• Title/Summary/Keyword: 지질공학조사

Search Result 490, Processing Time 0.025 seconds

Remote Measurements of the Geological Structures, Using Photogrammetric Method (입체사진을 이용한 원거리 면구조 측정)

  • Hwang Sang-Gi
    • The Journal of Engineering Geology
    • /
    • v.15 no.2 s.42
    • /
    • pp.201-212
    • /
    • 2005
  • A photogrammetric camera system and a software have been built for capturing planned stereo images. To evaluate the system,25 planar data from a constructed rock slope were measured using both geological compass and photo system. Comparison of the data groups from both system showed matching relationship that falls within the error range of $5.25\pm4.53$ in strike and $3.18\pm3.17$ in dip angles, when the 2 standard deviation error distributions were considered. To evaluate the errors of the Photo matching and non planarity of the surface, orientations of the same plane were repeatedly measured 20times. These measurements showed error ranges of $8.2\pm3.4$in strike and $6.6\pm3.4$ in dip angle, considering the same error distributions. Measured strikes and dips were compared with the corresponding compass measurements in 5 constructed. slopes to test the system. Stereonet plots showed that the photo system measured data coincided well with the compass measurements. With these evaluations, the photo system can measure the planar structure in inaccessible locations with reliable accuracy at the same time reducing the data gathering period therefore resulting to an efficient geological survey.

Case Study on the Treatment of Acid Rock Drainage from an Embankment with Pyrite Rocks (황철석 암버럭을 이용한 고속도로 성토체의 산성배수 처리 사례 연구)

  • Gong, Jeong-Sik;Kim, Tae-Hyung;Song, Young-Suk
    • The Journal of Engineering Geology
    • /
    • v.31 no.4
    • /
    • pp.523-532
    • /
    • 2021
  • The treatment of acid rock drainage was reviewed and evaluated for the case of pyrite rocks distributed in a highway embankment. During the highway's construction, neutralization using alkaline water repellent was applied to the embankment section to prevent acid rock drainage. However, it still occurred long after the construction was completed owing to rain infiltration, and the acid rock drainage polluted the surrounding soils and streams. To solve this problem, treatment facilities such as SAPS (Successive Alkalinity Producing Systems) or ecological wetlands and sand filtration were installed. After the installation of the treatment facilities, the effluent and soils contaminated by acid rock drainage nearby the outlet of the facilities were analyzed and evaluated for a period of years. Measurements of the pH of the effluent and analysis of the heavy metal contamination of the soils confirmed that the neutralization treatment for acid rock drainage is being performed properly and that contamination of heavy metals in the acid rock drainage is also being stably controlled by the treatment facilities.

Characteristics of Large-Scale Fault Zone and Quaternary Fault Movement in Maegok-dong, Ulsan (울산 매곡동 일대의 대규모 단층대 특성과 제4기 단층운동)

  • Cho, Jin-Hyuck;Kim, Young-Seog;Gwon, Sehyeon;Edwards, Paul;Rezaei, Sowreh;Kim, Taehyung;Lim, Soon-Bok
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.485-498
    • /
    • 2015
  • Structural analysis for a large-scale fault in Maegok-dong, Ulsan, was carried out based on filed-works to investigate the geometric and kinematic characteristics of the fault as well as its Quaternary slip. As results, a series of repeated stratigraphy, minor faults, fracture zones, and deformation band clusters are observed over a distance of about 100 m in the first studied site consisting of sedimentary rocks, which may indicate the damage zone of a large-scale fault in this site. In the second site, mainly composed of granitic clastic rocks, a large-scale thrust fault is expected based on low-angle dipping faults showing branched and/or merged patterns. Age of the last slip on this fault was restrained as after 33,275 ± 355 yr BP based on radiocarbon dating for organic material included in the gouge zone. Dimension of fault damage zone, dominant sense of slip, and age of the slip event associated with the fault suggest that these structures have a close relationship with the Ulsan Fault and/or Yeonil Tectonic Line, which are well-known large-scale neotectonic structural features around the study area. Therefore, it is necessary to study the characteristics of the faults in detail based on structural geology and paleoseismology in order to ensure seismic and geologic stability of the buildings under construction, and to prevent geologic hazards in this area.

