• Title/Summary/Keyword: 채광부

Search Result 50, Processing Time 0.027 seconds

Tracepro Simulation Design and Evaluation for the Double Blind Light Pipe Daylighting System (Tracepro를 활용한 이중 블라인드 광파이프 채광 시스템의 블라인드 설계 및 시스템 효율 평가)

  • Kang, Eun-Chul;Lee, Euy-Joon;Yo, Seong-Yeon
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.6
    • /
    • pp.515-520
    • /
    • 2012
  • A daylighting system includes three parts; light collector, light transformer and light distributor. A DBLP(Double blind light pipe) daylighting system consists of a double blind light collector, a mirror duct type light transformer and a prism film light pipe distributor. The double blinds for a light collection are used to track the sun's altitude and azimuth movements throughout the day. Behind both sets of blinds is the light transformer, which is based on a rectangular cone shaped light duct. The light transformer was designed to efficiently deliver the light into the light pipe within a 30 degree radial spread for the efficient light into the distributor. In this study, DBLP system efficiency was simulated, evaluated and optimized by Tracepro as a popular ray trace light design simulation program. The results indicated that DBLP system efficiency evaluated a maximum 22.4% in case of Spring/Fall season solar noon time. While the overall average system efficiency in the morning and afternoon is evaluated about 10%.

NPS Pollution Loads from Coal Mining in Korea (석탄광산 작업장의 비점오염부하 유출특성)

  • Shin, Min-Hwan;Choi, Young-Hoon;Kim, Ki-Chul;Seo, Ji-Yeon;Lim, Kyoung-Jae;Choi, Joong-Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.779-784
    • /
    • 2008
  • 환경부에서 추진하고 있는 토지피복 중분류별 비점오염부하원단위를 산정하기 위한 사업 중 나지로 분류되는 채광지역의 비점오염부하를 측정하였다. 비점오염부하는 강원도 삼척시 도계읍의 도계 작업장(석탄)과 태백시 장성동의 태백 저탄소 등 2곳의 채광지역에서 2007년 9월부터 12월까지 2회의 강우유출사상을 대상으로 측정하였다. 2회 강우사상 동안 총강수량은 도계 작업장에서 149 mm이었으며 태백 저탄소에서 201 mm이었다. 유출량은 수위계와 유량계로 5분 단위로 측정하였으며, 수질시료는 자동채수기로 2시간 간격으로 채취하였다. 수질시료는 환경부의 공정시험법에 따라 SS, BOD, CODcr, T-N, T-P, 그리고 TOC 농도를 분석하였다. 그리고 일부의 시료에 대해서는 Zn, Cb, Cu, 그리고 Pb의 농도를 분석하였다. 도계 작업장의 유량가중평균농도는 갱내수의 수질에 많은 영향을 받는 것으로 나타났다. 도계작업장의 일평균유량가중평균농도는 SS $86.3{\sim}94.9\;mg/{\ell}$, BOD $3.8{\sim}7.6\;mg/{\ell}$, COD $26.9{\sim}51.6\;mg/{\ell}$, T-N $1.5{\sim}2.1\;mg/{\ell}$, T-P $0.2\;mg/{\ell}$ 그리고 TOC $1.8{\sim}2.3\;mg/{\ell}$로 나타났다. 태백 저탄소의 일평균유량가중평균농도는 SS $16.5{\sim}66.6\;mg/{\ell}$, BOD $7.4{\sim}9.8\;mg/{\ell}$, COD $41.1{\sim}66.7\;mg/{\ell}$, T-N $0.7{\sim}1.1\;mg/{\ell}$, T-P $0.2\;mg/{\ell}$ 그리고 TOC $1.7{\sim}2.6\;mg/{\ell}$로 나타났다. 중금속의 농도는 모든 시료에서 환경부의 배출허용기준농도보다 낮게 나타나거나 검출되지 않았다. 도계 작업장의 일오염부하는 SS $1,368.8{\sim}1,984.1\;kg/day$, BOD $56.6{\sim}128.9\;kg/day$, COD $385.7{\sim}933.7\;kg/day$, T-N $23.4{\sim}44.5\;kg/day$, T-P $2.1{\sim}4.8\;kg/day$ 그리고 TOC $24.3{\sim}39.3\;kg/day$이었다. 태백 저탄소의 일오염부하는 SS $8.2{\sim}162.1\;kg/day$, BOD $2.6{\sim}15.3\;kg/day$, COD $13.8{\sim}83.6\;kg/day$, T-N $0.2{\sim}3.1\;kg/day$, T-P $0.1{\sim}0.6\;kg/day$ 그리고 TOC $0.7{\sim}4.4\;kg/day$로 나타났다. 본 연구는 2회의 강우유출사상에 대하여 측정한 자료이므로 연평균농도나 연평균오염부하로 활용하기는 어렵다. 그러나 석탄광산지역의 비점오염부하를 이해하는데 활용할 수 있으며 또한 장기적인 연구자료로 활용하여 석탄광산지역의 비점오염원단위의 산정에 유용한 자료로 활용할 수 있다.

