• Title/Summary/Keyword: 지보 시스템

Search Result 71, Processing Time 0.029 seconds

Investigation of Seismic Response for Deep Temporary Excavation Retaining Wall Using Dynamic Centrifuge Test (동적원심모형실험을 통한 대심도 가설 흙막이 벽체 지진 시 거동 연구)

  • Yun, Jong Seok;Han, Jin-Tae;Kim, Jong-Kwan;Kim, Dongchan;Kim, Dookie;Choo, Yun Wook
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.11
    • /
    • pp.119-135
    • /
    • 2022
  • This paper used dynamic centrifuge tests to examine the seismic response for a deep temporary retaining wall with four input motions of 100, 1,000, and 2,400 years of return periods. The centrifuge model was designed based on an actual deep excavation design with a 50 m maximum excavation depth. The model backfill was prepared with dry silica sand at a relative density of 55%, and the retaining wall was modeled as a 24.8 m height diaphragm wall supported by struts. Acceleration response was amplified at the backfill surface, top of the wall, and near bedrock. However, in the middle of the model, input motion was de-amplified. The member forces of the wall and strut induced by the seismic load, which excited, were compared with the member force at rest condition. The wall's maximum negative and positive moments were increased to 36% and 10% compared to the maximum moment at rest. The maximum axial force increases to 70% of the at rest axial force on the bottom strut. The equivalent static analysis using Mononobe-Okabe (M-O) and Seed-Whitman (S-W) seismic earth pressures were compared to the centrifuge results. Considering the bending moment, the analysis results with the M-O theory underestimates but that with the S-W theory overestimates.

A numerical study of the influence of rock mass classes boundary on tunnel stability (암반 등급 경계가 터널 안정성에 미치는 영향에 관한 수치해석적 연구)

  • Kim, Gyeomyeon;Jung, Chanmook;Lee, Yongjun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.825-835
    • /
    • 2019
  • When the tunnel is designed, the ground is classified into several grades and the corresponding support system is applied according to the support pattern table. However, a simple pattern application based on rock grade does not take into account the longitudinal stress transitions occurring at rock grade boundaries. In this study, three-dimensional numerical analysis was performed to estimate the stress change in the longitudinal rock grade change of NATM tunnel, and the influence zone of load transfer was investigated using the influence line and trend line. As a result, the downward change of rock grade in the direction of tunnel excavation occurs in the range of 0.35~0.7D from low-strength rock to high-strength rock around the grade change boundary. It is necessary to apply a downward pattern of about 1.0D to the safety direction in consideration of the influence range of 0.35D to 0.7D.

Stability Assessment of Abandoned Gangway for Commercial Utilization of Services (서비스업 활용을 위한 광산 폐갱도의 안정성 평가)

  • SunWoo, Choon;Chung, So-Keul;Lee, Yun-Su;Kang, Sang-Soo;Kang, Jung-Seok
    • Tunnel and Underground Space
    • /
    • v.22 no.5
    • /
    • pp.297-309
    • /
    • 2012
  • The stability assessment of abandoned gangway for the purpose of services was performed. Among the many factors that affect the stability of openings, the span of the opening in a given rock mass condition provides an important element of design. In this paper, the stability of gangway was assessed by the critical span curves proposed by Lang, the modified Mathews'stability graph method and using support measures of the Q system. In the evaluation of stability as a whole the gangway is considered as stable. But the rockfalls of wedge-shaped blocks were expected in the area in which the horizontal joints of low angle appear. The support measures such as local rock bolts are required to use for commercial purposes of the abandoned gangway. And entrance section may require the particular attention as unstable section. Since there are so many spalling due to bad blasting in the roof and sidewall of gangway, the scaling operations should be followed primarily.

