Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2019.05a
/
pp.45-47
/
2019
과거 국내의 선사들의 주력선대는 8,000TEU급 이었으나, 현재 10,000TEU급 이상 선박의 대형화가 추세이다. 부산항 신항의 경우 2006년 1월 개항당시 4,000~7,000TEU급선박을 대상으로 수심 15m로 항만을 건설하였다. 10,000TEU급 이상의 선박이 안전하게 기항하려면 수심이 최소 16m 이상 확보되어야 하며, 이에 세계적인 컨테이너선 대형화에 발맞춰 수심 17m까지 증심준설 공사를 추진하고 있는 실정이다. 본 연구에서는 조류관측 자료를 토대로 부산항 신항 1-2단계 증심준설에 다른 부산신항만 해역의 하계조류 특성변화를 파악하였다.
The purpose of this paper is to verify the financial validity of dredging the port of Busan with the change of global port logistics circumstances. In order to do so, NPV, IRR, B/C ratio, DPP techniques are adopted. The whole dredging at Northern port area is supposed to be negative at the depth of 16m water. Based upon its financial validity, however, the priority is Shinsundae (option 1) followed by Shinsundae (option 1) and Gamman (option 1), Shinsundae (option 1) and Gamman (option 2), Shinsundae (option 2) and Gamman (option 2), Shinsundae (option 2) and Gamman (option 2) and ShinGamman in sequence. In addition to this, Busan New port is considered to be the positive financial validity at the dredging of 16m water depth. This is because the ultra containerships of over 8,000TEU are trying to call at the port and Hanjin shipping and Hyundai Merchant shipping companies which are now the most significant customers in Northern port are scheduled to divert it.
Journal of Korea Society of Industrial Information Systems
/
v.13
no.5
/
pp.29-43
/
2008
As the containership has been large-sized, it is important to analyze the social feasibility for the dredging the water-depth of Busan port. We tries to do an exploratory study to analyze the needs of the core port user group by using the survey methodology. We did the survey for the ocean carriers, terminal operating companies, ship pilots respectively. Collected data was analyzed by frequency and cross tabulation method. Result suggests that the Busan North Port should be dredged to the 16 meter depth and Busan New Port should be dredged to the 17 meter depth. And the priority of the depth dredging is ranked as Gamman pier, Sinsundae pier, New Port and Jasungdae pier.
There are two major types of underwater blasting at Korea, bridges and harbor construction work. Pier blasting for lay the foundation bridges construction is used dry excavation working (drilling and charging) after pump out water and then fire pump in water that is same as bench blasting. In contrast, underwater blasting for harbor construction and increase of harbor load depth is used to barge with digging equipment that is in oder to drilling on the surface and blasting work(charge, hook-up) under water. Thus, there are need to special concern such as charge method and hook-up method different from tunnel blasting work and bench blasting work. If do not use special concern breaks out dead pressure and mis fire because of there are so many difficult condition such as water pressure, obstruct field of vision. In this study underwater blasting at Busan Harbor Construction have consider with special concern that is plastic pipe charge method used to MegaMITE I and specialized buoy hook- up method make far initial system detonate on the surface used to TLD. The results is designed blast pattern charge per delay effect an inspection of verify between predict velocity and measure velocity. minimized break out mis fire consideration charge method, hook up method. According to result best underwater blasting design is 105mm drilling dia, MeGAMITE II, HiNLL Plus(non electric detonator).
In many cases of underwater blasting in South Korea, the special blasting is mainly used for deepening harbor, installing gas pipes, or well blasting to build a bridge. The procedure of well blasting is almost same with shaft blasting, but the difference is that water is filled in before blasting. In case of deepening blasting under water, the first step like drilling, arranging explosives, and wire connection is done on a barge, then the next step such as charging and tamping is accomplished under water by expert divers. Therefore, underwater blasting needs precise and exact plan before blasting. In this paper, authors would like to introduce a case of underwater blasting for deepening the Busan new port with emulsion explosives and non-electric detonators in order to get some of 8,500TEU out sized container vessels entered into the port and to make safe. Considering environment and vibration, the blasting was controlled to minimized the damage to the lighthouse nearby. It will be great help to many other blasting sites where emulsion explosives and non-electric detonators are used for underwater blasting through this case.
Lee Joong-Woo;Lee Hak-Seung;Lee Hoon;Yang Sang-Yong
Journal of Navigation and Port Research
/
v.30
no.1
s.107
/
pp.97-104
/
2006
Recently the first stage qf construction for Busan new port emerged over the sea surface at the north container terminal site. With this, there are lot of discussions and debates on increasing the water depth at the approaching channel and mooring basin from the existing 15m to 18m by dredging work in order to be able to serve 12,000TEU containership, and at the same time, correction to the reclamation plan of hinterland at the part of Undong Bay qf the new port site. Since the attack of typhoon 'Maemi' in 2003, it is expected that the design wave parameters for coastal and harbor structures in this area would be somewhat changed and so the extreme wave condition at each terminal and tranquility of berthing area does, and therefore, it is necessary to analyze the tranquility at each berth Hence in this study, we constructed a wave model for these conditions and performed simulation together with the circulation model simulation, compared with the field data collected The result showed the increase of the harbor response throughout the basin but not severe condition However, a certain location needs to be prepared for the rough sea condition when a severe typhoon hit the site.
Lee Joong-Woo;Lee Hak-Seung;Lee Hoon;Yang Sang-Yong
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2005.10a
/
pp.117-124
/
2005
Recently the first stage of construction for Busan new port emerged over the sea surface at the north container terminal site. With this, there are lot of discussions and debates on increasing the water depth at the approaching channel and mooring basin from the existing 15m to 18m by dredging work in order to be able to serve 12,000TEU containership, and at the same time, correction to the reclamation plan of hinterland at the part of Undong Bay of the new port site. Since the attack of typhoon 'Maemi' in 2003, it is expected that the design wave parameters for coastal and harbor structures in this area would be somewhat changed and so the extreme wave condition at each terminal and tranquility of berthing area does, and therefore, it is necessary to analyze the tranquility at each berth. Hence in this study, we constructed a wave model for these conditions and performed simulation together with the circulation model simulation, compared with the field data collected. The result showed the increase of the harbor response throughout the basin but not severe condition. However, a certain location needs to be prepared for the rough sea condition when a severe typhoon hit the site.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
v.1
/
pp.57-62
/
2006
Busan New Port, under construction aiming for the hub of Northeast Asia and Partly in operation, had damaged up to 48 billion Won due to Typhoon 'maemi' in 2003. The present criteria of domestic harbor design only describes about the critical wave height with respect to the size of vessel for harbor tranquility. The berth operation ratio which represents the annual available berthing days is depending on the efficiency of cargo handling work and this depends on the motion of the moored vessel due to the wave action and the characteristics of cargo gears. The motion of moored vessel might be related not only to the wave height but also to wave period. Furthermore, the berth operation ratio relies on external forces such as currents and winds, including the characteristics of mooring system and the specification of the moored vessel. In this study we only deal with berth operation ratio in normal sea state, considering wave and current by measured data and numerical calculation. Especially we tried to evaluate the berth operation ratio for each berth adopting the variation of dredging and reclamation plan and the change of wave environment during the process of the new port construction. For better understanding and analysis of wave transformation process, we applied the steady state spectral wave model and extended mild-slope wave model to the related site. This study summarizes comparisons of harbor responses predicted by two numerical predictions obtained at Busan New port site. Field and numerical model analysis was conducted for the original port plan and the final corrected plan.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.