  • PDF

멕시코 로얄 은광산 잠재성 평가

  • Heo, Cheol-Ho;Kim, Ui-Jun
    • 한국지구과학회:학술대회논문집
    • /
    • 2010.04a
    • /
    • pp.108-109
    • /
    • 2010
  • IMPACT Silver 주식회사는 Zacualpan 프로젝트의 Royal Mines(이하 로얄 광산)을 인수했다. $124.5\;km^2$에 해당하는 지역의 소유권은 두 개의 멕시코 사기업으로부터 가행중인 광산의 채굴권 구입과 운영 중인 기반시설의 임대를 조건으로 한다. 프로젝트 지역은 멕시코시티로부터 남서방향으로 100 km와 Taxco Silver 광산으로부터 북서방향으로 25 km 떨어진 지점에 위치한다. 기반시설은 비포장 도로, 충분한 전력과 물의 공급 및 숙련공들을 갖추어 우수한 평가를 받고 있다. 소유권은 멕시코인의 개인소유 하에서 무한한 매장량 혹은 자원량을 갖고 운영된 채광과 가공시설을 인수하는 것이다. 소유권 지역을 대상으로 한 IMPACT Silver사의 주 탐사목적은 이미 알려진 광화대의 확장을 위한 잠재성 평가와 다른 지역에서 신규 광상의 유망지역을 발견하는 것이다. Zacualpan 프로젝트의 로얄 광산은 남동 Guerrero terrane의 북부에 위치한다. Teloloapan subterrane은 주로 저변성 녹색편암상으로 구성된 쥬라기 후기에서 백악기 초기의 화산성 퇴적층으로 구성된다. 대부분의 유망지역은 Lower Villa de Ayala층의 중성 내지 염기성 화산성 쇄설암을 모암으로 한다. 다상의 변성작용은 지역 전반에 걸쳐 나타나고, Zacualpan 광산지역에서 수반되는 광화작용을 규제한다. Zacualpan 광산지역은 Sierra Madre del Sur로 알려진 유망 광화대에 해당한다. 이 지역은 화산성 괴상 황화광상과 천열수 맥상광상이 우세하다. 대부분의 천열수 광화작용은 3.2-3.8억 년 전 마그마의 생성이 활발한 판구조 체제 동안 발생하였다. 역사적으로 가장 주요한 지역은 Lipton Vein이다. 현재 Zacualpan 지구에서 채광량은 은 200-500 g/t 정도로 보고되고 있다. 일부 지역은 고품위 은 광화작용(은 1,000 g/t 이상)을 수반하고 있으며, 이는 탐사의 주 타겟이 되고 있다. Zacualpan에서 은 광화작용은 은이 부화된 중유황 천열수 맥상광상으로 상당히 유명하다. Fresnillo, Pachuca 및 Taxco 광산을 포함한 멕시코 소유의 대규모의 잘 알려진 광산들이 이에 해당한다. 이러한 광산들은 부산물로서 금, 아연, 연이 생산된다. 이러한 광상들은 맥상과 각력상 및 산점상 또는 망상세맥의 형태로 산출된다. 광화작용은 석영과 탄산염 맥 내에 주로 황철석과 다양한 섬아연석, 방연석, 은 혹은 금 광물들을 수반한다. 경제성을 갖는 광화작용의 수직적인 연장은 평균적으로 대략 300 m이고, 멕시코 중부에 위치한 Fresnillo의 광화작용은 100 m에서 960 m의 연장을 갖는 것으로 알려져 있다. 