레이트 공사의 생산성 분석에 관한 연구)

  • Jeong, Se-Lim;Cho, Kyu-Man;Hyun, Chang-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.73-79
    • /
    • 2010
  • Deck plates have been widely used for steel framework due to their merits in terms of schedule reduction and work repetition. For this reason, most of the previous studies related to deck plates have focused on the development of form type and their constructability. In this study, through an actual case study and interviews with experts, a simulation model was developed using the CYCLONE method. Based on this model, this study not only analyzed the productivity of the work process of the deck plate in steel framework, but also identified the occurrence of idle time in the work process. In addition, using a sensitivity analysis, productivity and duration could be analyzed according to variation of input resources. Based on the results, this paper suggests a way to improve the productivity of deck plate work in steel frameworks. Using the model, it is expected that project managers would be able to predict the productivity and total duration of the deck plate work in the early project phase, which will enable managers to make an appropriate plan for input resources.

A Case Study on Controlled Explosive Demolition of Steel Frame Structure Using Charge Containers (장약용기를 이용한 철골구조물 발파해체 사례)

  • Park, Hoon;Nam, Sung-Woo;Suk, Chul-Gi
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.91-92
    • /
    • 2023
  • 본 논문에서는 노후화된 화력발전소를 해체하고 원래의 자연환경으로 복원하는 공사가 진행되는 가운데 화력발전소 내 대형 철골구조물 중 하나인 터빈동을 발파해체공법을 적용하여 해체한 사례이다. 두께 30mm의 철골 부재를 절단하기 위해 금속제트가 발생되는 전용 장약용기를 제작하였으며, 철골 부재의 두께가 30mm 이상인 일부 철골 부재의 경우에는 가우징을 이용하여 사전취약화를 실시하였다. 또한 구조물 내부에 있는 일부 철골 부재에 대해 kicker charge를 사용하여 붕괴거동에 영향을 미치지 않도록 하였다. 발파에 사용한 전체 장약량은 175kg, 전자뇌관 165개, 장약용기 124개를 사용하여 계획된 방향으로 점진붕괴되었으며, 주변 시설물에 피해 없이 발파해체를 완료하였다.

  • PDF

A Study on the Influential Factors on Decision Making of Frame Construction Scheduling For Automated Construction (건설자동화를 위한 철골 공사 계획의 의사결정 영향요인에 관한 연구)

  • Choi, Jeong-Phil;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.209-212
    • /
    • 2009
  • During the last few decades, several companies and research laboratories have developed construction robots in an effort to improve productivity, quality, and reduce construction time and safety concerns. Recently, domestic construction industry is also interested in developing the construction robots. However, the studies on the research and development process is impossible in real field. A existing research's object is the development of the research on the assumption that construction's environment is a fixed form, But real construction's environment is very dynamic and atypical. So it is very difficult that we apply construction automation and robots. In order to solve this problem, this study deduce influential factors on decision making of frame construction scheduling for automated construction.

  • PDF

A Study on the Process of Tower Crane Construction Planning in Steel Structure (철골공사에서의 타워크레인 양중계획 프로세스에 관한 연구)

  • Jung, Deok-Gi;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.145-146
    • /
    • 2011
  • Lifting plan in conjunction with the overall construction plan will be established. It is being created by executive director of the Corporation and other such as an experienced site manager. But, written lifting plan based on the limited information and experience is causing some problems such as decreasing productivity, workability loss, delay. The reasons for the problems are lack of prediction of construction execution, inappropriate materials on the past performance, individual experience, limits of knowledge, lack of technical materials, shortage of advisor. Therefore, to solve the problems, we have to overcome the situation in which we depends on lifting planner's experience and intuition, limited information by accumulating objective and reliable materials. Because unorganized lifting plan will lower efficiency of lifting equipment and make reducing construction period difficult. In this study, influence factors on lifting plans will be derived through reviewing literatures and lifting plan cases. Derived influence factors will be classified as components and classes, classified influence factors are assessed suitability. Also, Decision making items are derived from the factors. Finally, tower crane lifting plan process will be suggested from the result.

  • PDF

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

A Study on the Structure Types and Concrete Strength Zoning of Domestic Tall Apartment Buildings (국내 초고층 주상복합 건축물의 구조시스템 유형과 콘크리트 강도 조닝 분석)

  • Kim, Sang-Yeon
    • Land and Housing Review
    • /
    • v.4 no.3
    • /
    • pp.295-301
    • /
    • 2013
  • In this study, cases of domestic tall residential buildings were investigated for the structural types, numbers of stories, total heights, type of lateral load resisting systems, and zoning of concrete strength. Based on these investigation data, the structural planning pattern of tall residential building was analyzed. SRC structure is main structural types of tall residential building at the initial stage of domestic tall residential building, but RC structure is substituted for main structural types since 2005. Retaining wall system is positioned at the core part of structural plan as a lateral load resisting system. Concrete strength zoning of vertical members like columns are divided by vertical heights of lower parts, middle parts, and upper parts. Basic data of structural planning of 40stories and 60 stories residential buildings was proposed based on case investigation.

Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.