• Title/Summary/Keyword: 차세대 고속철도

Search Result 109, Processing Time 0.027 seconds

Running safety analysis of the high speed railway vehicle (HEMU-400X) (차세대 고속철도(HEMU-400X)의 주행 안전성 평가)

  • Sim, Kyung-Seok;Park, Tae-Won;Kim, Wook-Hyun;Choi, Ji-Hun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1862-1867
    • /
    • 2011
  • Recently, a railway vehicle of the maximum speed of 350km/h or more high speed has been developed in the developed country. The next-generation railway vehicle(HEMU-400X) is being developed for aim to run over 430km/h in Republic of Korea, too. The safety of the railway vehicle should be conformed before manufacturing the railway vehicle. In this study, the next generation high-speed railway vehicle was modeled as a single-car system using commercial dynamic program ADAMS/Rail. Safety analysis was implemented through the international standard of the UIC 518 OR code. Also, appropriateness of the railway vehicle design variable were conformed by safety analysis results.

  • PDF

A simulation study on predicting the current collection performance in 400km/h on establishing the maximum speed test plan of the next Korean high speed train development project (차세대 고속철도의 최고속도 시험 계획 수립을 위한 집전 성능 예측 시뮬레이션)

  • Kwon, Sam-Young;Park, Chun-Soo;Cho, Yong-Hyeon;Lee, Ki-Won;Park, Young
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.428-432
    • /
    • 2008
  • The next Korean high speed train development project is started. In testing stage of this project, the 400km/h maximum speed test will be conducted. In Korean railway infrastructure conditions the 400km/h seems to be a critical speed especially in the aspect of the overhead contact lines. The current collection performance of the 400km/h which is predicted by dynamic interaction simulation are described in this paper. To discuss the permissible criteria of contact forces, displacements and percentage contact loss, the French 575km/h current collection conditions are simulated. Furthermore, review of the simulation results of the Korean 400km/h current collection conditions is conducted through comparison with that of the French 575km/h.

  • PDF

Design of New Signaling System Test Bench for High Speed Rail (차세대 고속철도 신호제어시스템의 실험 기본설계)

  • 이종우;황종규;오석문;김영훈
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.315-321
    • /
    • 1999
  • The railway signaling system consists of microcomputerized vital devices on board and ground, which are connected to one another by track circuits, and interlocking equipment for route control, The software plays a major role in these microcomputer-based vital systems. Therefore it is important to design the software and validate the required levels of safety and reliability To verify the conditions and functions of signaling logic, the laboratory prototype test bench, which consists of personal computers, VME system and Ethernet LAN, will be developed. In this paper general design of signaling system test bench for high-speed rail is described and some developed subprogram is presented.

  • PDF

Case Studies on Smart Sensor Application for the Next Generation High-Speed EMU (차세대 고속철도(동력분산식)에 적용할 스마트센서 사례 연구)

  • Chang, Duk-Jin;Kang, Song-Hee;Song, Dahl-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1995-2005
    • /
    • 2008
  • Recently, the smart sensors and USN (Ubiquitous Sensor Network) technologies are emerging. Smart sensors add the capability of storing local temporary data, processing instant operations, transmitting information outward, to the simple sensing devices. The USN is a wireless network of sensor/smart sensors that can collect data anywhere anytime and exchange the data within the network. In this research, case studies are performed on the smart sensors and USN applications. The cases were grouped in four categories, domestic private, domestic public, foreign private, and foreign public. Based on that survey, promising applications will be proposed and developed to be implemented to the next generation high-speed EMU.

  • PDF

A simulation study on predicting current collection performance with respect to the contact wire tension in 400km/h test run of the next high speed train HEMU-400X (차세대 고속철도 최고속도 시험에서 전차선 장력 증가 단계별 집전 성능 예측 시뮬레이션)

  • Kwon, Sam-Young;Park, Chun-Soo;An, Seung-Hwa
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.201-206
    • /
    • 2009
  • In the testing stage of HEMU-400X(next Korean high speed train) developing project, maximum speed(400km/h) tests will be conducted. On present and near future conditions of the overhead contact lines, 400km/h is over the design speed criteria. The predictions of current collection performance including the percentage loss of contact(arcs level) parameter through dynamic interaction simulation of HEMU-400X maximum speed test run are described in this paper. Various simulations are conducted at the condition of two different contact wire tensions to draw the proper contact wire increasing values in the 400km/h test line under the available contact wire tension supporting condition of that line.