아주 오랫동안 Zacualpan에서 광산관계자의 관측과 IMPACT Silver에서 최근 작업의 결과를 토대로, Zacualpan 광산지역의 탐사모델은 새로운 광상의 탐사를 위한 가이드로서 개발되었다. Zacualpan 광산지역에서 가장 높은 경제성을 갖는 광화작용은 북서와 남북방향의 맥 구조를 따라 수반된다. 이러한 맥 구조들은 종종 이 지역을 가로질러 수 km까지 추적되지만, 경제성을 갖는 광화작용은 맥 구조를 따라서 구조적으로 유리한 지역에서 부광대를 형성한다. 부광대를 형성하기 위한 가장 유리한 구조적 지역은 북서와 남북방향으로 발달한 맥 구조들이 교차하는 지역이다. 지난 30년간 채광된 주요 부광대는 폭이 2-6 m 이고 수평연장은 30-150 m 그리고 수직연장은 230-300 m에 이른다. 가장 높은 생산량을 보이는 부광대는 남북방향의 이차 맥들이 Guadalupe 광산의 Lipton 맥을 가로지르는 지역에서 발달한다. 남동쪽으로 현재 Compadres 광산의 Silver Shoot No. 1으로부터 고품위 은을 생산하는 지역은 북서방향의 San Agustin 맥이 북향의 Cometa Navideno 맥에 의해 절단되는 지역에서 산출한다. 모암은 광화작용을 규제하는 또 다른 중요한 요소이다. 광산지역에서 경제성을 갖는 모든 광화작용은 중성 내지 염기성 화산암 특히 안산암과 관련 모암에 배태된다. 부광대가 셰일 혹은 편암으로 전이되는 지역에서, 맥들은 소규모의 세맥으로 나뉘어 진다. Zacualpan의 전형적인 천열수 광상에서 부광대는 상부로 가면서 은의 함량이 증가하고, 하부로 가면서 연 아연의 함량이 증가하는 수직적 대상을 보인다. 금의 함량 변화는 보다 예측이 어려우나 상당히 중요하다. Zacualpan 광산지역의 탐사모델에 사용된 토양 채취, 정밀지도제작, 트렌치 및 시추탐광은 현재 IMPACT Silver사가 이 지역을 대상으로 한 가장 효율적인 탐사방법으로 입증되었다. Zacualpan 프로젝트의 로얄 광산은 하루 500 톤을 제련하는 기반시설과 수반된 채굴권을 갖는 가행 광산들을 포함한다. 현재 IMPACT Silver사는 두 곳의 타겟 지역에서 정밀지도제작, 토양 및 암석 채취, 12공 총 1866 m의 시추탐광에 의한 사전조사로 구성된 4 단계 탐사를 수행했다. 암석 1,953개, 토양 1,631 개, 389 개의 시추코어 시료가 채집되고 분석되었다. 이러한 작업은 추가탐사를 요구하는 수많은 유망 광화대를 규명했다. Compadres 광산에서 현재 가행중인 지하갱 시료는 레벨 1에서 0.9 m의 폭을 갖는 광체에서 은 680 g/t과 금 0.3 g/t, 레벨 3에서 1.67 m의 폭을 갖는 광체에서 은 12,591 g/t과 금 12.07 g/t의 품위를 갖는 것으로 나타났다. 레벨 1에서 3까지 2-3 m의 폭과 30-40 m 연장으로 채광되었다. 시추탐광은 고품위를 갖는 몇몇의 중첩된 맥을 발견했다. Compadres 광산에서 남동방향으로 200 m지점에 위치한 Soledad 지역에서 5 개의 시추공으로부터 동일 맥 시스템이 발견되었고, 고품위 부광대의 상부로 간주되는 몇몇 중요 지점이 발견되었다. 초기 단계의 탐사는 유망 시추탐광 지역인 중간정도 내지 고품위 유망 광화대를 규명했다.

