Method of Transforming PDM Overlapping Relationships to BDM Overlapping Relationships in CPM Schedule (CPM 공정계획의 PDM 중복관계를 BDM 중복관계로 전환시키는 방법)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.144-152
    • /
    • 2012
  • The reason why most scheduling softwares currently using at construction projects adopt PDM (Precedence Diagramming Method) is that it can express an overlapping relationship between activities. However, the overlapping relationships in PDM are represented only by combinations of four overlapping types that connect the start and finish points of two activities, therefore, PDM cannot express efficiently the relationships between any middle points of two activities if they should be represented. This research proposes the method of transforming the four overlapping types of PDM to the overlapping relationships of BDM(Beeline Diagramming Method), new networking technique, that can connect the inter-relationships at any middle points of two activities as well as express multiple overlapping relationships. The proposed method will help not only to improve an efficiency of scheduling but also to upgrade the scheduling technique because BDM technique has a lot of unique advantages in scheduling.

A Note on Generalized Canonical Correlation Analysis Via an Extended Redundancy Analysis (중복분석의 확장과 이를 이용한 일반화 정준상관분석)

  • 강현철;김기영
    • The Korean Journal of Applied Statistics
    • /
    • v.13 no.1
    • /
    • pp.105-113
    • /
    • 2000
  • Wollenberg(1977)의 중복분석(redundancy analysis)을 두 개 이상의 변수집단이 주어져 있는 경우로 확장하고, 확장된 중복분석과 일반화 정준상관분석의 관계를 논의하며, 이 관계를 이용하여 새로운 형태의 일반화 정준상관분석을 제안한다.

  • PDF

Schedule Computation Method of Two-way Multiple Overlapping Relationships on BDM Technique (BDM 기법에서 양방향 다중 중복관계 일정계산 방법)

  • Kim, Seon-Gyoo;Noh, Seong-Beom;Lee, Yong-Hyun;Yu, Young-Jeong;Kim, Jin-Bong;Koo, Jae-Oh
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.120-127
    • /
    • 2012
  • Today, most construction projects have been higher, bigger, and more complicated gradually. So the domestic construction companies have been trying to understand overall construction process and relationships between activities, and adopted various management techniques and tools in order to perform a systematic and effective scheduling. However numerous problems have been occurred on the practical applications because most existing scheduling softwares adapt ADM and PDM techniques. One of them, PDM, is so uneffective because it represents the overlapping relationships between two consecutive activities only by the combinations of start and finish points between two activities. In order to supplement the demerit of PDM, Beeline Diagramming Method(BDM) is proposed as a new networking technique, it can represent two-way multiple overlapping relationships between two activities directly. However there are occurring a loop phenomenon on applying two-way multiple overlapping relationships. This research proposes and verifies the schedule computation method of two-way multiple overlapping relationships on the BDM network.

Vertical Relation Partitioning Method With Attribute Replications (속성 중복을 고려한 릴레이션의 수직 분할방법)

  • 유종찬;김재련
    • Proceedings of the Korea Database Society Conference
    • /
    • 1997.10a
    • /
    • pp.504-514
    • /
    • 1997
  • 관계형 데이터베이스의 성능을 향상시키는데 중요한 요소 중의 하나는 트랜잭션을 처리하기 위해 데이터를 디스크에서 주기억장치로 옮기는데 필요한 디스크 액세스(access) 횟수이다. 본 연구는 관계형 데이터베이스에서 트랜잭션을 처리할 때, 릴레이션(relation)을 수직분할하여 디스크에 단편(fragment)으로 저장하므로써 필요한 단편만 액세스하여 액세스 횟수를 감소시키는데 목적이 있다. 단편에 속성을 중복할당하여 수직분할하므로써 트랜잭션을 만족시키는 단편의 수를 감소시켜 중복할당을 고려하지 않은 방법보다 디스크 액세스 횟수를 감소시킬 수 있다. 갱신트랜잭션의 경우 하나의 속성이 갱신되면 중복된 속성을 모두 갱신하여야 하므로 액세스 횟수가 증가하지만, 조회트랜잭션의 경우 각 단편에 속성을 중복할당하여 액세스 횟수를 감소시킬 수 있다. 본 연구에서는 속성의 중복을 허용하여 단편을 구성하는 경우에 중복을 고려하지 않은 경우를 포함하므로 효과적으로 디스크 액세스 횟수를 감소시킬 수 있다. 본 연구에서는 중복할당을 고려하여 디스크의 액세스 횟수를 최소화시킬 수 있는 수직분할문제의 0-1 정수계획모형을 개발하고, 모형에 대한 최적해법으로 분지한계법을 제안한다.