A State-of-the-Practice Review on the Management of the Domestic Geotechnical and Geological Information Data (국내 지질 및 지반조사 자료 관리 현황에 대한 실용적 고찰)

  • Jang, Yonggu;Jeon, Heungsoo;Chae, Deokho;Cho, Wanjei
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.4
    • /
    • pp.39-46
    • /
    • 2013
  • Recently, there have been various researches on the cost reduction and savings during the construction activities with the development of automation and computerized information system. Considering the cost savings during the construction, the development of the geological and geotechnical information system with high practical use becomes very important since the geologic and geotechnical data are required for the design of the various structures. Currently, the geological and geotechnical data are collected and distributed as a geological/geotechnical map or engineering geology map and map with other specific purpose through geoinfo system at Korea Institute of Geoscience and Mineral Resources, Korea Mineral Resources GIS at Korea Mineral Resources Corporation, Geotechnical Information Portal System at Korea Institute of Construction Technology, Geotechnical Information System at the City of Seoul and the Ocean Data Integration Material System at Korea Hydrographic and Oceanographic Administration. Furthermore, the information on the groundwater is monitored and collected via Integrated Ground Water Information Service at Korea Water Resources Corporation and Rural Groundwater net at Korea Rural Community Corporation. Therefore, in this study, the contents of the geological and geotechnical data collected from the above mentioned government organization are compared and the DB and distribution system with higher utilization are suggested based on the comparisons with those from other countries such as United States of America, Japan and Germany.

Effective Measuring Method of Discontinuity Orientation (불연속면 방향의 효율적인 측정 방안)

  • 김해경;고영구
    • The Journal of Engineering Geology
    • /
    • v.13 no.3
    • /
    • pp.321-334
    • /
    • 2003
  • This study is aimed at the effective measurement plan of discontinuity orientation on rock mass. The discontinuity orientation is expressed as three methods. strike/dip. dipdirection/dip (a three digit number / a two digit number) and right hand rule. Generally, strike/dip is measured with clinometer. and dipdirection/dip with silva compass(type15). A sign of strike/dip. discontinuity orientation is used to geological survey. and dipdirection/dip to engineering. Dipdirection/dip converted by strike/dip measured with clinometer is useful on the statistical analysis of a lot of data. To measure the azimuth of the dip with clinometer and to change strike/dip to dipdirection/dip may have potential errors in each person. The newly designed apparatus, clinometer equipped by a rotational azimuth plate and an arrow to measuring strike and dipdirection, has been developed to measure effectively the discontinuity orientation with two method (strike/dip and dipdirection/dip). The measuring method of discontinuity orientation with clinometer having newly designed apparatus is effective one for accurate measurement of strike as well as dipdirection which is degrees counted clockwise from true north. Used by clinometer with newly designed apparatus, concurrent measuring strike/dip and dipdirecton/dip of discontinuity is possible. In application to measuring discontinuity orientation on rock slope, it has been recognized that the newly designed method, unambiguously, led to drop measuring errors comparing with existing measuring apparatuses. Therefore, it is considered that measuring method of discontinuity orientation (strike/dip and dipdirecton/dip) by the newly designed apparatus is useful to one in geological engineering investigation of road design, and to unskilled investigator.

Study on Risk Priority for TBM Tunnel Collapse based on Bayes Theorem through Case Study (사례분석을 통한 베이즈 정리 기반 TBM 터널 붕괴 리스크 우선순위 도출 연구)

  • Kwon, Kibeom;Kang, Minkyu;Hwang, Byeonghyun;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.785-791
    • /
    • 2023
  • Risk management is essential for preventing accidents arising from uncertainties in TBM tunnel projects, especially concerning managing the risk of TBM tunnel collapse, which can cause extensive damage from the tunnel face to the ground surface. In addition, prioritizing risks is necessary to allocate resources efficiently within time and cost constraints. Therefore, this study aimed to establish a TBM risk database through case studies of TBM accidents and determine a risk priority for TBM tunnel collapse using the Bayes theorem. The database consisted of 87 cases, dealing with three accidents and five geological sources. Applying the Bayes theorem to the database, it was found that fault zones and weak ground significantly increased the probability of tunnel collapse, while the other sources showed low correlations with collapse. Therefore, the risk priority for TBM tunnel collapse, considering geological sources, is as follows: 1) Fault zone, 2) Weak ground, 3) Mixed ground, 4) High in-situ stress, and 5) Expansive ground. In practice, the derived risk priority can serve as a valuable reference for risk management, enhancing the safety and efficiency of TBM construction. It provides guidance for developing appropriate countermeasure plans and allocating resources effectively to mitigate the risk of TBM tunnel collapse.