  • PDF

A study on conceptual evaluation of structural stability of room-and-pillar underground space (주방식 지하공간의 구조적 안정성 평가개념 정립에 관한 연구)

  • Lee, Chulho;Chang, Soo-Ho;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.585-597
    • /
    • 2013
  • In this study, in order to evaluate stability of the room-and-pillar underground structure, a series of preliminary numerical analyses were performed. Design concept and procedure of an underground structure for obtaining a space are proposed, which should be different from structural design for the room-and-pillar in mine. With assumed material properties, a series of numerical analyses were performed by varying size ratios of room and pillar and then the failure modes and location at yielding initiation were investigated. From the results, relationship between the ratio of pillar width to the roof span (w/s) and overburden pressure at failure initiation shows a relatively linear relation, and the effect of w/s on structural stability is much more critical than the ratio of pillar width and height (w/H) which is a crucial parameter in design of the room-and-pillar mining. It means that roof tensile failure and shear failure at shoulder and pillar are necessary to be considered together for confirming overall structural stability of the room-and-pillar structure, rather than considering the pillar stability only in mining. Failure modes and location at failure initiation were varied with respect to the ratio of room and pillar widths. Therefore, it is necessary to simultaneously consider stability of both roof span and pillar for design of underground structure by the room-and-pillar method.

A study on lighting Diffusion system of Daylight Duct System (광덕트방식 자연채광 시스템의 산광부에 대한 연구)

  • Song, Kyu-Ryol;Park, Gyeong-Woo;Ryu, Han-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.99-104
    • /
    • 2011
  • Daylighting system is an alternative to the energy crisis and environment change. And it is possible improvement system of Architectural Space Environment. Accordingly, it is very useful system. Because Daylight Duct System of Daylighting System gives high performance for its price, distribution rate is very high. But Daylighting Duct System is hard to accurate control. Accordingly, it is difficult to maintain continuously Daylight Environment in Interior Spaces. Lighting Diffusion System has been developed that it is Applying the principle of Reflector and prism diffuser for maximize the efficiency of lighting of Daylight Duct Systems through this study. And then compare lighting performance of Existing System and new Lighting Diffusion System through producing a mock-up. Thus, this study was carried out for the purpose of verification for excellence. It is that installed Each Daylighting Duct System for performance evaluation in a laboratory of width 4m, length 10m, height 2.5m. And illuminance was measured at noon on winter solstice(December 22) under clean sky. The actual measurement result was in the following. Newly developed lighting Diffusion system was measured maximum illuminance 399, minimum illuminance 221, average illuminance 141. Synthetically, daylight factor, uniformity factor and illuminance distribution were improved more than existing system. As a result, it was confirmed that was improved lighting Environment in Interior Spaces.

  • PDF

A Study on the Stability Analysis of Underground Mine using LIDAR (LIDAR를 활용한 지하광산의 안정성 분석에 관한 연구)

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Jin, Yeon-Ho;Choi, Sung-Oong
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.406-421
    • /
    • 2017
  • This study describes a precise numerical analysis process by adopting the real image of mine openings obtained by LIDAR, which can produce a point cloud data by measuring the target surface numerically. Research area is a section of underground limestone mine which is used hybrid room-and-pillar method for improving the production rate. From the application of LIDAR to this section several results were deduced, that is, the central axis of upper and lower vertical safety pillars is distorted to the direction of NW and the section area of lower vertical safety pillar is $34m^2$ smaller than the designed area of $100m^2$. The results of precise measurement in geometrical shape of mine openings and precise simulation in numerical analysis confirms that LIDAR techniques can be suggested as a valuable tool for stability analysis in underground mine by configuring the mine opening shape.