  • PDF

A Vertical File Partitioning Method Allowing Attribute Replications (속성 중복을 허용한 파일 수직분할 방법)

  • 유종찬;김재련
    • The Journal of Information Technology and Database
    • /
    • v.4 no.2
    • /
    • pp.3-19
    • /
    • 1998
  • 관계형 데이터베이스 성능을 향상시키는데 중요한 요소 중의 하나는 트랜잭션을 처리하기 위해 데이터를 디스크에서 주 기억장치로 옮기는데 필요한 디스크 액세스(access) 횟수이다. 본 연구는 관계형 데이터베이스에서 트랜잭션을 처리할 때, 릴레이션(relation)을 속성의 중복할당을 허용하여 분할하고, 디스크에 단편(fragment)으로 저장하므로써 필요한 단편만을 액세스하여 디스크의 액세스 횟수를 줄이는 방법을 연구하였다. 본 연구에서는 속성의 중복할당을 허용하여 디스크의 액세스 횟수를 최소화시킬 수 있는 수직분할문제에 수리모형을 조회, 갱신트랙잭션을 모두 고려하여 0-1 정수계획법으로 개발하였다. 또한 모형에 대한 최적해법으로 분지한계법을 제안하였으며, 분지한계법으로 큰 문제를 푸는데는 많은 시간이 소요되므로 계산량을 줄일 수 있는 초기처리방법과 비용계산방법을 제안하였다. 속성의 중복을 허용하여 구한 해가 중복을 고려하지 않은 경우의 해보다 디스크 액세스횟수가 감소한 것으로 나타났으며, 갱신트랜?션의 수가 증가함에 따라 중복되는 속성의 수가 감소하는 결과를 나타내었다.

System Optimization Technique using Crosscutting Concern (크로스커팅 개념을 이용한 시스템 최적화 기법)

  • Lee, Seunghyung;Yoo, Hyun
    • Journal of Digital Convergence
    • /
    • v.15 no.3
    • /
    • pp.181-186
    • /
    • 2017
  • The system optimization is a technique that changes the structure of the program in order to extract the duplicated modules without changing the source code, reuse of the extracted module. Structure-oriented development and object-oriented development are efficient at crosscutting concern modular, however can't be modular of crosscutting concept. To apply the crosscutting concept in an existing system, there is a need to a extracting technique for distributed system optimization module within the system. This paper proposes a method for extracting the redundant modules in the completed system. The proposed method extracts elements that overlap over a source code analysis to analyze the data dependency and control dependency. The extracted redundant element is used to program dependency analysis for the system optimization. Duplicated dependency analysis result is converted into a control flow graph, it is possible to produce a minimum crosscutting module. The element extracted by dependency analysis proposes a system optimization method which minimizes the duplicated code within system by setting the crosscutting concern module.

Near Duplicate News Combining System to Prevent Information Loss Due to Deduplication of News (뉴스 중복 제거에 따른 정보 유실 방지하기 위한 중복 뉴스 결합 시스템)

  • Kim, Tae-Hwan;Choi, Won-Jae;Kim, Jung-Sun
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2020.07a
    • /
    • pp.391-392
    • /
    • 2020
  • 본 논문에서는 중복 데이터가 가장 많은 인터넷 뉴스 상에서 중복 뉴스를 제거하는 경우 중복 뉴스로 판단되는 유사 중복 문서를 제거할 때 정보의 유실이 발생한다. 본 논문에서는 인터넷 뉴스를 대상으로 유사 중복 뉴스를 제거할 때 발생하는 정보의 유실을 해결하기 위해 제거 된 뉴스와 결합하여 새로운 뉴스를 만드는 중복 뉴스 결합 시스템을 제안한다. 제안하는 방법은 뉴스의 기본 문장과 탐지된 중복 뉴스의 문장 간의 관계 유사도를 활용하여 유실 된 정보를 파악하고 파악된 결과를 기본 뉴스에 결합하여 정보의 유실을 최소화 시키는 것을 실험을 통해 보였다. 향후 뉴스분야뿐만 아니라 중복 문서 제거가 필요한 문서를 다루는 모든 분야에서 정보의 유실을 최소화하기 위한 방법으로 활용할 수 있을 것으로 기대 한다.