Performance of Innovative Prestressed Support Earth Retention System in Urban Excavation (도심지 굴착에 적용된 IPS 흙막이 구조물의 현장거동)

  • Kim Nak Kyung;Park Jong Sik;Jang Ho Joon;Han Man Yop;Kim Moon Young;Kim Sung Bo
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.2
    • /
    • pp.27-36
    • /
    • 2005
  • The performance of innovative prestressed support (IPS) earth retention system applied in urban excavation was presented and investigated. The IPS wales provide a high flexural stiffness to resist the bending by lateral earth pressure, and the IPS wales transfer lateral earth pressure to Corner struts. The IPS wale provides a larger spacing of support, economical benefit, construction easiness, good performance, and safety control. In order to investigate applicability and stability of the IPS earth retention system, the IPS system was instrumented and was monitored during construction. The IPS system applied in urban excavation functioned successfully. The results of the field instrumentation were presented. The measured performances of the IPS earth retention system were investigated and discussed.

Barton-Bandis 절리 모델에 의한 지하대공동 암주의 변형 특성 연구

  • 강추원;임한욱;김치환
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2001.03a
    • /
    • pp.118-131
    • /
    • 2001
  • 우리 나라의 양수발전소는 지금까지 단일공동을 굴착하였다. 그러나 양양 양수발전소는 두 개의 대공동 즉, 발전소와 주 변전소로 구성된다. 이 경우 공동 구조물의 안정성, 특히 두 공동사이에 형성되는 암주를 영구적으로 안전하게 유지 할 수 있도록 보장되어야 한다. 본 연구에서는 개별요소법을 이용하여 두 공동과 암주의 구조적 안정성을 평가하였으며, 구성모델로 Barton-Bandis의 절리모델을 이용하였다. 현지 암반의 초기응력, 자연절리면의 거칠기계수 불연속면의 공간적 분포 특성과 같은 중요한 요인들은 현지 조사를 통하여 구하였다. 이외에 두 가지 경우 즉, 무보강과 보강의 경우 지보시스템의 최적화를 분석하였으며, 또한 보강효과를 검토하였다. 연구결과 보강의 경우 수평변위와 절리의 전단변위가 감소되었으며 암주내 이완영역 역시 감소됨을 확인하였다. 두 공동사이에 있는 약 36m 두께의 암주에 적절한 보강조치를 취하여 안정성을 확보할 수 있었다.

  • PDF

Velocity and Pressure Measurement of Channel Cavity Flow by PTV (PTV에 의한 채널캐비티 유동의 속도 및 압력계측)

  • Cho, D.H.;Kim, J.G.;Lee, Y.H.
    • Solar Energy
    • /
    • v.17 no.3
    • /
    • pp.59-66
    • /
    • 1997
  • The present study adopted the PTV method for the velocity acquisition. The system consists of an image grabber built-in a personal computer and a laser-based sheet light projector and particle identification softwares. Velocity vectors are obtained, by PTV and they are used as velocity components for Poisson equation for pressure. Related boundary conditions and no-slip condition at solid wall and the linear velocity extrapolation on the upper side of cavity are well examined for the present study. For calculation of pressure, resolution of grid is basically $40{\times}40$ and 2-dimensional uniform mesh using MAC staggered grid is adopted. The result of experiment reveal that, newly suggested measuring method is capable of estimating pressure and velocity distribution of flow field reasonably.

  • PDF

PIV Measurement of Airflow in a Vertical Channel With Square Heat Source (정방형 발열체를 갖는 수직채널 내부의 공기유동 관한 PIV계측)

  • Bae, S.T.;Kim, D.K.;Kim, S.P.;Cho, D.H.;Lee, Y.H.
    • Solar Energy
    • /
    • v.17 no.3
    • /
    • pp.35-41
    • /
    • 1997
  • An experimental study was carried out in a vertical channel with square heat source by visualization equipment with laser apparatus. The image processing system consists of one commercial image board slit into a personal computer and 2-dimensional sheet light by Argon-Ion Laser with cylindrical lens and flow picture recording system. Instant simultaneous velocity vectors at whole field were measured by 2-D PIV system which adopted two-frame grey-level cross correlation algorithm. Heat source was uniform heat flux(5W). The obtained results show various flow patterns such as the kinetic energy distribution and the turbulent kinetic energy distribution.