Building Energy Savings due to Incorporated Daylight-Glazing Systems (통합 채광시스템의 건물 냉난방 에너지 성능평가)

  • Kim, Jeong-Tai;Ahn, Hyun-Tae;Kim, Gon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.19 no.6
    • /
    • pp.1-8
    • /
    • 2005
  • The quantity of light available for a space can be translated in term of the amount of energy savings through a process of a building energy simulation. To get significant energy savings in general illumination, the electric lighting system must be incorporated with a daylight - activated dimmer control. A prototype configuration of an once interior has been established and the integration between the building envelope and lighting and HVAC systems is evaluated based on computer modeling of a lighting control facility. First of all, an energy-efficient luminaire system is designed and the lighting analysis program, Lumen-Micro 2000 predicts the optimal layout of a conventional fluorescent lighting future to meet the designed lighting level and calculates unit power density, which translates the demanded met of electric lighting energy. A dimming control system integrated with the contribution of daylighting has been applied to the operating of the artificial lighting. Annual cooling load due to lighting and the projecting saving amount of cooling load due to daylighting under overcast diffuse sky m evaluated by computer software ENER-Win. In brief, the results from building energy simulation with measured daylight illumination levels and the performance of lighting control system indicate that daylighting can save over 70 percent of the required energy for general illumination in the perimeter zones through the year A 25[%] of electric energy for cooling and almost all off heating energy may be saved by dimming and turning off the luminaires in the perimeter zones.

Stability Analysis of Mine Drift for Explosive Welding (폭발압접에 대한 갱도의 안정성 분석)

  • Yang, Hyung-Sik;Jang, Myoung-Hwan;Jang, Hyong-Doo
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.55-62
    • /
    • 2010
  • Explosive welding was planed in a closed drift of a mine for its reuse. In this study, we analyzed the stabilization of roof and pillar which were expected to be affected by overpressure experienced during the continual explosive welding. Three equations, normal equation, CONWEP and DDESB, were used for the estimation of overpressure. The investigation shows that the continual use of the explosive welding in a drift may result in considerable damage on the drift.

Numerical Study on Vertical Stress Estimation for Panel Pillars at Room and Pillar Mines (주방식 광산의 패널 광주 수직응력 추정을 위한 수치해석 연구)

  • Yoon, Dong-Ho;Song, Jae-Joon
    • Tunnel and Underground Space
    • /
    • v.30 no.5
    • /
    • pp.473-483
    • /
    • 2020
  • This paper examines the vertical stress change concentrated on mine pillar which occurs due to the stress disturbance from opening excavation at room and pillar mine by FLAC3D, a finite difference method (FDM) software. The mesh size combination is decided with a careful consideration of relative error and run-time, then its performance is verified. A series of numerical analyses is conducted and the vertical stress at central pillar was observed for the test cases of 1×1 to 11×11 mine pillars, 40 m to 320 m depth with 40 m difference. The results show that the vertical stress of pillar approaches to the similar value with the value estimated by tributary area theory(TAT) when the development area (NP) is increased or the height of overburden (HOB) is decreased, while it is overestimated in the opposite case. Furthermore, it also represents that the vertical stress factor (VSF) converges to a specific value when the depth is increased whille keeping the development area identical.

Development of DHLT Joint for Vertical Cutoff Walls in Offshore Waste Landfill Site (해상처분장 연직차수공을 위한 DHLT 이음부의 개발)

  • Hong, Young-Ho;Lee, Jong-Sub;Lee, Dongsoo;Chae, Kwang-Seok;Yu, Jung-Doung
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.3
    • /
    • pp.43-56
    • /
    • 2018
  • Vertical cutoff walls such as steel pipe sheet piles (SPSPs) have been commonly applied for the construction of the offshore waste landfill site. Because the SPSPs are sequentially installed by connecting their joints to those of adjacent piles, their mechanical stability should be ensured against the inherent external forces on the sea. The objective of this study is to evaluate the structural performances of the newly developed types of SPSP joint compared with those of other joint types. The problems of the traditional SPSP joints are investigated, and an advanced joint shape of SPSP, which is named double H with L-T (DHLT) joint, are designed for improving the constructability and maintenance. Full-scale models of the DHLT joint are manufactured, and then its joint areas are filled with grout material. After 28 days of curing time, compressive and tensile strength tests were performed on the joint models and the test results were compared with those of the traditional joints. Experimental results show that the structural capacities of the DHLT joint models are lower than those of traditional joints due to the influence of grout and steel members. In the cases of the compressive strength test, especially, bending occurs on steel H-beam with no distinct cracks in grout due to the asymmetrical structure of joint which has no reaction force. This study shows that the performance of the SPSP joint can be improved by considering the influence factors on the structural capacities estimated by the experimental tests.