  • PDF

An Efficient Transformation Technique from Relational Schema to Redundancy Free XML Schema (관계형 스키마로부터 중복성이 없는 XML 스키마로의 효율적인 변환 기법)

  • Cho, Jung-Gil
    • Journal of Internet Computing and Services
    • /
    • v.11 no.6
    • /
    • pp.123-133
    • /
    • 2010
  • XML has been become the new standard for publishing and exchanging data on the Web. However, most business data is still stored and maintained in relational database management systems. As such, there is an increasing need to efficiently publish relational data as XML data for Internet-based applications. The most important issue in the transformation is to reflect structural and semantic relations of RDB to XML schema exactly. Most transformation approaches have been done to resolve the issue, but those methods have several problems. In this paper, we discuss algorithm in transforming a relational database schema into corresponding XML schema in XML Schema. We aim to achieve not only explicit/implicit referential integrity relation information but also high level of nested structure while introducing no data redundancy for the transformed XML schema. To achieve these goals, we propose a transformation model which is redundancy free and then we improve the XML Schema structure by exploring more nested structure.

Requirements Redundancy and Inconsistency Analysis for Use Case Modeling (유스케이스 모델링을 위한 요구사항 중복 및 불일치 분석)

  • 최진재;황선영
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.7
    • /
    • pp.869-882
    • /
    • 2004
  • This paper proposes an effective method to create logically consistent and structured requirement model by applying consistency control approach of the formal method to the use-case modeling. This method integrates the multi-perspective scattered requirement segments that may overlap and conflict each other into a structured requirement model. The model structure can be analyzed based on context goal and concerned area overlap analysis. The model consistency can be achieved by using specification overlap-based consistency checking method as an integration vehicle. An experimental application to case study shows that the Proposed method can successfully identify requirement overlaps and inconsistency. It can also transfer multi-viewpoint requirement segments into a consistently integrated use-case model to clarify software behaviors and functionality This method helps users to enhance capability to identify specification inconsistency in the use-case modeling at the early stage of software engineering development. The proposed approach can also facilitate communication between users and developers to ensure customer satisfaction.

A Parallel Task Allocation Algorithm improved Duplication Steps (중복 단계를 개선한 병렬 타스크 할당 알고리즘)

  • 이재관;김창수
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 1998.05a
    • /
    • pp.342-347
    • /
    • 1998
  • 병렬 프로그램의 스케줄링 기법에 있어, 타스크 중복 알고리즘은 리스트 스케줄링 알고리즘에 비해 상대적으로 새로운 접근 방식이다. 타스크 중복이란 어떤 프로세서에 할당되어 있는 중요한(critical) 타스크들을 다른 프로세서에 중복시켜, 그 타스크들이 중복 실행하도록 프로그램을 스케쥴하는 것이다. 따라서, 중요한 타스크들이 같은 프로세서내에 있게 되어, 다른 타스크들의 시작 시간(start time)을 줄일 수 있게 된다. 이는 결국 전체 프로그램의 스케줄 길이(schedule length)를 줄이게 된다. 병렬 프로그램의 스케줄링 목적은 프로그램의 스케쥴 길이를 최소화하고, 스케줄의 complexity를 줄이는 것이다 그러나, 스케줄 길이와 complexity는 상호 trade-off 관계이다 본 논문에서는 기존의 중복 알고리즘과 비교하여, 스케쥴 길이를 승가 시키지 않으면서, complexity를 같거나 더 적게하는 알고리즘을 제시하여 컴파일 시간을 향상시키고자 한다.

  • PDF