Analysis on Scale Effects to Hydraulic Conductivities in Crystalline Rock (결정질암체의 수리전도도에 대한 규모종속에 관한 분석)

  • 박동극
    • The Journal of Engineering Geology
    • /
    • v.4 no.1
    • /
    • pp.13-28
    • /
    • 1994
  • Hydrogeologic characteristics of crystalline rock including discontinuities is defined by the hydraulic data from the in situ test and by analytical method. Methodology and procedure of the in situ test are used in accordance with test purpose, site condition and characteristics of host rock Hydraulic conductivities in crystalline rock including discontinuifies such as fractured zone and joint, are defined by packer test and slug test. The results indicate Hvorslev' s theory of ground water flow in NX borehole, that the shorter of test interval is, the higher hydraulic conductivity is. This is an indicafion of the fact that the hydraulic rneasured were governed by scale effect of test interval, even at same borehole. According to the result of packer tests in two boreholes, it is understood that hydraulic conductivifies show variations according to the effect of as order of tests. In the comparison of hydraulic conductivifies from both of open borehole tests, the results are relatively well correrated in values. The hydraulic conductivity in the test intervals induding hydrogeologically significant discontinuity shows relatively higher value of hydraulic conductivity in vertical distribution of full depth.

  • PDF

A Study on the Stability Analysis and Countermeasure of Tunnel Portal Failure Slope - in Suanbo Hot Springs 1 and 2 Tunnel Failure Site (터널 갱구부 붕괴 사면의 안정성 해석 및 보강공법에 관한 연구 - 수안보 온천 1, 2터널 붕괴 현장을 중심으로)

  • Baek, Yong;Koo, Ho-Bon;Yoo, Ki-Jeong
    • The Journal of Engineering Geology
    • /
    • v.12 no.4
    • /
    • pp.367-378
    • /
    • 2002
  • Recently, the number of tunnels on national roads has been increased due to the trend that construction of the large-scaled cut slopes is limited because of the environmental issues. Therefore, the slope failures of tunnel portal have often occurred. The tunnel portal in use has limitations on selection of the countermeasure and construction against slope failure. In the cases of Suanbo hot springs 1 and 2 tunnel portals, seedding was chosen and constructed as the countermeasureof slope failure when the tunnel was first built but collapsed in April, 2002. In this study, the failure sites were examined accurately through the site investigation and an efficient countermeasure according to stability analysis is presented. It is shown that it is very efficient to use resloping for Suanbo hot springs 1 tunnel and concrete buttress, rock anchor to reinforcement countermeasure, and attached rockfall prevention net by dividing the site into 3 sections for Suanbo hot springs 2 tunnel.

Effect of the Yeongcheon Dam Waterway Tunnel, Korea, on Local Groundwater Levels (영천댐 도수터널 주변지역 지하수위 영향 분석)

  • Gyu-Han Kim;Seong-Woo Moon;Yong-Seok Seo
    • The Journal of Engineering Geology
    • /
    • v.33 no.3
    • /
    • pp.461-474
    • /
    • 2023
  • The study area is located in Hyeonseo-myeon and Andeok-myeon of Cheongsong-gun, Korea around the Yeongcheon dam waterway tunnel, and in this paper, it is analyzed whether the groundwater level is recovered or not compared to groundwater level before waterway tunnel construction by measuring the groundwater level of 156 wells which were installed in areas near and away from the waterway tunnel. From September 2017 to August 2018, the groundwater level of the well was measured at least once a month, and as a result of groundwater level observation survey, the groundwater level of wells distributed in the directly affected zone by the waterway tunnel is relatively lower than that of the indirectly affected zone apart from the waterway tunnel. These results are estimated to be predominantly affected by the effect of waterway tunnel acting on geologic discontinuities rather than by terrain conditions, i.e. groundwater flows being leaked to the waterway tunnel through direct or indirect channels. Continuous monitoring and further investigation will be required to maintain groundwater facilities and preserve groundwater environments in the future.

Field Investigation and Stability Analysis of a Volcanic Rock Slope at the Song-Gok site, Wan-Do (완도 송곡지구 화산암류 비탈면의 현장조사 및 안정성 검토 사례 연구)

  • Kim, Hong-Gyun;Ok, Young-Seok;Kim, Seung-Hyun;Koo, Ho-Bon
    • The Journal of Engineering Geology
    • /
    • v.23 no.2
    • /
    • pp.149-160
    • /
    • 2013
  • Volcanic activity commonly creates a highly complicated volcanic complex due to the admixture of lava flow and sedimentation of volcanic ash. The Song-Gok site is composed of volcanic rocks that collapsed at the lower part of the slope, in combination with several discontinuities in and around a fault. The results of projection analysis indicated the possibility of plane, wedge, and toppling failure in the failure section. The results of discontinuity modeling using the Distinct Element Method (DEM) revealed a total displacement of 207 mm and a joint shear displacement of 114 mm. The yield surface zone was verified at the fault plane of the failure section. In geotechnical terms, volcanic rock slopes are characteristically vulnerable to failure because of differential weathering among the various rock types, the effect of groundwater based on the permeability of the rocks, and the presence of systematic joints generated by the cooling and contraction of lava. When considering the stability of a volcanic rock slope, it is necessary to consider data such as the geological features of the rock, as obtained through detailed geological survey, and variations in discontinuities and rock blocks.