  • PDF

A Study On The New Intermittent Message Acquisition Board Using FPGA For Next-Generation High-Speed Rail (차세대 고속철도 증속 운전에 대응하는 불연속 정보 수신보드 개발에 관한 연구)

  • Han, Jae-Mun;Um, Jung-Kyu;Yang, Chan-Seok;Cho, Yong-Gee
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.351-355
    • /
    • 2009
  • There are two types of controller between railway and train. those are the Continuous Message Controller and the Intermittent Message Controller using for KHSR. The conventional Intermittent Message Controller board used a variable resister for setting the phase, but the variable resister affected some environmental facts, such as temperature, humidity, and vibration, etc. And It is requirement of reduction message processing time for speed-up operation in Next-Generation High-Speed Rail. This study suggests how to solve the problem described above. Using FPGA is quite profitable. It's easy to use and maintain, flexible with the New algorithm to fix up the problem.

  • PDF

Dynamic Behavior of Composite Steel Girder Bridge Exceeding Train Speed 350km/h (차세대고속열차 운행에 따른 호남고속선 강합성교의 동특성 분석)

  • Kim, Eunsung;Park, JongWoong;Sim, SungHan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.7
    • /
    • pp.3518-3527
    • /
    • 2013
  • The new developed train(HEMU-430X) faces running at high speed over 400km/h. But The Korea railway design code gives guidelines below 350km/h speed. Honam HighSpeed Railway was also designed based on the design standard below 350km/h. Existing infra structures have to be reviewed at high speed running and the design guideline for the speed over 350km/h should be prepared as soon as possible. This paper presents (1) the simulation results of composite steel girder bridge(Kaya Bridge of Seoul-Pusan HighSpeed Railway), (2) values measured at this bridge and the comparison with simulation results, and (3) the prediction of Yonjung bridge being constructed in Honam HighSpeed Railway.

The Parametric Study Effecting on the Fatigue Life of Rail on High Speed Railway (고속철도 레일의 피로수명에 영향을 미치는 매개변수 연구)

  • Park, Yong-Gul;Kang, Yoon-Suk;Go, Dong-Chun;Sung, Deok-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.396-404
    • /
    • 2009
  • With developing the next generation high speed railway, there need to be plans to make sure of running safety though researchs on the crack and break of rail by rolling contact fatigue. Therefore, this study performed the parametric analysis effecting on the fatigue life of rail using simplified equations. It analyzed the internal stress of rail according to the track quality, train velocity, wheel radius, track stiffness, sleeper space, wheel load. For the more, via the finite element method, it analyzed shear force on the rail head which could be changed by the early length of crack, angle of crack and temperature. As a result, this study continued the main parameter effecting on the fatigue life of rail.

A study on the Dynamic Behavior Enhancement of the Korean High-speed Train (고속열차의 주행동특성 개선에 관한 연구)

  • Jeon, Chang-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.81-87
    • /
    • 2017
  • This paper describes the dynamic behavior and enhancement of Korean high-speed trains. The tail vibration reduction method of the yaw damper installation method change, which was derived from previous research, was applied to the running test of high-speed train. In addition, the vibration reduction method for the entire vehicle was derived by a numerical method and its effect was confirmed by a running test. The improved design was applied to the double-deck high-speed train coaches and the commissioning proceeded without problems in dynamic behavior. Sensitivity analysis of the suspension parameters affecting the critical speed of Korean next-generation high-speed trains was performed and four design variables that greatly affected the critical speed were derived. These were in the order of the primary elastic joint x-directional stiffness, the secondary yaw damper series stiffness, the secondary lateral damper damping coefficient, and the carbody damper damping coefficient. By optimizing the design variables, the suspension parameter that improves the critical speed by 23.3% can be used in the commercial designs of Korean next-generation high-speed trains.

A Study on Strategical Penetration of the Korean High-Speed Train System into Chinese Market through the Technology Transfer (한국형 차세대 고속전철의 기술이전을 통한 중국진출 방안 연구)

  • Song Dahl-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.1 s.32
    • /
    • pp.36-42
    • /
    • 2006
  • Studied was a strategic plan for the Korean High-Speed Train system to penetrate the Chinese railway market in exchange of the technology of KHST. Firstly, taken was a glance at Chinese Government plans to extend total length of his railway lines and to construct the Beijing~Shanghai high-speed railway line. Then, disparity of railway technology in Korea and China was reviewed. From the review, SWOT Analysis were carried out to penetrate the foreign markets. Countermeasures to cope with SWOT were also considered. Strategical governmental supports and the establishment of the special organization to be in charge of penetration of KHST into foreign markets were proposed. Finally, also proposed was the transfer of KHST technology to Chinese counterparts in exchange of tangible benefits for Korean side. The benefits may include (1) adoption of KHST as the type of rolling stock for the Beijing~Shanghai line, (2) guarantee of participation in the project and royalty for the KHST technology used for the future high-speed railway line construction, (3) prior written approval and partnership when making its way to third country, and (4) participation of Korean construction companies in Chinese railway construction project, etc. Adoption of KHST in China indeed gives chance to integrate the high-speed railway network after reunification of Korean peninsular, and enhance the economic ties between two countries.