Browse > Article

Effective Measuring Method of Discontinuity Orientation  

김해경 (전남대학교 지구환경과학부)
고영구 (전남대학교 과학교육학부)
Publication Information
The Journal of Engineering Geology / v.13, no.3, 2003 , pp. 321-334 More about this Journal
Abstract
This study is aimed at the effective measurement plan of discontinuity orientation on rock mass. The discontinuity orientation is expressed as three methods. strike/dip. dipdirection/dip (a three digit number / a two digit number) and right hand rule. Generally, strike/dip is measured with clinometer. and dipdirection/dip with silva compass(type15). A sign of strike/dip. discontinuity orientation is used to geological survey. and dipdirection/dip to engineering. Dipdirection/dip converted by strike/dip measured with clinometer is useful on the statistical analysis of a lot of data. To measure the azimuth of the dip with clinometer and to change strike/dip to dipdirection/dip may have potential errors in each person. The newly designed apparatus, clinometer equipped by a rotational azimuth plate and an arrow to measuring strike and dipdirection, has been developed to measure effectively the discontinuity orientation with two method (strike/dip and dipdirection/dip). The measuring method of discontinuity orientation with clinometer having newly designed apparatus is effective one for accurate measurement of strike as well as dipdirection which is degrees counted clockwise from true north. Used by clinometer with newly designed apparatus, concurrent measuring strike/dip and dipdirecton/dip of discontinuity is possible. In application to measuring discontinuity orientation on rock slope, it has been recognized that the newly designed method, unambiguously, led to drop measuring errors comparing with existing measuring apparatuses. Therefore, it is considered that measuring method of discontinuity orientation (strike/dip and dipdirecton/dip) by the newly designed apparatus is useful to one in geological engineering investigation of road design, and to unskilled investigator.
Keywords
discontinuity; strike/dip; dipdirection/dip; clinometer; silva compass(type15);
Citations & Related Records
연도 인용수 순위
  • Reference
1 거금도 연도교 가설공사(2단계) /
[ 대림산업주식회사 ] / 토질조사보고서
2 국도대체우회도로(둔덕-주삼)건설공사 /
[ 두산건설주식회사 ] / 토질조사보고서
3 국도대체우회도로(둔덕-주삼)건설공사 /
[ SK건설(주) ] / 토질조사보고서
4 군외-남창 도로확장공사 /
[ 대림산업주식회사 ] / 토질조사보고서
5 거금도 연도교 가설공사(2단계) /
[ 현대건설주식회사 ] / 토질조사보고서
6 /
[ Bieniawski,Z.T. ] / Engineering rock mass classification
7 New adjustment rating for application of Bieniawski classification to slpoes /
[ Romana,M. ] / Proc. Int. Symp. Rock Mech. Excav. Min. Civ. Works
8 /
[ ISRM ] / Rock characterization testing & monitoring
9 군외-남창 도로확장공사 /
[ 삼성물산(주) ] / 토질조사보고서
10 /
[ Priest,S.D. ] / Discontinuity Analysis for Rock Engineering
11 국도대체우회도로(둔덕-주삼)건설공사 /
[ 현대건설주식회사 ] / 토질조사보고서