  • PDF

Development of Ready-mixed Shotcrete II : Application Study (레디믹스트 숏크리트 개발 II : 적용성 평가)

  • Ma, Sang-Joon;Kim, Dong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5C
    • /
    • pp.187-202
    • /
    • 2011
  • In this Application Study based on the result of the Basic Study, the field test was performed to compare the quality of Ready-mixed shotcrete with that of the existing field mix shotcrete, and the long-term durability was evaluated as tunnel supporting. The plant manufacturing system was also designed to produce standardization materials, and the prototype products were produced with that system. The All-in-one silo mixer was designed and the field construction system using the All-in-one silo mixer was proposed to be most effectively applied Ready-mixed Shotcrete in construction fields. And the application of Ready-mixed Shotcrete was confirmed that more superior to the field mix Shotcrete by evaluating the Constructability and Economics.

A Study on Application for Deck Plate Substitute Type Wood System Form of Frame Type Parking Lot (골조형 주차장의 Deck Plate 대체형 목제 시스템 거푸집 적용성 연구)

  • Shin, Yong-Jae;Shin, Woon-Sik;Heo, Jae-Won;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.123-126
    • /
    • 2006
  • Existing Deck Plate for a one of system forms, there is various advantage and application actual results increasing rapidly. But design of deck is depending on engineering data collections or design data on deck manufacture ordinarily. When construct, is responsible for deflection occurrence, And Because confirmation of crack occurrence region is impossible, there is difficulty of repair, reinforcement about crack and water leakage. According to got following conclusion as result that economic performance, preservation administration and repair reinforcement develops easy using steel truss snap tie by wedge pin on coating plywood that is slab Panel Wood System Form method of construction there is Deck Plate's advantage. (1) In stab lower part is exposed disjointing in which a criminal is fastened to be interrogated after construction acceptance and repair, reinforcement of crack is possible (2) Construction cost curtailment effect of about 29.2% than conventional type and about 10% than deck plate (3) Construction period reduction of about 3 day than conventional type and about 0.3 day than deck plate (4) Labor curtailment effect more than about $29{\sim}50%$ from conventional type

  • PDF

Flood Control Effects by Parallel Reservoirs System Operation (병렬저수지 연계에 의한 홍수조절효과)

  • Ryu, Jae-Uk;Choe, Hyeon-Il;Ji, Hong-Gi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.342-345
    • /
    • 2010
  • 본 연구는 인접한 저수지 간의 연계운영을 통한 홍수조절 및 용수공급능력을 제고시키기 위한 저수용량 공유기법 개발의 일환으로 영주댐과 안동댐 및 임하댐의 병렬저수지 시스템을 연구대상으로 하였다. 홍수조절에 의한 병렬저수지의 연계운영기법으로서 병렬저수지 시스템인 영주/안동/임하댐 유역에서 홍수시 영주/임하댐의 저수량을 안동댐으로 전환시켜 영주/임하댐의 홍수조절능력을 제고시키고 안동댐의 저수량을 확보시켜 용수공급능력을 제고시킬 수 있는 방법을 연구하였다. 연구결과, 최적화계수(유량전환비:a)는 영주댐의 경우 1999년 9월 22일 ~ 26일 호우, 태풍 루사 및 태풍 매미일 때 모두 a=1.000, 임하댐의 경우 1999년 9월 22일 ~ 26일 호우, 태풍 루사 및 태풍 매미일 때 각각의 유량전환비는 $a_{1999}$=0.135, $a_{2002}$=0.372 및 $a_{2003}$=0.420으로 산정되었다. 영주댐에서 안동댐으로 그리고 임하댐에서 안동댐으로 전환할 수 있는 유량은 실제 호우적용시 전환유량은 매우 큰 것으로 확인되었다. 그리고 유량전환시 댐하류 안동, 지보, 달지지점에서 홍수 조절효과가 큼을 확인할 수 있었다.

  • PDF